SR Maunsell "N1" Class 2-6-0
Locomotive ConstructionThe following graph shows the number of locomotives built by year. The first locomotive was delivered in March 1923 and the last in November 1930. A total of 6 locomotives were built between 1923 and 1930. |
Locomotive WithdrawalsThe following graph shows the number of locomotives withdrawn by year. The first locomotive was withdrawn in November 1962 and the last in November 1962. A total of 6 locomotives were withdrawn in 1962. |
Class LifespanThis graph show the relationship between builds and withdrawals. The first locomotive was built in March 1923 and the last was withdrawn in November 1962. |
Class StockThis graph shows the number of locomotives in this class, by year, over the entire lifespan of the class. This information illustrates how rapidly/slowly a class may have been constructed or withdrawn from service. |