Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 16 Online
» 624 Today
» 4163 Yesterday
» 14030 Week
» 67046 Month
» 186573 Year
» 3213426 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Pre TOPS (Pre Tops) D3638 24/11/1958  

Locomotive Specifics
Class as Built 10
Subclass/Rebuild History
ClassFrom
1024/11/1958
Wheels 0-6-0
Builder Darlington Works
To Service 24/11/1958 to Frodingham (36C)
Withdrawn 07/11/1970
Time in Service 11 yrs, 11 mths , 14 dys
Cut Up 10/1975
Cut At National Coal Board (Ashington)
Status Scrapped

Allocations - WIP
Code Subsequent Codes Name From Date
36C   Frodingham (New) on 24/11/1958
36A   Doncaster w/e 12/08/1967
52A   Gateshead (Reinstated) w/e 21/03/1970
     Withdrawn on 07/11/1970

Configuration - WIP
Date Configuration Description Additional Diagram Source
24/11/1958 v Vacuum brakes      

Components
Fitted Component Details Removed Reason Removed
24/11/1958 Power Unit ER85017    


Summary
Start Event Details Source See Also
24/11/1958 To Service To service as British Railways number D3638
Built at Darlington Works
Allocated to Frodingham (36C)
   
12/08/1967 Allocation Reallocated to Doncaster (36A)    
21/03/1970 Reinstated Reinstated to Gateshead (52A)    
07/11/1970 Withdrawn Condemned as 3638    
10/1975 Scrapped Broken up by National Coal Board: Ashington    

prev prev