Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 21 Online
» 1127 Today
» 4163 Yesterday
» 14533 Week
» 67549 Month
» 187076 Year
» 3213929 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Western Railway 569 m/e 02/1887
London and North Western Railway (Duplicate) 3769 m/e 01/1922
London, Midland & Scottish Railway 7772 y/e 1924

Locomotive Specifics
Designer F. Webb
Class Coal Tank
Company History LNWR/LMS
Wheels 0-6-2T
Builder Crewe Works
Order Number No Order ID issued
Works Number 2947
Fittings (as built)
Boiler Diagram Precursor
Safety Valves Ramsbottom
To Service During 02/1887
Withdrawal During 04/1947
Service Life 60 yrs , 2 mths

Disposal

Allocations
Code Subsequent Codes Name From Date
    (New) m/e 02/1887
     Withdrawn m/e 04/1947

SLS Allocations*
Type Code Name From Date
WDN   w/e 26/04/1947

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
09/1927 Push/Pull equipment fitted


Mentions ...
Report Date Title Report Source
02/11/1943 Crewe Works Engines in shops on 2/11: 2587, 3891, 4220, 4464/99, 5026/76/94, 5109/31/89, 5201/33/96, 5357, 5423/33/56, 5526/41/2/54/63/91/6, 5605/19/56/62, 6117/34/9/42/8/63, 6200/2/9/31/5/40, 6931, 7340, 7408/68, 7674, 7772, 7898,.7978/9, 8598, 8962, 9057/83, 9103/23, 9305/40/1/66, 9529, 9605/6/20/32, 28245, 28423, 28616. W.D. 7057 (V.F.4873/43), W.D. 7161 (N.B.L. 25032/43). U.S.A. 1681 (Baldwin 67665, 1/43); U.S.A. 2400 (A.L.Co. 70749, 4/43), U.S.A. 2428 (A.L.Co. 70777, 5/43). The next 'Scot' to be 'rebuilt' is No, 6124. No. 6117 should be out 1/12/43. New 8.F. No. 8310 left the erecting shop 30/11/43. The W.D. (Austerity) 2-8-0's are having their cast-iron tender wheels re-placed by steel castings at Crewe. W.D. Nos. 551, 559, 571 are being returned to L.M.S. service, and the following running numbers have been allocated:-551/8266, NBL 24746/42, Tender No. 9993/43; 559/8272, NBL 24770J42; 571/8284 NBL 24806/42. Allocation of some '8.F's'-12A, Nos. 8302/3/32, 8644/51; 16C, Nos. 8616/41; 18B, Nos. 8304/33, 8620/1/50; 18D, No. 8642; 20A, Nos. 8305, 8618/39/40; 20B, No. 8619; 28C, Nos. 8617/43/52-4. SLS/194401
26/04/1947 Crewe Works A further four new Class 5 4-6-0's have been completed here - Nos. 4769-4772, and 4-6-2 No. 6242 has had the streamline casing removed. The following were in the Works yard on 26/4 awaiting cutting-up:- 6652, 6690, 6755, 6870, 6925, 6936, 7765, 7772, 7795, 25304, 25802, 27555, 27654, 27493, 28117 and 27558, the latter having been partially cut-up. It is understood that the order for new Class 5 4-6-0's to be built at Crewe comprises Nos. 4738-4782 whilst Horwich will build Nos. 4783-4799. SLS/194706
04/07/1948 Crewe Works Four more Class '5' 4-6-0's of Order E469 Nos. 44743 , 44744 , 44745 and 44746 were completed on 3/6, 10/6, 21/6 and 29/6 respectively, while the remaining engine of that order (No. 44747) is already in an advanced state of completion.
Two more 'Patriot' Class 4-6-0's have been rebuilt with taper boilers: No. 5532 completed on 16/6 and No. 5512 on 30/6. Nos. 5525/27 will be the next to be rebuilt, in that order.
The frames for the first three '2P' 2-6-2T's of Order E470 were noted in the Erecting Shop on 1/7; the boiler, cab and tanks had already been fitted to No. 41210. The following withdrawn locomotives were noted in the carriage sheds:-Eastern shed Nos. 6679, 6747, 7700/96, 7812/41, 8910, 28097, 28230, 28350, 28367, 28415/41, 28542/86/97; Western shed Nos. 6653/89/91/92, 6870/78, 7840, 9273, 28234. Further ex L.N.W.R. locomotives have gone to the scrap heap during the past month. They were cut-up as follows:-W/E 6/6 Nos. 7772, 7892, 7938, 9383; W/E 12/6 Nos. 6883, 6927, 25350; W/E 19/6 Nos. 6605/46, 6739; W/E 26/6 Nos. 6894, 9233, 28594; W/E 3/7 Nos. 7740, 25787.
During the W/E 26/6, W.D. 2-10-0 No. 73799 North British (12A) was on Works undergoing a minor repair. It is understood that this engine is to be used for testing the new Locomotive Testing Plant at Rugby. Class '5' No. 44826 was re-converted to coal burning during W/E 26/6.
Both Cornwall and Hardwicke have been hauled out of the Paint Shop and overhauled recently; the latter is now also lined out in accordance with ex L.N.W.R. practice.
New construction here was as follows: North Shed No. 44744; Paint Shop Nos. 44745/46, 45532 (Rebuilt); Yard Nos. 45512 (Rebuilt), 41214/15 an 44757 (frames and cylinders); Erecting Shop Nos. 44747 (complete), 41210 (frame, cylinders, boiler and tanks), 41211 (frame, cylinders, tank and boiler (not mounted)), 41212 (frame, cylinders and boiler (not mounted)), 41213 (frame and cylinders), 5525 (being rebuilt), 5527 (for rebuilding); Heavy Machine Shop Nos. 41216-18 (frames and cylinders), 41219 (frame only).
SLS/194808

Summary
Date Event Details Source See Also
02/1887 To Service To service as London and North Western Railway Number 569
Built at Crewe Works, Works Number 2947
   
01/1922 Renumbered Renumbered to 3769    
1924 Renumbered Renumbered to 7772    
09/1927 Modification Modification: Push/Pull equipment fitted    
04/1947 Withdrawn Condemned as 7772    

prev prev