Menu
Quick Search
Enter locomotive number in the box below and press 'Go'!
In Touch
Donations
Counter
Visitor Statistics
|
» 11 Online
» 60 Today
» 1521 Yesterday
» 60 Week
» 5404 Month
» 575333 Year
» 2975797 Total
|
Record: 10235 (26/09/2023)
(Free MySQL Counter)
|
GCR/LNER Robinson "C13" Class 4-4-2T
General
Designer |
John Robinson |
Introduced |
1903 |
Pre-Grouping Company |
Great Central Railway |
Grouping Company |
London and North Eastern Railway |
Description (1957) |
Class C13. G.C.R. Robinson 5'7" 4-4-2T's, built 1903-5 and later superheated. All were in service until 1952 and in early 1957 several were still running. |
Wheel Arrangement |
4-4-2T |
Number Built as C13 |
40 |
First in Service |
03/1903 |
Last in Service |
01/1960 |
Manufacturers |
|
|
|
|
Power
Variant Introduced |
1903 |
Tractive Effort |
17,100lbs |
Inside Cylinders |
18" x 26" (2 off) |
Inside Valves |
Slide |
Inside Motion |
Stephenson |
Wheels
Pony |
3' 6" |
Drivers |
5' 7" |
Truck |
3' 9" |
Locomotive Wheelbase |
29' 101⁄2" |
Total Wheelbase |
29' 101⁄2" |
Descriptive Wheelbase |
6' 0" + 7' 5" + 9' 1" + 7' 4½" = 29' 10½" |
Dimensions
Length (over buffers) |
40' 84⁄5" |
Weight (in running order) |
66t 13cwt |
Adhesive Weight |
37t 0cwt |
Maximum Axle Load |
18t 10cwt |
Water Capacity |
1,450gal |
Coal Capacity |
3t 13cwt |
Boiler & Firebox
Boiler Diagram |
22Sup |
Boiler Max Diameter |
4' 4" |
Boiler Barrel Length |
11' |
Boiler Pressure |
160lbs |
Boiler Pitch |
7' 91⁄2" |
Firebox Length |
6' 4" |
Firebox Grate Area |
19.59ft2 |
Firebox Heating Surface |
108ft2 |
Tube Number |
90 |
Tube Diameter |
17⁄8" |
Tube Area |
503ft2 |
Flue Elements |
18 |
Flue Diameter |
51⁄4" |
Flue Area |
282ft2 |
Total Evaporative Area |
893ft2 |
Superheater Elements |
18 |
Superheater Element Diameter |
11⁄16" |
Superheater Element Area |
138ft2 |
|