Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 8 Online
» 889 Today
» 4868 Yesterday
» 19800 Week
» 84754 Month
» 287418 Year
» 3314271 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1924) 3496 on 23/02/1924
London and North Eastern Railway (1946) 3941   07/10/1946
British Railways 63941 w/e 25/12/1948

Locomotive Specifics
Designer N. Gresley
Class O2
Company History GNR/LNER
Wheels 2-8-0
Builder Doncaster Works
Order Number -
Works Number 1584
Fittings (as built)
Engine Brakes Vacuum Brakes fitted
To Service Tue 23/02/1924 to Doncaster (DON)
Withdrawal Tue 03/09/1963 off Grantham (34F)
Service Life 39 yrs, 6 mths , 11 dys

Disposal
Scrapping During 02/1964 at Rigleys (Bulwell Forest)

Allocations
Code Subsequent Codes Name From Date
DON   Doncaster (New) on 23/02/1924
NWE   New England on 01/01/1925
GRA   Grantham on 25/06/1945
FRO   Frodingham on 09/02/1947
40E   Langwith Junction on 12/03/1950
40E   Langwith Junction w/e 18/03/1950
36A   Doncaster on 25/06/1950
36A   Doncaster m/e 30/06/1950
34F   Grantham on 26/11/1961
     Withdrawn on 03/09/1963

SLS Allocations*
Type Code Name From Date
ALLOC FRO Frodingham on 09/02/1947
ALLOC 40E Langwith Junction w/e 18/03/1950
ALLOC 36A Doncaster m/e 30/06/1950
ALLOC 34F Grantham 5w/e 09/12/1961
WDN   on 03/09/1963

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
23/02/1924 Diagram 2 boiler fitted (number 7710)
18/11/1933 Diagram 2 boiler fitted (number 7509)
07/10/1939 Diagram 2 boiler fitted (number 8457)
06/09/1941 Diagram 2 boiler fitted (number 9244)
23/11/1948 Diagram 2 boiler fitted (number 9321)
17/08/1951 Diagram 2 boiler fitted (number 21032)
13/04/1955 Diagram 2 boiler fitted (number 21067)
09/02/1961 Diagram 2 boiler fitted (number 21054)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Doncaster Works 06/08/1926 27/11/1926 114 days General    
Doncaster Works 08/12/1928 09/02/1929 64 days General    
Doncaster Works 25/04/1931 06/06/1931 43 days General    
Doncaster Works 07/05/1932 28/05/1932 22 days Light Repair    
Doncaster Works 14/10/1933 18/11/1933 36 days General Boiler number 7509 (Diagram 2)
 
Doncaster Works 20/07/1935 17/08/1935 29 days General    
Doncaster Works 07/08/1937 28/08/1937 22 days General    
Doncaster Works 26/08/1939 07/10/1939 43 days General Boiler number 8457 (Diagram 2)
 
Doncaster Works 02/08/1941 06/09/1941 36 days General Boiler number 9244 (Diagram 2)
 
Doncaster Works 13/11/1943 04/12/1943 22 days General    
Doncaster Works 17/08/1946 07/09/1946 22 days General    
Doncaster Works 10/11/1948 23/11/1948 14 days General Boiler number 9321 (Diagram 2)
Renumbered to BR 63941
 
Doncaster Works 22/07/1951 17/08/1951 27 days General Boiler number 21032 (Diagram 2)
 
Doncaster Works 15/03/1955 13/04/1955 30 days General Boiler number 21067 (Diagram 2)
 
Doncaster Works 15/03/1956 11/04/1956 28 days Light Casual    
Doncaster Works 07/01/1961 09/02/1961 34 days General Boiler number 21054 (Diagram 2)
 

