Beyer-Peacock 35 B-B
Locomotive ConstructionThe following graph shows the number of locomotives built by year. The first locomotive was delivered in May 1961 and the last in February 1964. A total of 101 locomotives were built between 1961 and 1964. |
|
Locomotive WithdrawalsThe following graph shows the number of locomotives withdrawn by year. The first locomotive was withdrawn in September 1971 and the last in March 1975. A total of 101 locomotives were withdrawn between 1971 and 1975. |
|
Class LifespanThis graph show the relationship between builds and withdrawals. The first locomotive was built in May 1961 and the last was withdrawn in March 1975. |
|
Class StockThis graph shows the number of locomotives in this class, by year, over the entire lifespan of the class. This information illustrates how rapidly/slowly a class may have been constructed or withdrawn from service. |
|