Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 15 Online
» 686 Today
» 4163 Yesterday
» 14092 Week
» 67108 Month
» 186635 Year
» 3213488 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
Great Eastern Railway 1878 m/e 05/1902
London and North Eastern Railway (1924) 8878 y/e 1924
London and North Eastern Railway (1942) 7748 y/e Not applied
London and North Eastern Railway (1946) 2529 m/e 06/1946
British Railways 62529 m/e 04/1950

Locomotive Specifics
Designer J. Holden
Class D14
Company History GER/LNER
Rebuild History
ClassFrom
D1405/1902
Claud Hamilton (4-4-0)03/1929
D16/3 (4-4-0)05/1935
Wheels 4-4-0
Builder Stratford Works
Order Number F53
Fittings (as built)
Engine Brakes Westinghouse
To Service During 05/1902
Withdrawal Mon 23/11/1959 off March (31B)
Service Life 57 yrs, 6 mths , 24 dys

Disposal
Scrapping During 01/1960

Allocations
Code Subsequent Codes Name From Date
    (New) m/e 05/1902
NOR   Norwich Thorpe on 01/01/1948 (Snapshot)
MAR   March w/e 22/10/1949
     Withdrawn on 23/11/1959

SLS Allocations*
Type Code Name From Date
ALLOC NOR Norwich Thorpe 9w/e 31/03/1946
ALLOC YAR Yarmouth South Town on 29/06/1947
ALLOC MEL   on 13/08/1947
ALLOC NOR Norwich Thorpe w/e 11/10/1947
ALLOC MAR March w/e 22/10/1949
WDN   on 23/11/1959

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
by 1924 Vacuum Ejector fitted
03/1929 Saturated Diagram 27 Boiler Fitted
03/1929 Diagram 27Sat boiler fitted (Belpaire firebox)
07/1931 Extended Smokebox fitted
07/1931 Diagram 27Sup boiler fitted (Belpaire firebox)
05/1935 Superheated LNER Diagram 28A (1933) boiler fitted
05/1935 Diagram 28A (1933) boiler fitted (Round Top firebox)


Summary
Date Event Details Source See Also
05/1902 To Service To service as Great Eastern Railway Number 1878
Built at Stratford Works
Diagram 28 boiler fitted
   
1924 Modification Modification: Vacuum Ejector fitted    
1924 Renumbered Renumbered to 8878    
03/1929 Modification Diagram 27Sat boiler fitted    
03/1929 Modification Modification: Saturated Diagram 27 Boiler Fitted    
07/1931 Modification Diagram 27Sup boiler fitted    
07/1931 Modification Modification: Extended Smokebox fitted    
05/1935 Modification Diagram 28A (1933) boiler fitted    
05/1935 Modification Modification: Superheated LNER Diagram 28A (1933) boiler fitted    
1942 Number Allocated Allocated number 7748 but not taken up    
06/1946 Renumbered Renumbered to 2529    
01/01/1948 Allocation Allocation Snapshot - Norwich Thorpe (NOR)    
22/10/1949 Allocation Reallocated to March (MAR)    
04/1950 Renumbered Renumbered to 62529    
23/11/1959 Withdrawn Condemned as 62529 from March (31B)    
01/1960 Scrapped Scrapped    

prev prev