Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 22 Online
» 2705 Today
» 4163 Yesterday
» 16111 Week
» 69127 Month
» 188654 Year
» 3215507 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 942 m/e 06/1921
London and North Eastern Railway (1946) 1432   03/11/1946
British Railways 61432   10/12/1948

Locomotive Specifics
Designer V. Raven
Class B16
Company History NER/LNER
Wheels 4-6-0
Builder Darlington Works
Fittings (as built)
Engine Brakes Westinghouse brake with Vacuum Ejector
To Service During 06/1921 to York (North) (YK)
Withdrawal Mon 03/07/1961 off Neville Hill (55H)
Service Life 40 yrs, 1 mth , 2 dys

Disposal
Scrapping During 10/1961 at Locomotive Works (Darlington)

Notes
Notes Into Darlington for cutting up 3/7/61

Allocations
Code Subsequent Codes Name From Date
YK   York (North) (New) m/e 06/1921
SCA   Scarborough on 06/07/1925
YK   York (North) on 28/09/1925
HLD   Hull Dairycoates on 15/06/1928
YK   York (North) on 30/05/1940
SKN   Stockton on 06/05/1946
YK   York (North) on 31/08/1947
NEV   Neville Hill on 07/08/1949
NEV   Neville Hill w/e 13/08/1949
     Withdrawn on 03/07/1961

SLS Allocations*
Type Code Name From Date
ALLOC YK York (North) on 31/08/1947
ALLOC NEV Neville Hill w/e 13/08/1949
WDN   on 03/07/1961

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
06/1921 Diagram 49 boiler fitted (number D1229)
19/01/1931 Diagram 49 boiler fitted (number D1592)
01/06/1933 Diagram 49 boiler fitted (number 2267)
19/11/1935 Diagram 49 boiler fitted (number D1499)
03/08/1940 Diagram 49 boiler fitted (number D1243)
10/05/1944 Diagram 49 boiler fitted (number 2702)
08/12/1945 Diagram 49 boiler fitted (number 2728)
10/12/1948 Diagram 49 boiler fitted (number 2881)
12/01/1952 Diagram 49 boiler fitted (number 24043)
05/06/1954 Diagram 49 boiler fitted (number 24016)
02/11/1957 Diagram 49A boiler fitted (number 24102)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Darlington Works 10/05/1924 18/07/1924 70 days General    
Darlington Works 26/08/1924 07/10/1924 43 days Light Repair    
Darlington Works 07/05/1927 10/11/1927 188 days General    
Darlington Works 14/11/1930 19/01/1931 67 days General Boiler number D1592 (Diagram 49)
 
Darlington Works 24/04/1933 01/06/1933 39 days General Boiler number 2267 (Diagram 49)
 
Darlington Works 10/10/1935 19/11/1935 41 days General Boiler number D1499 (Diagram 49)
 
Darlington Works 27/04/1938 25/06/1938 60 days General    
Darlington Works 05/07/1940 03/08/1940 30 days General Boiler number D1243 (Diagram 49)
 
Darlington Works 16/12/1941 07/02/1942 54 days Light Repair After collision
 
Darlington Works 08/07/1943 16/08/1943 40 days Light Repair    
Darlington Works 03/04/1944 10/05/1944 38 days General Boiler number 24061 (Diagram 49)
 
Darlington Works 07/06/1945 30/06/1945 24 days Light Repair    
Darlington Works 07/11/1945 08/12/1945 32 days General Boiler number 2728 (Diagram 49)
 
Gateshead Works 24/03/1947 11/04/1947 19 days Light Repair    
Darlington Works 10/11/1948 10/12/1948 31 days General Boiler number 2881 (Diagram 49)
Renumbered to BR 61432
 
Darlington Works 20/12/1948 31/12/1948 12 days Unclassified    
Gateshead Works 18/08/1949 09/09/1949 23 days Light Casual    
Darlington Works 11/12/1951 12/01/1952 33 days General Boiler number 24043 (Diagram 49)
 
Darlington Works 01/05/1954 05/06/1954 36 days General Boiler number 24016 (Diagram 49)
 
Darlington Works 07/06/1954 11/06/1954 5 days Unclassified    
Darlington Works 01/10/1957 02/11/1957 33 days General Boiler number 24102 (Diagram 49A)
 
