* Stephenson Locomotive Society data - raw and not yet cross-referenced
|
Works | Stopped | Entry | Departure | Duration | Level of Work | Actual | Mileage |
---|---|---|---|---|---|---|---|
Gateshead Works | 02/11/1923 | 12/01/1924 | 72 days | General | |||
Darlington Works | 30/11/1926 | 12/04/1927 | 134 days | General | |||
Darlington Works | 30/12/1929 | 20/02/1930 | 53 days | General | Boiler number D1117 (Diagram 49) |
||
Darlington Works | 24/08/1933 | 05/10/1933 | 43 days | General | Boiler number D1449 (Diagram 49) |
||
Darlington Works | 09/12/1936 | 01/03/1937 | 83 days | General | Boiler number 24082 (Diagram 49) |
||
Darlington Works | 18/08/1938 | 29/09/1938 | 43 days | General | |||
Darlington Works | 08/01/1941 | 12/02/1941 | 36 days | General | Boiler number 2264 (Diagram 49) |
||
Darlington Works | 07/09/1943 | 23/10/1943 | 47 days | General | |||
Darlington Works | 16/08/1945 | 13/10/1945 | 59 days | General | Rebuilt to class B16/3 Boiler number 3587 (Diagram 49A) |
||
Darlington Works | 20/10/1945 | 22/10/1945 | 3 days | Unclassified | |||
Gateshead Works | 12/09/1946 | 30/09/1946 | 19 days | Light Repair | Renumbered to LNER (1946) number 1420 |
||
Darlington Works | 03/03/1948 | 23/04/1948 | 52 days | General | Boiler number 3579 (Diagram 49A) Renumbered to BR 61420 |
||
Darlington Works | 03/07/1948 | 16/07/1948 | 14 days | Light Repair | |||
Gateshead Works | 05/01/1950 | 16/01/1950 | 12 days | Light Casual | |||
Darlington Works | 18/09/1950 | 14/10/1950 | 27 days | General | Boiler number 24003 (Diagram 49A) |
||
Darlington Works | 16/10/1950 | 17/10/1950 | 2 days | Unclassified | |||
Darlington Works | 03/11/1952 | 05/11/1952 | 3 days | Unclassified | |||
Darlington Works | 25/05/1953 | 20/06/1953 | 27 days | General | Boiler number 24005 (Diagram 49A) |
||
Darlington Works | 23/06/1953 | 23/06/1953 | 1 day | Unclassified | |||
Darlington Works | 26/05/1955 | 25/06/1955 | 31 days | General | Boiler number 24071 (Diagram 49A) |
||
Darlington Works | 06/12/1955 | 23/12/1955 | 18 days | Light Casual | |||
Darlington Works | 21/11/1957 | 14/12/1957 | 24 days | General | Boiler number 24041 (Diagram 49A) |
||
Darlington Works | 16/12/1957 | 18/12/1957 | 3 days | Unclassified | |||
Darlington Works | 15/08/1960 | 21/09/1960 | 38 days | General | Boiler number 24012 (Diagram 49A) |
||
Darlington Works | 30/08/1962 | 31/08/1962 | 2 days | Special | Tender change |
Report Date | Title | Report | Source |
---|---|---|---|
30/04/1948 | Darlington Works | 'L.1's' Nos. 9000-9015 are to be renumbered 67701-67716. No. 67717 (9016) is the first to come out under this number, while No. 9015 was altered to 67716. The paint dates of Nos. 9009-9012 are March, and Nos. 9013-9015 and 67717-67718 are April. The Works' Nos. are 2028-2036/48 respectively. The next order for North Road will be a batch of 'A.1' 'Pacifics.' The rumour of further 'B.1's' came about owing to Stooperdale building a batch of spare boilers for this class. Locomotives for shops or scrap during the period April 4th-May 2nd included:-Nos. 1440, E1461, 2391, 2747, 3037, 3170, 3286, 3315, 5069, 5625, 5768/88, 7306, 7649/88, 9837/52, 9917/33, 77414, 79198. The following locomotives have arrived for cutting-up:-ex