Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 18 Online
» 785 Today
» 4397 Yesterday
» 18588 Week
» 71604 Month
» 191131 Year
» 3217984 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
Great Northern Railway 1434   11/1907
London and North Eastern Railway (1924) 4434   09/05/1925
London and North Eastern Railway (1946) 2864   Not applied

Locomotive Specifics
Designer H. Ivatt
Class C1
Company History GNR/LNER
Wheels 4-4-2
Builder Doncaster Works
Order Number 253
Works Number 1173
To Service During 11/1907
Withdrawal Thu 26/04/1945
Service Life 37 yrs, 5 mths , 26 dys

Disposal
Scrapping Locomotive Works (Doncaster)

Allocations
Code Subsequent Codes Name From Date
    (New) m/e 11/1907
SHF   Sheffield Neepsend m/e 06/1923
HIT   Hitchin (GNR) on 08/03/1937
KX   Kings Cross on 02/01/1938
HIT   Hitchin (GNR) on 07/08/1938
     Withdrawn on 26/04/1945


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Doncaster Works 1912 11/1912   General Superheated boiler fitted
 
Doncaster Works 1919 10/1919   General    
Doncaster Works 11/12/1922 28/03/1923 108 days General    
Doncaster Works 12/05/1924 17/05/1924 6 days Light Repair    
Doncaster Works 07/01/1925 09/05/1925 123 days General Renumbered to LNER (1924) number 4434
 
Doncaster Works 17/12/1926 26/03/1927 100 days General    
Doncaster Works 16/02/1929 13/04/1929 57 days General    
Doncaster Works 31/12/1930 14/02/1931 46 days General    
Doncaster Works 14/01/1933 25/02/1933 43 days General    
Doncaster Works 30/09/1933 11/11/1933 43 days General    
Doncaster Works 08/06/1935 20/07/1935 43 days General    
Doncaster Works 14/11/1936 12/12/1936 29 days General    
Doncaster Works 27/11/1937 31/12/1937 35 days Light Repair    
Doncaster Works 02/12/1939 13/01/1940 43 days General    
Doncaster Works 03/05/1941 28/06/1941 57 days General    
Doncaster Works 14/04/1944 12/05/1944 29 days General    
Doncaster Works 14/04/1945 14/04/1945 1 day No repairs    

Mentions ...
Report Date Title Report Source
13/09/1947 Gorton Works 13/9: No. 4362 is now rebuilt to Class 'J11/4' and carries a standard 'J11' boiler No. 47/4046 with an extension welded on to the lower part of the firebox due to the boiler centre line being raised. A new set of Class 'A5' frames was seen in the Erecting Shop; un-marked so it was impossible to ascertain for which engine it is intended. Two boilers off Class 'Cl' 4434 and 4443 (Nos. 8663 and 8035, now pressed at 100lb.) were in the boiler yard, presumably for use as stationary boilers in due course. SLS/194710

Summary
Date Event Details Source See Also
11/1907 To Service To service as Great Northern Railway Number 1434
Built at Doncaster Works, Works Number 1173
   
1912 Works Visit Works Visit - Doncaster Works (General) - Arr: ?/1912. Dep: ?/11/1912.
Work undertaken:
Superheated boiler fitted
   
1919 Works Visit Works Visit - Doncaster Works (General) - Arr: ?/1919. Dep: ?/10/1919.    
11/12/1922 Works Visit Works Visit - Doncaster Works (General) - Arr: 11/12/1922. Dep: 28/03/1923.    
06/1923 Allocation Reallocated to Sheffield Neepsend (SHF)    
12/05/1924 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 12/05/1924. Dep: 17/05/1924.    
07/01/1925 Works Visit Works Visit - Doncaster Works (General) - Arr: 07/01/1925. Dep: 09/05/1925.
Work undertaken:
Renumbered to LNER (1924) number 4434
   
17/12/1926 Works Visit Works Visit - Doncaster Works (General) - Arr: 17/12/1926. Dep: 26/03/1927.    
16/02/1929 Works Visit Works Visit - Doncaster Works (General) - Arr: 16/02/1929. Dep: 13/04/1929.    
31/12/1930 Works Visit Works Visit - Doncaster Works (General) - Arr: 31/12/1930. Dep: 14/02/1931.    
14/01/1933 Works Visit Works Visit - Doncaster Works (General) - Arr: 14/01/1933. Dep: 25/02/1933.    
30/09/1933 Works Visit Works Visit - Doncaster Works (General) - Arr: 30/09/1933. Dep: 11/11/1933.    
08/06/1935 Works Visit Works Visit - Doncaster Works (General) - Arr: 08/06/1935. Dep: 20/07/1935.    
14/11/1936 Works Visit Works Visit - Doncaster Works (General) - Arr: 14/11/1936. Dep: 12/12/1936.    
08/03/1937 Allocation Reallocated to Hitchin (GNR) (HIT )    
27/11/1937 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 27/11/1937. Dep: 31/12/1937.    
02/01/1938 Allocation Reallocated to Kings Cross (KX)    
07/08/1938 Allocation Reallocated to Hitchin (GNR) (HIT )    
02/12/1939 Works Visit Works Visit - Doncaster Works (General) - Arr: 02/12/1939. Dep: 13/01/1940.    
03/05/1941 Works Visit Works Visit - Doncaster Works (General) - Arr: 03/05/1941. Dep: 28/06/1941.    
14/04/1944 Works Visit Works Visit - Doncaster Works (General) - Arr: 14/04/1944. Dep: 12/05/1944.    
14/04/1945 Works Visit Works Visit - Doncaster Works (No repairs) - Arr: 14/04/1945. Dep: 14/04/1945.    
26/04/1945 Withdrawn Condemned as 4434    
1946 Number Allocated Allocated number 2864 but not taken up    

prev prev