Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 15 Online
» 540 Today
» 4397 Yesterday
» 18343 Week
» 71359 Month
» 190886 Year
» 3217739 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 2044 m/e 11/1899
London and North Eastern Railway (1946) 5683 m/e 07/1946
British Railways 65683 m/e 10/1949

Locomotive Specifics
Designer W. Worsdell / V. Raven
Class J25
Company History NER/LNER
Rebuild History
ClassFrom
J2511/1899
Wheels 0-6-0
Builder Darlington Works
Order Number No Order ID issued
To Service During 11/1899
Withdrawal Mon 02/06/1958
Service Life 58 yrs, 7 mths , 2 dys

Disposal

Allocations
Code Subsequent Codes Name From Date
    (New) m/e 11/1899
AUK   West Auckland on 01/01/1948 (Snapshot)
50A   York (North) w/e 13/10/1951
50A   York (North) 4w/e 20/10/1951
50C   Selby 4w/e 17/05/1952
50B   Neville Hill 5w/e 23/07/1955
50A   York (North) 5w/e 20/07/1957
     Withdrawn on 02/06/1958

SLS Allocations*
Type Code Name From Date
ALLOC 50A York (North) w/e 13/10/1951
ALLOC 50C Selby 4w/e 17/05/1952
ALLOC 50B Neville Hill 4w/e 16/07/1955
ALLOC 50A York (North) 4w/e 13/07/1957
WDN   on 02/06/1958

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
08/1915 Rebuilt with Piston Valves
08/1915 Diagram 67 (Superheated) boiler fitted
07/1935 Rebuilt with Slide Valves
07/1935 Diagram 67 (Saturated) boiler fitted (Round Top firebox)
08/1944 Diagram 67A boiler fitted


Summary
Date Event Details Source See Also
11/1899 To Service To service as North Eastern Railway Number 2044
Built at Darlington Works
Diagram 67 (Saturated) boiler fitted
   
08/1915 Modification Diagram 67 (Superheated) boiler fitted    
08/1915 Modification Modification: Rebuilt with Piston Valves    
07/1935 Modification Diagram 67 (Saturated) boiler fitted    
07/1935 Modification Modification: Rebuilt with Slide Valves    
08/1944 Modification Diagram 67A boiler fitted    
07/1946 Renumbered Renumbered to 5683    
01/01/1948 Allocation Allocation Snapshot - West Auckland (AUK)    
10/1949 Renumbered Renumbered to 65683    
13/10/1951 Allocation Reallocated to York (North) (50A)    
20/10/1951 Allocation Reallocated to York (North) (50A)    
17/05/1952 Allocation Reallocated to Selby (50C)    
23/07/1955 Allocation Reallocated to Neville Hill (50B)    
20/07/1957 Allocation Reallocated to York (North) (50A)    
02/06/1958 Withdrawn Condemned as 65683    

prev prev