G.E. Nos. 5380/83, 5400, 7120/37, 8212, ex MET Nos. 7511/12 and ex M.G.N. No. 8485. Locomotives ex shops during the same period included Nos. 5778, 9856, 60510, 60825, 61011/60/71, 61420, 62388, 63125/40, 65624/50, 65825/47/51, 67263, 67301, 67632/84, 67718, 68248/90, 68724, 69786, 69875, 69910. The following locomotives have been painted or repainted green: Nos. 61011/60/71 an 67684. No. 60510 came off Works without nameplates, but returned and has at last had these fitted-Robert the Bruce. | SLS/194806 |
31/07/1948 | Darlington Works | 'L.1's' are completed up to No. 67727 and the last three are almost finished. The paint dates of Nos. 67719-21 are May, Nos. 67722-26 June and No. 67727 July. The Works' Nos. are 2037-2045, in order. Frames are laid down for the first two 'Pacifics' and it is understood that at least twelve are expected to be completed by the end of the year. No. 7306 the first 'G.5' to be withdrawn is in the scrap yard, together with No. 5115. A start was made on cutting-up 'C.7's' Nos. 2973 an 2982 during W/E 3/7/48 and these will be followed by No. 2954. Further engines of this class have arrived in the Works' road at the shed, and it is expected they will all be scrapped, they are as follows:-Nos. 2975, 2981, 2983, 2988 an 2995. 'J.93' No. 8488 arrived on a truck and was cut-up W/E 29/5/48. Easingwold Rly. No. 2 is still in the Works' yard in a very forlorn condition. The North Sunderland Rly. diesel Lady Armstrong has also been there for a considerable time; No. 8089 is at present working on the N.S. Rly. The frames of two ex G.N.R. 'Atlantic's' (still complete with cylinders) have been shortened and are being used back to back as a boiler wagon. 'B.1' No. 61014 is ex works painted black and fully lined, but minus name plates-the name being chalked on one side of the smokebox. Other locomotives noted painted black and fully lined include Nos. 60834, 60942, 61019 an 62751. Locomotives ex works to July 3rd, include:-Nos. 60919, 61410, 62724, 63282/90, 63345, 65024/64, 65575, 65673, 65708/54/62/75, 65816/41, 67613/29, 68245, 68307/58/91, 68706/61, 69771/98, 69833/37, 69854/66 an 69917. Locomotives for works during the same period include:-Nos. 509, 824/98, 920, 1012/19, 2375/79, 2706/61/68, 3250/64, 5099, 5670/92, 5774, 7246/95, 7305/06, 7603/05/10/16/30/35/61/78/90, 8262/91, 8358/60/93, 8434, 9781/82, 9832/52/57/82/85/93 an 61420. |
SLS/194808 |
Date | Event | Details | Source | See Also |
---|---|---|---|---|
12/1920 | To Service | To service as North Eastern Railway Number 924 Built at Darlington Works, Works Number Allocated to Tweedmouth (TWD) Diagram 49 boiler fitted |
||
02/11/1923 | Works Visit | Works Visit - Gateshead Works (General) - Arr: 02/11/1923. Dep: 12/01/1924. | ||
08/05/1924 | Allocation | Reallocated to York (North) (YK) | ||
07/07/1925 | Allocation | Reallocated to Neville Hill (NEV) | ||
30/11/1926 | Works Visit | Works Visit - Darlington Works (General) - Arr: 30/11/1926. Dep: 12/04/1927. | ||
30/12/1929 | Works Visit | Works Visit - Darlington Works (General) - Arr: 30/12/1929. Dep: 20/02/1930. Work undertaken: Boiler number D1117 (Diagram 49) |
||
24/08/1933 | Works Visit | Works Visit - Darlington Works (General) - Arr: 24/08/1933. Dep: 05/10/1933. Work undertaken: Boiler number D1449 (Diagram 49) |
