Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 21 Online
» 2550 Today
» 4163 Yesterday
» 15956 Week
» 68972 Month
» 188499 Year
» 3215352 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
Great Northern Railway 1684 m/e 06/1921
London and North Eastern Railway (1924) 4684   19/04/1924
London and North Eastern Railway (1946) 1774   17/11/1946
British Railways 61774   26/06/1948

Names Carried
Date From Name
07/1933 LOCH GARRY

Locomotive Specifics
Designer N. Gresley
Class K2
Company History GNR/LNER
Rebuild History
ClassFrom
K2/106/1921
Wheels 2-6-0
Builder Kitson
Order Number 492T
Works Number 5334
Fittings (as built)
Engine Brakes Vacuum
To Service During 06/1921 to New England (NWE)
Withdrawal Wed 16/04/1958 off Eastfield (65A)
Service Life 36 yrs, 10 mths , 16 dys

Disposal
Scrapping During y/e 1958

Notes
Notes Cut up at Kilmarnock

Allocations
Code Subsequent Codes Name From Date
NWE   New England (New) m/e 06/1921
EFD   Eastfield on 17/11/1931
STM   St Margarets m/e 02/1940
EFD   Eastfield m/e 09/1942
     Withdrawn on 16/04/1958

SLS Allocations*
Type Code Name From Date
WDN   on 16/04/1958

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
06/1921 Diagram 3 boiler fitted (number 7605)
19/04/1924 Diagram 3 boiler fitted (number 7464)
03/07/1926 Diagram 3 boiler fitted (number 7838)
24/10/1931 Diagram 3 boiler fitted (number 7470)
22/04/1936 Diagram 3 boiler fitted (number C1787)
30/11/1940 Diagram 3 boiler fitted (number C1828)
10/10/1945 Diagram 3 boiler fitted (number 8562)
06/04/1946 Diagram 3 boiler fitted (number 9151)
20/08/1949 Diagram 3 boiler fitted (number C1827)
14/08/1954 Diagram 3 boiler fitted (number 21174)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Doncaster Works 28/11/1923 19/04/1924 144 days General Boiler number 7464 (Diagram 3)
Renumbered to LNER (1924) number 4684
 
Doncaster Works 15/03/1926 03/07/1926 111 days General Boiler number 7838 (Diagram 3)
 
Doncaster Works 16/11/1928 03/01/1929 49 days General Altered to GE gauge
 
Doncaster Works 24/08/1929 28/09/1929 36 days General    
Doncaster Works 03/10/1931 24/10/1931 22 days General Boiler number 7470 (Diagram 3)
 
Cowlairs Works 1933 01/01/1933   Unknown Regime    
Cowlairs Works 1934 02/11/1934   General Side window cab & drop grate fitted
 
Cowlairs Works 03/1936 22/04/1936   General Boiler number 7455 (Diagram 3)
 
Cowlairs Works 1937 19/08/1937   General    
Cowlairs Works 1938 13/10/1938   Light Repair    
Cowlairs Works 1939 14/10/1939   General    
Cowlairs Works 1939 11/1939   Light Repair Cab screens fitted
 
Cowlairs Works 1940 15/08/1940   Light Repair    
Cowlairs Works 1940 30/11/1940   General Hudd A.T.C. fitted
Boiler number C1828 (Diagram 3)
 
Cowlairs Works 1941 14/06/1941   Heavy Casual Boiler number 21117 (Diagram 3)
 
Cowlairs Works 1941 03/09/1941   Light Repair    
Cowlairs Works 1942 11/07/1942   Light Repair Hudd removed
 
Cowlairs Works 1942 04/07/1942   Light Repair    
Cowlairs Works 1943 08/03/1943   Heavy    
Cowlairs Works 1943 21/12/1943   Light Repair    
Cowlairs Works 1945 10/03/1945   Light Repair    
Cowlairs Works 1945 23/11/1945   Unknown Regime Snow plough fitted
 
Cowlairs Works 07/09/1945 10/10/1945 34 days General Boiler number 8562 (Diagram 3)
 
Cowlairs Works 1946 06/04/1946   Heavy Casual Boiler number 21188 (Diagram 3)
 
