Menu
Quick Search
Enter locomotive number in the box below and press 'Go'!
In Touch
Donations
Counter
Visitor Statistics
|
» 24 Online
» 1443 Today
» 5784 Yesterday
» 7227 Week
» 28616 Month
» 148143 Year
» 3174996 Total
|
Record: 10235 (26/09/2023)
(Free MySQL Counter)
|
BaR/GWR "C Rbld" Class 2-4-2T
General
Introduced |
1898 |
Pre-Grouping Company |
Barry Railway |
Grouping Company |
Great Western Railway |
Wheel Arrangement |
2-4-2T |
Conversions from other classes |
2 |
Historical Data |
Rebuilds of 2 of the Barry Railway 2-4-0T engines (and subsequently a 3rd which was sold to the Port Talbot Railway). |
|
|
|
Power
Variant Introduced |
1889 |
Tractive Effort |
14,040lbs |
Inside Cylinders |
17" x 24" (2 off) |
Inside Valves |
Slide |
Wheels
Pony |
3' 6" |
Drivers |
5' 3" |
Truck |
3' 6" |
Total Wheelbase |
21' 9" |
Descriptive Wheelbase |
7' 6" + 7' 9" + 6' 6" = 21' 9" |
Dimensions
Weight (in running order) |
50t 15cwt |
Adhesive Weight |
29t 10cwt |
Maximum Axle Load |
16t 14cwt |
Water Capacity |
1,370gal |
Coal Capacity |
2t 5cwt |
Boiler & Firebox
Boiler Diagram |
? |
Boiler Max Diameter |
4' 2" |
Boiler Min Diameter - tapered boiler |
4' 1" |
Boiler Barrel Length |
10' 4" |
Boiler Pressure |
150lbs |
Firebox Type |
Round Top |
Firebox Length |
5' |
Firebox Grate Area |
14.25ft2 |
Firebox Heating Surface |
86ft2 |
Tube Number |
172 |
Tube Diameter |
2" |
Tube Area |
955ft2 |
Total Evaporative Area |
1041ft2 |
|