Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 19 Online
» 3919 Today
» 4868 Yesterday
» 22830 Week
» 87784 Month
» 290448 Year
» 3317301 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1924) 3842 on 10/10/1942
London and North Eastern Railway (1946) 3972   10/11/1946
British Railways 63972 w/e 25/12/1948

Locomotive Specifics
Designer N. Gresley
Class O2
Company History GNR/LNER
Wheels 2-8-0
Builder Doncaster Works
Order Number -
Works Number 1940
Fittings (as built)
Engine Brakes Vacuum Brakes fitted
To Service Sat 10/10/1942 to Doncaster (DON)
Withdrawal Sat 04/05/1963 off Retford Thrumpton (G.C.) (36E)
Service Life 20 yrs, 6 mths , 24 dys

Disposal
Scrapping During 01/1964 at Rigleys (Bulwell Forest)

Allocations
Code Subsequent Codes Name From Date
DON   Doncaster (New) on 10/10/1942
CLK   Colwick on 23/01/1944
LNG   Langwith Junction on 20/10/1946
36B   Mexborough on 02/07/1950
36E   Retford Thrumpton (G.C.) on 05/08/1951
36E   Retford Thrumpton (G.C.) w/e 11/08/1951
     Withdrawn on 04/05/1963

SLS Allocations*
Type Code Name From Date
ALLOC LNG Langwith Junction w/e 26/10/1946
ALLOC 36B Mexborough w/e 02/07/1950
ALLOC 36E Retford Thrumpton (G.C.) w/e 11/08/1951
WDN   on 04/05/1963

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
10/10/1942 Diagram 2 boiler fitted (number 9323)
24/12/1948 Diagram 2 boiler fitted (number 9394)
17/05/1950 Diagram 2 boiler fitted (number 9398)
23/09/1952 Diagram 2 boiler fitted (number 21058)
21/10/1954 Diagram 2 boiler fitted (number 21040)
06/12/1960 Diagram 2 boiler fitted (number 21044)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Doncaster Works 17/04/1943 01/05/1943 15 days Light Repair    
Doncaster Works 22/04/1944 27/05/1944 36 days Light Repair    
Doncaster Works 17/02/1945 17/03/1945 29 days General    
Doncaster Works 03/11/1946 21/12/1946 49 days General Renumbered to LNER (1946) number 3972
 
Doncaster Works 30/11/1947 19/12/1947 20 days Light Repair    
Doncaster Works 14/12/1948 24/12/1948 11 days General Boiler number 9394 (Diagram 2)
Renumbered to BR 63972
 
Doncaster Works 09/04/1950 17/05/1950 39 days General Boiler number 9398 (Diagram 2)
 
Doncaster Works 20/08/1952 23/09/1952 35 days General Boiler number 21058 (Diagram 2)
 
Doncaster Works 20/09/1954 21/10/1954 32 days General Boiler number 21040 (Diagram 2)
 
Doncaster Works 28/01/1957 09/03/1957 41 days General    
Doncaster Works 20/10/1960 06/12/1960 48 days General Boiler number 21044 (Diagram 2)
 
Doncaster Works 20/03/1962 05/04/1962 17 days Light Casual    

Summary
Date Event Details Source See Also
10/10/1942 To Service To service as London and North Eastern Railway Number 3842
Built at Doncaster Works, Works Number 1940
Allocated to Doncaster (DON)
Diagram 2 boiler fitted
   
17/04/1943 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 17/04/1943. Dep: 01/05/1943.    
23/01/1944 Allocation Reallocated to Colwick (CLK)    
22/04/1944 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 22/04/1944. Dep: 27/05/1944.    
17/02/1945 Works Visit Works Visit - Doncaster Works (General) - Arr: 17/02/1945. Dep: 17/03/1945.    
20/10/1946 Allocation Reallocated to Langwith Junction (LNG)    
03/11/1946 Works Visit Works Visit - Doncaster Works (General) - Arr: 03/11/1946. Dep: 21/12/1946.
Work undertaken:
Renumbered to LNER (1946) number 3972
   
30/11/1947 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 30/11/1947. Dep: 19/12/1947.    
14/12/1948 Works Visit Works Visit - Doncaster Works (General) - Arr: 14/12/1948. Dep: 24/12/1948.
Work undertaken:
Boiler number 9394 (Diagram 2)
Renumbered to BR 63972
   
09/04/1950 Works Visit Works Visit - Doncaster Works (General) - Arr: 09/04/1950. Dep: 17/05/1950.
Work undertaken:
Boiler number 9398 (Diagram 2)
   
02/07/1950 Allocation Reallocated to Mexborough (36B)    
05/08/1951 Allocation Reallocated to Retford Thrumpton (G.C.) (36E)    
11/08/1951 Allocation Reallocated to Retford Thrumpton (G.C.) (36E)    
20/08/1952 Works Visit Works Visit - Doncaster Works (General) - Arr: 20/08/1952. Dep: 23/09/1952.
Work undertaken:
Boiler number 21058 (Diagram 2)
   
20/09/1954 Works Visit Works Visit - Doncaster Works (General) - Arr: 20/09/1954. Dep: 21/10/1954.
Work undertaken:
Boiler number 21040 (Diagram 2)
   
28/01/1957 Works Visit Works Visit - Doncaster Works (General) - Arr: 28/01/1957. Dep: 09/03/1957.    
20/10/1960 Works Visit Works Visit - Doncaster Works (General) - Arr: 20/10/1960. Dep: 06/12/1960.
Work undertaken:
Boiler number 21044 (Diagram 2)
   
20/03/1962 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 20/03/1962. Dep: 05/04/1962.    
04/05/1963 Withdrawn Condemned as 63972 from Retford Thrumpton (G.C.) (36E)    
01/1964 Scrapped Broken up by Rigleys: Bulwell Forest    

prev prev