Cowlairs Works 09/04/1947 08/05/1947 30 days Heavy    
Cowlairs Works 1948 26/06/1948   Light Repair Renumbered to BR 61774
 
Cowlairs Works 17/02/1949 20/08/1949 185 days General Boiler number 21106 (Diagram 3)
 
Cowlairs Works 30/01/1951 03/03/1951 33 days Light Intermediate    
Cowlairs Works 24/06/1952 18/07/1952 25 days Light Intermediate    
Cowlairs Works 10/06/1954 14/08/1954 66 days General Boiler number 21174 (Diagram 3)
 
Cowlairs Works 23/05/1955 09/07/1955 48 days Light Casual    
Cowlairs Works 07/01/1956 11/02/1956 36 days Heavy Intermediate    
Cowlairs Works 27/08/1956 15/09/1956 20 days Light Casual    
Cowlairs Works 28/11/1956 19/01/1957 53 days Unclassified    
Cowlairs Works 06/03/1957 16/03/1957 11 days Unclassified    

Mentions ...
Report Date Title Report Source
19/06/1948 Cowlairs Works (Erecting Shop) Locomotives in the yard awaiting repair were Nos. 502, 1745, 2436/39, 4532, 4600, 4791, 5237, 5913, 8118, 8350, 8955, 9178, 9503/11, 61002 an 61735-the last two being lettered B.R. Locomotives in the Works were: Stripping Pit Nos. 1102, 9927; Erecting Shop Nos. 1116, 1774/75/77/92/94, 1885, 1916/95, 2686/90, 4524/50/60/89, 4821, 7492, 8567, 9126/45, 61767; Steaming Pits Nos. 1787, 4925, 61134, 61292, 69206; Paint Shop Nos. 1101, 1783. 61292 is fitted with ex L.M.S. tablet catcher and is to be used on Perth-Inverness trials. SLS/194808

Summary
Date Event Details Source See Also
06/1921 To Service To service as Great Northern Railway Number 1684
Built at Kitson, Works Number 5334
Allocated to New England (NWE)
Diagram 3 boiler fitted
   
28/11/1923 Works Visit Works Visit - Doncaster Works (General) - Arr: 28/11/1923. Dep: 19/04/1924.
Work undertaken:
Boiler number 7464 (Diagram 3)
Renumbered to LNER (1924) number 4684
   
15/03/1926 Works Visit Works Visit - Doncaster Works (General) - Arr: 15/03/1926. Dep: 03/07/1926.
Work undertaken:
Boiler number 7838 (Diagram 3)
   
16/11/1928 Works Visit Works Visit - Doncaster Works (General) - Arr: 16/11/1928. Dep: 03/01/1929.
Work undertaken:
Altered to GE gauge
   
24/08/1929 Works Visit Works Visit - Doncaster Works (General) - Arr: 24/08/1929. Dep: 28/09/1929.    
03/10/1931 Works Visit Works Visit - Doncaster Works (General) - Arr: 03/10/1931. Dep: 24/10/1931.
Work undertaken:
Boiler number 7470 (Diagram 3)
   
17/11/1931 Allocation Reallocated to Eastfield (EFD)    
1933 Works Visit Works Visit - Cowlairs Works (Unknown Regime) - Arr: ?/1933. Dep: 01/01/1933.    
07/1933 Naming Named 'LOCH GARRY'    
1934 Works Visit Works Visit - Cowlairs Works (General) - Arr: ?/1934. Dep: 02/11/1934.
Work undertaken:
Side window cab & drop grate fitted
   
03/1936 Works Visit Works Visit - Cowlairs Works (General) - Arr: ?/03/1936. Dep: 22/04/1936.
Work undertaken:
Boiler number 7455 (Diagram 3)
   
1937 Works Visit Works Visit - Cowlairs Works (General) - Arr: ?/1937. Dep: 19/08/1937.    
1938 Works Visit Works Visit - Cowlairs Works (Light Repair) - Arr: ?/1938. Dep: 13/10/1938.    
1939 Works Visit Works Visit - Cowlairs Works (General) - Arr: ?/1939. Dep: 14/10/1939.    
1939 Works Visit Works Visit - Cowlairs Works (Light Repair) - Arr: ?/1939. Dep: ?/11/1939.
Work undertaken:
Cab screens fitted
   
