Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 24 Online
» 1699 Today
» 4397 Yesterday
» 19502 Week
» 72518 Month
» 192045 Year
» 3218898 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 756 m/e 01/1909

Locomotive Specifics
Designer W. Worsdell
Class B13
Company History NER/LNER
Rebuild History
ClassFrom
B1301/1909
Wheels 4-6-0
Builder Gateshead Works
Works Number 110
Fittings (as built)
Engine Brakes Westinghouse
To Service During 01/1909 to Blaydon (BLA)
Withdrawal Fri 21/09/1934 off Hull Dairycoates (HLD)
Service Life 25 yrs, 8 mths , 21 dys

Disposal

Notes
Notes Cut up at Darlington

Allocations
Code Subsequent Codes Name From Date
BLA   Blaydon (New) m/e 01/1909
TWD   Tweedmouth on 07/09/1924
HLD   Hull Dairycoates on 18/02/1927
     Withdrawn on 21/09/1934

Modifications
Date Modified Modification
01/1909 Diagram 54Sat boiler fitted (number G739)
03/1913 Diagram 54Sat boiler fitted (number G707)
10/1915 Diagram 54Sat boiler fitted (number G732)
07/11/1919 Diagram 54Sup boiler fitted (number G720)
01/1923 Vacuum Ejector fitted
23/06/1927 Diagram 54Sup boiler fitted (number D1869)
25/08/1932 Diagram 54Sup boiler fitted (number D1517)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Unknown Works 1913 03/1913   General Boiler number G707 (Diagram 54Sat)
 
Unknown Works 1915 10/1915   General Boiler number G732 (Diagram 54Sat)
 
Unknown Works 1919 11/1919   General Superheated boiler fitted
 
Gateshead Works 13/06/1924 03/09/1924 83 days General    
Darlington Works 02/04/1927 23/06/1927 83 days General Boiler number D1869 (Diagram 54Sup)
 
Darlington Works 16/01/1930 07/03/1930 51 days General    
Darlington Works 01/07/1932 25/08/1932 56 days General Used for counter pressure tests
Boiler number D1517 (Diagram 54Sup)
 

Summary
Date Event Details Source See Also
01/1909 To Service To service as North Eastern Railway Number 756
Built at Gateshead Works, Works Number 110
Allocated to Blaydon (BLA)
Diagram 54Sat boiler fitted
   
1913 Works Visit Works Visit - Unknown Works (General) - Arr: ?/1913. Dep: ?/03/1913.
Work undertaken:
Boiler number G707 (Diagram 54Sat)
   
1915 Works Visit Works Visit - Unknown Works (General) - Arr: ?/1915. Dep: ?/10/1915.
Work undertaken:
Boiler number G732 (Diagram 54Sat)
   
1919 Works Visit Works Visit - Unknown Works (General) - Arr: ?/1919. Dep: ?/11/1919.
Work undertaken:
Superheated boiler fitted
   
07/11/1919 Modification Diagram 54Sup number G720 boiler fitted    
01/1923 Modification Modification: Vacuum Ejector fitted    
13/06/1924 Works Visit Works Visit - Gateshead Works (General) - Arr: 13/06/1924. Dep: 03/09/1924.    
07/09/1924 Allocation Reallocated to Tweedmouth (TWD)    
18/02/1927 Allocation Reallocated to Hull Dairycoates (HLD)    
02/04/1927 Works Visit Works Visit - Darlington Works (General) - Arr: 02/04/1927. Dep: 23/06/1927.
Work undertaken:
Boiler number D1869 (Diagram 54Sup)
   
16/01/1930 Works Visit Works Visit - Darlington Works (General) - Arr: 16/01/1930. Dep: 07/03/1930.    
01/07/1932 Works Visit Works Visit - Darlington Works (General) - Arr: 01/07/1932. Dep: 25/08/1932.
Work undertaken:
Used for counter pressure tests
Boiler number D1517 (Diagram 54Sup)
   
21/09/1934 Withdrawn Condemned as 756 from Hull Dairycoates (HLD)    

prev prev