Mentions ...
Report Date Title Report Source
04/01/1959 Doncaster MPD (Stored) On shed, waiting Works-60101 (64B), 60506 (34E), 60118 (56C), 60078 (52A), 61159 (40B). Ex Wks.-60517 (52B), 60137 (52A), 61978 (34E), 70000 (30A), 61894 (40A), 61956 (40B), 60094 (64B), 61212 (36E). Stored-63939/41/2/3/54/6/7/63/4/7/9/77/81/3/4, 64876/981 all in open. Others-60031 (64B), D3646/7 (36C), 92035 (36C), D3621/2, D3481/2, 92172/3/95/2201, 69586 (34C), 48269 (2E), 62017/55/70 (31B), 43060 (40F). SLS/195902

Summary
Date Event Details Source See Also
23/02/1924 To Service To service as London and North Eastern Railway Number 3496
Built at Doncaster Works, Works Number 1584
Allocated to Doncaster (DON)
Diagram 2 boiler fitted
   
01/01/1925 Allocation Reallocated to New England (NWE)    
06/08/1926 Works Visit Works Visit - Doncaster Works (General) - Arr: 06/08/1926. Dep: 27/11/1926.    
08/12/1928 Works Visit Works Visit - Doncaster Works (General) - Arr: 08/12/1928. Dep: 09/02/1929.    
25/04/1931 Works Visit Works Visit - Doncaster Works (General) - Arr: 25/04/1931. Dep: 06/06/1931.    
07/05/1932 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 07/05/1932. Dep: 28/05/1932.    
14/10/1933 Works Visit Works Visit - Doncaster Works (General) - Arr: 14/10/1933. Dep: 18/11/1933.
Work undertaken:
Boiler number 7509 (Diagram 2)
   
20/07/1935 Works Visit Works Visit - Doncaster Works (General) - Arr: 20/07/1935. Dep: 17/08/1935.    
07/08/1937 Works Visit Works Visit - Doncaster Works (General) - Arr: 07/08/1937. Dep: 28/08/1937.    
26/08/1939 Works Visit Works Visit - Doncaster Works (General) - Arr: 26/08/1939. Dep: 07/10/1939.
Work undertaken:
Boiler number 8457 (Diagram 2)
   
02/08/1941 Works Visit Works Visit - Doncaster Works (General) - Arr: 02/08/1941. Dep: 06/09/1941.
Work undertaken:
Boiler number 9244 (Diagram 2)
   
13/11/1943 Works Visit Works Visit - Doncaster Works (General) - Arr: 13/11/1943. Dep: 04/12/1943.    
25/06/1945 Allocation Reallocated to Grantham (GRA)    
17/08/1946 Works Visit Works Visit - Doncaster Works (General) - Arr: 17/08/1946. Dep: 07/09/1946.    
07/10/1946 Renumbered Renumbered to 3941    
09/02/1947 Allocation Reallocated to Frodingham (FRO)    
10/11/1948 Works Visit Works Visit - Doncaster Works (General) - Arr: 10/11/1948. Dep: 23/11/1948.
Work undertaken:
Boiler number 9321 (Diagram 2)
Renumbered to BR 63941
   
12/03/1950 Allocation Reallocated to Langwith Junction (40E)    
18/03/1950 Allocation Reallocated to Langwith Junction (40E)    
25/06/1950 Allocation Reallocated to Doncaster (36A)    
30/06/1950 Allocation Reallocated to Doncaster (36A)    
22/07/1951 Works Visit Works Visit - Doncaster Works (General) - Arr: 22/07/1951. Dep: 17/08/1951.
Work undertaken:
Boiler number 21032 (Diagram 2)
   
15/03/1955 Works Visit Works Visit - Doncaster Works (General) - Arr: 15/03/1955. Dep: 13/04/1955.
Work undertaken:
Boiler number 21067 (Diagram 2)
   
15/03/1956 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 15/03/1956. Dep: 11/04/1956.    
07/01/1961 Works Visit Works Visit - Doncaster Works (General) - Arr: 07/01/1961. Dep: 09/02/1961.
Work undertaken:
Boiler number 21054 (Diagram 2)
   
26/11/1961 Allocation Reallocated to Grantham (34F)    
03/09/1963 Withdrawn Condemned as 63941 from Grantham (34F)    
02/1964 Scrapped Broken up by Rigleys: Bulwell Forest    

prev prev