Darlington Works 04/11/1957 05/11/1957 2 days Unclassified    

Mentions ...
Report Date Title Report Source
31/12/1948 Darlington Works Locomotives awaiting Works during December included:-Nos. 952, 1437, 1625/41, 2378, 2970 (the last 'C.7'), 3368, 5639, 5650 (badly damaged at Jervaulx), 5693, 5759/97, 5807, 7278, 7651, 8010/37, 8155, 8292, 9792, 9892, 60510, 62732/33, 65056, 67704/05/10/19/23, 69910/33, 'Austerity' 70877, 77414/69. Locomotives ex Works during December included:-Nos. 60918/42/70, 61432, 61601/29/30/51, 62344/65, 62728/31/54, 63352, 63423, 65033, 65856, 67283, 67342, 67636/39/87, 67701, 68016 (altered bunker), 68264/75, 68436, 68696, 68745, 69102, 69794, 69842/79/89, 'Austerity' 77329. Locomotives broken up: Nos. 2390 an 3327. The two Class 'V.2's' which have hitherto been used as main line pilots, have now been replaced by Class 'A.3' Nos. 70 an 76. SLS/194902
09/07/1961 Darlington Works (Scrap Yard, i Complete Locos) Erecting Shop: D242, D2243/6/8, D2700, D3456, D4073-6, D5160-4, 60803/80/99, 61322, 61457, 63354, 63401/65, 65825, 77012, 78022, 80075, 90061, 90405/26, 92197. Stripping Shop: 61437. Stripping Shop Yard: 60882, 60935/71, 63367, 63417/66, 65760, 77011. Works Yard: D239/78/80, D5158, 43051, 43126/33/4/41, 46480, 60802/55, 60903/63, 63441, 65099, 65761/90, 65820/84, 67643/58, 67760, 68040/7/50, 90089, 92175. Crossing: D13, D4072, D5159. Stooperdale: 90074. Scrap Yard, (i) Complete Locos: 61432/45, 67665, 67707/19/32/8/40, DEPT54. Scrap Yard, (ii) Parts of Locos: 61455, 68080, 68316, 69105, 69921. SLS/196108

Summary
Date Event Details Source See Also
06/1921 To Service To service as North Eastern Railway Number 942
Built at Darlington Works, Works Number
Allocated to York (North) (YK)
Diagram 49 boiler fitted
   
10/05/1924 Works Visit Works Visit - Darlington Works (General) - Arr: 10/05/1924. Dep: 18/07/1924.    
26/08/1924 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 26/08/1924. Dep: 07/10/1924.    
06/07/1925 Allocation Reallocated to Scarborough (SCA)    
28/09/1925 Allocation Reallocated to York (North) (YK)    
07/05/1927 Works Visit Works Visit - Darlington Works (General) - Arr: 07/05/1927. Dep: 10/11/1927.    
15/06/1928 Allocation Reallocated to Hull Dairycoates (HLD)    
14/11/1930 Works Visit Works Visit - Darlington Works (General) - Arr: 14/11/1930. Dep: 19/01/1931.
Work undertaken:
Boiler number D1592 (Diagram 49)
   
24/04/1933 Works Visit Works Visit - Darlington Works (General) - Arr: 24/04/1933. Dep: 01/06/1933.
Work undertaken:
Boiler number 2267 (Diagram 49)
   
10/10/1935 Works Visit Works Visit - Darlington Works (General) - Arr: 10/10/1935. Dep: 19/11/1935.
Work undertaken:
Boiler number D1499 (Diagram 49)
   
27/04/1938 Works Visit Works Visit - Darlington Works (General) - Arr: 27/04/1938. Dep: 25/06/1938.    
30/05/1940 Allocation Reallocated to York (North) (YK)    
05/07/1940 Works Visit Works Visit - Darlington Works (General) - Arr: 05/07/1940. Dep: 03/08/1940.
Work undertaken:
Boiler number D1243 (Diagram 49)
   
16/12/1941 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 16/12/1941. Dep: 07/02/1942.
Work undertaken:
After collision
   
08/07/1943 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 08/07/1943. Dep: 16/08/1943.    
03/04/1944 Works Visit Works Visit - Darlington Works (General) - Arr: 03/04/1944. Dep: 10/05/1944.
Work undertaken:
Boiler number 24061 (Diagram 49)
   
07/06/1945 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 07/06/1945. Dep: 30/06/1945.    
07/11/1945 Works Visit Works Visit - Darlington Works (General) - Arr: 07/11/1945. Dep: 08/12/1945.
Work undertaken:
Boiler number 2728 (Diagram 49)
   
06/05/1946 Allocation Reallocated to Stockton (SKN)    
03/11/1946 Renumbered Renumbered to 1432    
24/03/1947 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 24/03/1947. Dep: 11/04/1947.    
31/08/1947 Allocation Reallocated to York (North) (YK)    
10/11/1948 Works Visit Works Visit - Darlington Works (General) - Arr: 10/11/1948. Dep: 10/12/1948.
Work undertaken:
Boiler number 2881 (Diagram 49)
Renumbered to BR 61432
   
20/12/1948 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 20/12/1948. Dep: 31/12/1948.    
07/08/1949 Allocation Reallocated to Neville Hill (NEV)    
13/08/1949 Allocation Reallocated to Neville Hill (NEV)    
18/08/1949 Works Visit Works Visit - Gateshead Works (Light Casual) - Arr: 18/08/1949. Dep: 09/09/1949.    
11/12/1951 Works Visit Works Visit - Darlington Works (General) - Arr: 11/12/1951. Dep: 12/01/1952.
Work undertaken:
Boiler number 24043 (Diagram 49)
   
01/05/1954 Works Visit Works Visit - Darlington Works (General) - Arr: 01/05/1954. Dep: 05/06/1954.
Work undertaken:
Boiler number 24016 (Diagram 49)
   
07/06/1954 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 07/06/1954. Dep: 11/06/1954.    
01/10/1957 Works Visit Works Visit - Darlington Works (General) - Arr: 01/10/1957. Dep: 02/11/1957.
Work undertaken:
Boiler number 24102 (Diagram 49A)
   
04/11/1957 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 04/11/1957. Dep: 05/11/1957.    
03/07/1961 Withdrawn Condemned as 61432 from Neville Hill (55H)    
10/1961 Scrapped Broken up by Locomotive Works: Darlington    

prev prev