Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 21 Online
» 2610 Today
» 4163 Yesterday
» 16016 Week
» 69032 Month
» 188559 Year
» 3215412 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1924) 2967 on 29/10/1931
London and North Eastern Railway (1946) 4828   29/09/1946
British Railways 64828   21/08/1948

Locomotive Specifics
Designer N. Gresley
Class J39
Company History LNER
Wheels 0-6-0
Builder Darlington Works
Order Number No Order ID issued
Works Number 1536
Fittings (as built)
Engine Brakes Steam Brake with Vacuum Ejector
To Service Mon 29/10/1931 to Immingham (IMM)
Withdrawal Mon 21/03/1960 off Mexborough (41F)
Service Life 28 yrs, 4 mths , 21 dys

Disposal
Scrapping During 04/1960

Notes
Notes Cut up at Stratford

Allocations
Code Subsequent Codes Name From Date
IMM   Immingham (New) on 29/10/1931
LIN   Lincoln on 06/11/1931
IMM   Immingham on 22/12/1946
CLK   Colwick on 27/04/1947
40D   Tuxford on 27/09/1953
30A   Stratford on 16/01/1955
36A   Doncaster on 20/03/1955
36D   Barnsley on 02/06/1957
41F   Mexborough on 03/01/1960
     Withdrawn on 21/03/1960

SLS Allocations*
Type Code Name From Date
ALLOC IMM Immingham w/e 28/12/1946
ALLOC CLK Colwick on 27/04/1947
ALLOC 40D Tuxford 4w/e 03/10/1953
ALLOC 30A Stratford 4w/e 29/01/1955
ALLOC 36A Doncaster 4w/e 26/03/1955
ALLOC 36D Barnsley 4w/e 15/06/1957
ALLOC 41F Mexborough 4w/e 23/01/1960
WDN   on 21/03/1960

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
29/10/1931 Diagram 97 boiler fitted (number 8585)
13/01/1934 Diagram 97 boiler fitted (number 2141)
29/07/1936 Diagram 97 boiler fitted (number 2110)
02/09/1938 Diagram 97 boiler fitted (number 8009)
30/11/1940 Diagram 97 boiler fitted (number 822)
06/06/1943 Diagram 97 boiler fitted (number 3213)
06/04/1946 Diagram 97 boiler fitted (number 3208)
21/08/1948 Diagram 97 boiler fitted (number 8588)
24/04/1951 Diagram 97 boiler fitted (number 27662)
09/01/1954 Diagram 97 boiler fitted (number 27773)
27/10/1956 Diagram 97 boiler fitted (number 27653)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Gorton Works 18/12/1933 13/01/1934 27 days General Boiler number 2141 (Diagram 97)
 
Darlington Works 25/05/1936 29/07/1936 66 days General Boiler number 2110 (Diagram 97)
 
Gorton Works 08/08/1938 02/09/1938 26 days General Boiler number 8009 (Diagram 97)
 
Gorton Works 13/10/1940 30/11/1940 49 days General Boiler number 822 (Diagram 97)
 
Gorton Works 07/12/1940 17/12/1940 11 days Unclassified    
Cowlairs Works 14/04/1943 06/06/1943 54 days General Boiler number 3213 (Diagram 97)
 
Gorton Works 05/06/1944 08/07/1944 34 days General    
Gorton Works 23/09/1945 29/09/1945 7 days Light Repair    
Stratford Works 17/02/1946 06/04/1946 49 days General Boiler number 27697 (Diagram 97)
 
Gorton Works 16/06/1948 21/08/1948 67 days General Boiler number 8588 (Diagram 97)
Renumbered to BR 64828
 
Derby Works 02/03/1951 24/04/1951 54 days General Boiler number 27662 (Diagram 97)
 
Derby Works 04/05/1951 14/05/1951 11 days Unclassified    
Gorton Works 19/05/1953 04/07/1953 47 days Light Casual    
Gorton Works 07/07/1953 16/07/1953 10 days Unclassified    
Stratford Works 29/11/1953 09/01/1954 42 days General Boiler number 2188 (Diagram 97)
 
Gorton Works 10/09/1956 27/10/1956 48 days General Boiler number 27653 (Diagram 97)
 

