31/10/1946 |
General |
The 12 noon Bristol to Paddington is always double headed (except Friday and Saturday). Locos, noted recently 6962 piloted by 5025 (15/10); 1005 piloted by 4073 (5/9); and 6968 piloted by 5019 (23/10). On 16/11 the 4.10 p.m. Paddington to Birkenhead was worked by 1003 (pilot) and 4053 |
SLS/194701 |
30/09/1947 |
Swindon Works |
Locos. entering Works during September included: Nos. 1005, 1925, 1935, 2112, 2148, 2195, 2444, 2551, 2612, 3005, 3017, 3022, 3023, 5318, 5319, 5335, 5398, W.D. 77368, 78543 an 79274. Works' pilots recently have been: Nos. 200, 2723, 2731, 2733 an 2768. No. 5049 CDF (ex Works 23/9) has been fitted with an experimental Swindon design mechanical lubricator (similar to that fitted to No. 4905) and also a 4-row superheater. The present batch of new 'Hall' Class locos. which are of the modified or '6959' Class are being fitted with straight sided tenders; No. 6974 and onwards are being lined out. |
SLS/194711 |
31/07/1949 |
Swindon Works |
New Work July: Nos. 1501 (1/7), 1502 (27/7). Both are unlined black. Locomotives entering Works during July included: Nos. 1005/12/25, 1467/68, 2206, 2856/86, 2920, 3663, 3779, 3853, 4013/41/56/61, 4133, 4381, 4631, 4901/43, 5050/69, 5238, 5369, 5552/59, 5918, 6003, 6103/08/22, 6320 (for re-conversion), 6336/45/54, 6417, 6804/38, 6910, 7307, 7809, 7905, 8762. Condemned: 2708 an 9087. No. 3837 (ex 4854) has been re-converted to coal-burning. No. 6020 has been painted blue, while No. 4961 has been Painted black and fully lined. The first of the contractor built series of 94XX arrived on Works on 27/7 viz: Nos. 8400 an 8401; they have entered shops to have the A.T.C. gear fitted. Works' Nos. checked are: Bagnall 2910/11 of 1949. Awaiting Works at the east end of the yard- were Nos. 1000, 2708, 2875, 3635, 4981, 5057, 5554/57, 6844; No. 2863 (ex 4805-oil-burning) was also in evidence. B shop contained Nos. 1363, 1467/68, 2206/11, 2572, 3663/77, 4631, 6408/09/17, 7735, 9638. New engines from Bagnall's were Nos. 8400/1 (makers Nos. 2910/1) and Swindon construction included Nos. 7026 (painted), 7027, 1504 (painted), 1505 and the frames of a diesel (Lot 363). Barry 0-6-2T's Nos. 212, 213 an 246 were acting as Works' shunters. |
SLS/194909 |
31/08/1949 |
Swindon Works |
New Work August: Nos. 7025 Sudeley Castle PDN (2/8), 7026 Tenby Castle (15/8), 7027 Thornbury Castle LA (25/8); 1503 PDN (8/8), 1504 PDN (17/8), 1505 PDN (29/8). Nos. 7025-27 are painted dark green and lined, while Nos. 1503-05 are unlined black. Contractor built: Nos. 8400 TYS, 8401 CDF, 8402 (W.G.B. 2912/49) PILL (26/8), 8450 (Y.E. Co. 2443/49) NPT (17/8). Nos. 8400-02/50 are unlined black. Condemned: Nos. 289 (original T.V. R/T boiler and curved top tanks), 1884 (closed cab), 1930 (open cab), 2902, 3182 an 3419. No. 6320 has been re-converted to coal-burning. Locomotives entering Works during August included: Nos. 1000/04/25, 1427/37, 2117 (closed cab), 2211/12/14/21/67, 2462, 2815/52/75/87, 3016/20, 3174/86, 3635/77, 3715/99, 3805/14/43, 4013/15/33/47/80, 4107/48/49/55, 4269/78, 4502/10/59/65/82/92/95, 4637/50/79/97, 4906/51/81, 5001/18/30/42/57/76/80/94/99, 5206, 5344/45/80, 5501/05/22/37/54, 5749, 5804, 5904/12/21/27/44/45/47/66, 6000/04/19, 6105/07/43/61, 6338/77, 6408/31, 6741, 6808/19/28/29/44, 6905/65, 7219/36, 7310, 7414, 7718, 7815/16, 7904, 8789, 9638 an 90712. Further locomotives painted black and fully lined include Nos. 1005/12, 4901/23/50, 5912/18 an 6920. September: A batch of new Class '2' 2-6-2T's and Class '4' 2-6-0's is to be built here. They will be similar to existing L.M.S. designs, but will have modified G.W.R. boilers. The frames have already been cut for five of the 2-6-0's. |
SLS/194910 |