||
09/12/1936 | Works Visit | Works Visit - Darlington Works (General) - Arr: 09/12/1936. Dep: 01/03/1937. Work undertaken: Boiler number 24082 (Diagram 49) |
||
18/08/1938 | Works Visit | Works Visit - Darlington Works (General) - Arr: 18/08/1938. Dep: 29/09/1938. | ||
08/01/1941 | Works Visit | Works Visit - Darlington Works (General) - Arr: 08/01/1941. Dep: 12/02/1941. Work undertaken: Boiler number 2264 (Diagram 49) |
||
28/03/1943 | Allocation | Reallocated to York (North) (YK) | ||
07/09/1943 | Works Visit | Works Visit - Darlington Works (General) - Arr: 07/09/1943. Dep: 23/10/1943. | ||
16/08/1945 | Works Visit | Works Visit - Darlington Works (General) - Arr: 16/08/1945. Dep: 13/10/1945. Work undertaken: Rebuilt to class B16/3 Boiler number 3587 (Diagram 49A) |
||
20/10/1945 | Works Visit | Works Visit - Darlington Works (Unclassified) - Arr: 20/10/1945. Dep: 22/10/1945. | ||
12/09/1946 | Works Visit | Works Visit - Gateshead Works (Light Repair) - Arr: 12/09/1946. Dep: 30/09/1946. Work undertaken: Renumbered to LNER (1946) number 1420 |
||
03/03/1948 | Works Visit | Works Visit - Darlington Works (General) - Arr: 03/03/1948. Dep: 23/04/1948. Work undertaken: Boiler number 3579 (Diagram 49A) Renumbered to BR 61420 |
||
03/07/1948 | Works Visit | Works Visit - Darlington Works (Light Repair) - Arr: 03/07/1948. Dep: 16/07/1948. | ||
05/01/1950 | Works Visit | Works Visit - Gateshead Works (Light Casual) - Arr: 05/01/1950. Dep: 16/01/1950. | ||
18/09/1950 | Works Visit | Works Visit - Darlington Works (General) - Arr: 18/09/1950. Dep: 14/10/1950. Work undertaken: Boiler number 24003 (Diagram 49A) |
||
16/10/1950 | Works Visit | Works Visit - Darlington Works (Unclassified) - Arr: 16/10/1950. Dep: 17/10/1950. | ||
03/11/1952 | Works Visit | Works Visit - Darlington Works (Unclassified) - Arr: 03/11/1952. Dep: 05/11/1952. | ||
25/05/1953 | Works Visit | Works Visit - Darlington Works (General) - Arr: 25/05/1953. Dep: 20/06/1953. Work undertaken: Boiler number 24005 (Diagram 49A) |
||
23/06/1953 | Works Visit | Works Visit - Darlington Works (Unclassified) - Arr: 23/06/1953. Dep: 23/06/1953. | ||
26/05/1955 | Works Visit | Works Visit - Darlington Works (General) - Arr: 26/05/1955. Dep: 25/06/1955. Work undertaken: Boiler number 24071 (Diagram 49A) |
||
06/12/1955 | Works Visit | Works Visit - Darlington Works (Light Casual) - Arr: 06/12/1955. Dep: 23/12/1955. | ||
21/11/1957 | Works Visit | Works Visit - Darlington Works (General) - Arr: 21/11/1957. Dep: 14/12/1957. Work undertaken: Boiler number 24041 (Diagram 49A) |
||
16/12/1957 | Works Visit | Works Visit - Darlington Works (Unclassified) - Arr: 16/12/1957. Dep: 18/12/1957. | ||
15/08/1960 | Works Visit | Works Visit - Darlington Works (General) - Arr: 15/08/1960. Dep: 21/09/1960. Work undertaken: Boiler number 24012 (Diagram 49A) |
||
30/08/1962 | Works Visit | Works Visit - Darlington Works (Special) - Arr: 30/08/1962. Dep: 31/08/1962. Work undertaken: Tender change |
||
02/12/1962 | Allocation | Reallocated to Hull Dairycoates (50B) | ||
23/09/1963 | Withdrawn | Condemned as 61420 from Hull Dairycoates (50B) | ||
02/02/1964 | Scrapped | Broken up by Drapers: Hull |