Mentions ...
Report Date Title Report Source
07/03/1951 Derby Works Early March-Un-renumbered engines entering works were 1396 (19B), 3186 (21C), 3991 (17B), 7334 (20D), 7346 (9B), 7508 (25E), 7605 (11A). For special examination 43232 (15C). From other regions 42507/24 (33A), 64713 an 64909 (36A), 64828 (38A). New construction: 73000 had boiler on 9/3, 73002/3 an 12088/9 were frames only. Additional stored engines are 404 an 43496. Engines from other regions, repainted with emblem-2183, 64907/87. Off Works lettered L.M.S.-10000, 40430, 43995/7. SLS/195108
14/03/1951 Derby Works Early March-Un-renumbered engines entering works were 1396 (19B), 3186 (21C), 3991 (17B), 7334 (20D), 7346 (9B), 7508 (25E), 7605 (11A). For special examination 43232 (15C). From other regions 42507/24 (33A), 64713 an 64909 (36A), 64828 (38A). New construction: 73000 had boiler on 9/3: 73002/3 an 12088/9 were frames only. Additional stored engines are 404 an 43496. Engines from other regions, repainted with emblem-2183, 64907/87. Off Works lettered L.M.S.-10000, 40430, 43995/7. SLS/195104

Summary
Date Event Details Source See Also
29/10/1931 To Service To service as London and North Eastern Railway Number 2967
Built at Darlington Works, Works Number 1536
Allocated to Immingham (IMM)
Diagram 97 boiler fitted
   
06/11/1931 Allocation Reallocated to Lincoln (LIN)    
18/12/1933 Works Visit Works Visit - Gorton Works (General) - Arr: 18/12/1933. Dep: 13/01/1934.
Work undertaken:
Boiler number 2141 (Diagram 97)
   
25/05/1936 Works Visit Works Visit - Darlington Works (General) - Arr: 25/05/1936. Dep: 29/07/1936.
Work undertaken:
Boiler number 2110 (Diagram 97)
   
08/08/1938 Works Visit Works Visit - Gorton Works (General) - Arr: 08/08/1938. Dep: 02/09/1938.
Work undertaken:
Boiler number 8009 (Diagram 97)
   
13/10/1940 Works Visit Works Visit - Gorton Works (General) - Arr: 13/10/1940. Dep: 30/11/1940.
Work undertaken:
Boiler number 822 (Diagram 97)
   
07/12/1940 Works Visit Works Visit - Gorton Works (Unclassified) - Arr: 07/12/1940. Dep: 17/12/1940.    
14/04/1943 Works Visit Works Visit - Cowlairs Works (General) - Arr: 14/04/1943. Dep: 06/06/1943.
Work undertaken:
Boiler number 3213 (Diagram 97)
   
05/06/1944 Works Visit Works Visit - Gorton Works (General) - Arr: 05/06/1944. Dep: 08/07/1944.    
23/09/1945 Works Visit Works Visit - Gorton Works (Light Repair) - Arr: 23/09/1945. Dep: 29/09/1945.    
17/02/1946 Works Visit Works Visit - Stratford Works (General) - Arr: 17/02/1946. Dep: 06/04/1946.
Work undertaken:
Boiler number 27697 (Diagram 97)
   
29/09/1946 Renumbered Renumbered to 4828    
22/12/1946 Allocation Reallocated to Immingham (IMM)    
27/04/1947 Allocation Reallocated to Colwick (CLK)    
16/06/1948 Works Visit Works Visit - Gorton Works (General) - Arr: 16/06/1948. Dep: 21/08/1948.
Work undertaken:
Boiler number 8588 (Diagram 97)
Renumbered to BR 64828
   
02/03/1951 Works Visit Works Visit - Derby Works (General) - Arr: 02/03/1951. Dep: 24/04/1951.
Work undertaken:
Boiler number 27662 (Diagram 97)
   
04/05/1951 Works Visit Works Visit - Derby Works (Unclassified) - Arr: 04/05/1951. Dep: 14/05/1951.    
19/05/1953 Works Visit Works Visit - Gorton Works (Light Casual) - Arr: 19/05/1953. Dep: 04/07/1953.    
07/07/1953 Works Visit Works Visit - Gorton Works (Unclassified) - Arr: 07/07/1953. Dep: 16/07/1953.    
27/09/1953 Allocation Reallocated to Tuxford (40D)    
29/11/1953 Works Visit Works Visit - Stratford Works (General) - Arr: 29/11/1953. Dep: 09/01/1954.
Work undertaken:
Boiler number 2188 (Diagram 97)
   
16/01/1955 Allocation Reallocated to Stratford (30A)    
20/03/1955 Allocation Reallocated to Doncaster (36A)    
10/09/1956 Works Visit Works Visit - Gorton Works (General) - Arr: 10/09/1956. Dep: 27/10/1956.
Work undertaken:
Boiler number 27653 (Diagram 97)
   
02/06/1957 Allocation Reallocated to Barnsley (36D)    
03/01/1960 Allocation Reallocated to Mexborough (41F)    
21/03/1960 Withdrawn Condemned as 64828 from Mexborough (41F)    
04/1960 Scrapped Scrapped    

prev prev