1940 Works Visit Works Visit - Cowlairs Works (General) - Arr: ?/1940. Dep: 30/11/1940.
Work undertaken:
Hudd A.T.C. fitted
Boiler number C1828 (Diagram 3)
   
1940 Works Visit Works Visit - Cowlairs Works (Light Repair) - Arr: ?/1940. Dep: 15/08/1940.    
02/1940 Allocation Reallocated to St Margarets (STM)    
1941 Works Visit Works Visit - Cowlairs Works (Heavy Casual) - Arr: ?/1941. Dep: 14/06/1941.
Work undertaken:
Boiler number 21117 (Diagram 3)
   
1941 Works Visit Works Visit - Cowlairs Works (Light Repair) - Arr: ?/1941. Dep: 03/09/1941.    
1942 Works Visit Works Visit - Cowlairs Works (Light Repair) - Arr: ?/1942. Dep: 04/07/1942.    
1942 Works Visit Works Visit - Cowlairs Works (Light Repair) - Arr: ?/1942. Dep: 11/07/1942.
Work undertaken:
Hudd removed
   
09/1942 Allocation Reallocated to Eastfield (EFD)    
1943 Works Visit Works Visit - Cowlairs Works (Heavy) - Arr: ?/1943. Dep: 08/03/1943.    
1943 Works Visit Works Visit - Cowlairs Works (Light Repair) - Arr: ?/1943. Dep: 21/12/1943.    
1945 Works Visit Works Visit - Cowlairs Works (Light Repair) - Arr: ?/1945. Dep: 10/03/1945.    
1945 Works Visit Works Visit - Cowlairs Works (Unknown Regime) - Arr: ?/1945. Dep: 23/11/1945.
Work undertaken:
Snow plough fitted
   
07/09/1945 Works Visit Works Visit - Cowlairs Works (General) - Arr: 07/09/1945. Dep: 10/10/1945.
Work undertaken:
Boiler number 8562 (Diagram 3)
   
1946 Works Visit Works Visit - Cowlairs Works (Heavy Casual) - Arr: ?/1946. Dep: 06/04/1946.
Work undertaken:
Boiler number 21188 (Diagram 3)
   
17/11/1946 Renumbered Renumbered to 1774    
09/04/1947 Works Visit Works Visit - Cowlairs Works (Heavy) - Arr: 09/04/1947. Dep: 08/05/1947.    
1948 Works Visit Works Visit - Cowlairs Works (Light Repair) - Arr: ?/1948. Dep: 26/06/1948.
Work undertaken:
Renumbered to BR 61774
   
17/02/1949 Works Visit Works Visit - Cowlairs Works (General) - Arr: 17/02/1949. Dep: 20/08/1949.
Work undertaken:
Boiler number 21106 (Diagram 3)
   
30/01/1951 Works Visit Works Visit - Cowlairs Works (Light Intermediate) - Arr: 30/01/1951. Dep: 03/03/1951.    
24/06/1952 Works Visit Works Visit - Cowlairs Works (Light Intermediate) - Arr: 24/06/1952. Dep: 18/07/1952.    
10/06/1954 Works Visit Works Visit - Cowlairs Works (General) - Arr: 10/06/1954. Dep: 14/08/1954.
Work undertaken:
Boiler number 21174 (Diagram 3)
   
23/05/1955 Works Visit Works Visit - Cowlairs Works (Light Casual) - Arr: 23/05/1955. Dep: 09/07/1955.    
07/01/1956 Works Visit Works Visit - Cowlairs Works (Heavy Intermediate) - Arr: 07/01/1956. Dep: 11/02/1956.    
27/08/1956 Works Visit Works Visit - Cowlairs Works (Light Casual) - Arr: 27/08/1956. Dep: 15/09/1956.    
28/11/1956 Works Visit Works Visit - Cowlairs Works (Unclassified) - Arr: 28/11/1956. Dep: 19/01/1957.    
06/03/1957 Works Visit Works Visit - Cowlairs Works (Unclassified) - Arr: 06/03/1957. Dep: 16/03/1957.    
1958 Scrapped Scrapped    
16/04/1958 Withdrawn Condemned as 61774 from Eastfield (65A)    

prev prev