NBR/LNER Reid "D34" Class 4-4-0
Locomotive ConstructionThe following graph shows the number of locomotives built by year. The first locomotive was delivered in September 1913 and the last in September 1920. A total of 32 locomotives were built between 1913 and 1920. |
|
Locomotive WithdrawalsThe following graph shows the number of locomotives withdrawn by year. The first locomotive was withdrawn in February 1946 and the last in December 1962. A total of 32 locomotives were withdrawn between 1946 and 1962. |
|
Class LifespanThis graph show the relationship between builds and withdrawals. The first locomotive was built in September 1913 and the last was withdrawn in December 1962. |
|
Class StockThis graph shows the number of locomotives in this class, by year, over the entire lifespan of the class. This information illustrates how rapidly/slowly a class may have been constructed or withdrawn from service. |
|