

|
* Stephenson Locomotive Society data - raw and not yet cross-referenced
|
Works | Stopped | Entry | Departure | Durn | Level of Work | Mileage |
---|---|---|---|---|---|---|
Gorton Works | 08/01/1921 | 26/02/1921 | 50 days | General | ||
Gorton Works | 10/03/1923 | 12/05/1923 | 64 days | General Boiler number 1745 (Diagram 15) |
||
Gorton Works | 05/09/1925 | 21/11/1925 | 78 days | General Boiler number 1047 (Diagram 15) Renumbered to LNER (1924) number 5399 |
||
Gorton Works | 11/08/1928 | 06/10/1928 | 57 days | General Boiler number 1405 (Diagram 15) |
||
Gorton Works | 28/06/1930 | 26/07/1930 | 29 days | General | ||
Gorton Works | 30/07/1932 | 13/08/1932 | 15 days | General Boiler number 1085 (Diagram 15) |
||
Gorton Works | 24/08/1935 | 14/09/1935 | 22 days | General Boiler number 3207 (Diagram 15) |
||
Gorton Works | 18/12/1937 | 31/12/1937 | 14 days | General Chimney altered Boiler number 3310 (Diagram 15) |
||
Gorton Works | 25/05/1940 | 08/06/1940 | 15 days | General Boiler number 3315 (Diagram 15) |
||
Stratford Works | 15/05/1943 | 26/06/1943 | 43 days | General Boiler number 3236 (Diagram 15) |
||
Gorton Works | 03/03/1945 | 24/03/1945 | 22 days | General Boiler number 3250 (Diagram 15) |
||
Gorton Works | 15/11/1947 | 06/12/1947 | 22 days | General Boiler number 809 (Diagram 15) |
||
Gorton Works | 12/08/1950 | 26/08/1950 | 15 days | General Renumbered to BR 63624 |
||
Gorton Works | 30/10/1951 | 10/11/1951 | 12 days | Light Casual Tender changed |
||
Gorton Works | 30/08/1952 | 20/09/1952 | 22 days | General Boiler number 22295 (Diagram 15) |
||
Gorton Works | 19/03/1955 | 14/05/1955 | 57 days | General Rebuilt to class O4/8 Boiler number 28880 (Diagram 100A) |
||
Gorton Works | 01/12/1956 | 15/12/1956 | 15 days | Light Casual | ||
Gorton Works | 06/12/1958 | 10/01/1959 | 36 days | General Boiler number 28307 (Diagram 100A) |
Report Date | Title | Report | Source |
---|---|---|---|
31/03/1948 | Stratford Works | The following withdrawn locomotives (all marked 'Darlington') were in the fields behind the new Works: Nos. 5383, 7120/37, 7511/12; with the exception of No. 7137, the rest had gone on 3/4, presumably to Darlington. Nos. 5399, 5410/18, 7130/32 an 8213 (all withdrawn) which were formerly in the fields are now dumped on the road next to the stripping shop. Nos. 7131/35 were being cut up in the Paint Shop. The following W.D. 2-8-0's were newly painted and had been through shops recently:-Nos. 70867/874, 78580, 78605/675, 79205/233. By the type of lettering some appeared to have been dealt with in Belgium. Nos. 1530, 1639, 1766, 4773 an 9652 had been newly painted, prefixed 'E' and lettered 'British Railways,' while those noted renumbered (60000 added) were:-Nos. 1574, 7202, 9639 an 9659. | SLS/194805 |
Date | Event | Details | Source | See Also |
---|---|---|---|---|
06/1914 | To Service | To service as Great Central Railway Number 399 Built at Gorton Works, Works Number Diagram 15 boiler fitted |
||
01/12/1916 | Allocation | Reallocated to Sheffield Neepsend (SHF) | ||
13/03/1924 | Allocation | Reallocated to Mexborough (MEX) | ||
11/08/1926 | Allocation | Reallocated to Ardsley (ARD) | ||
09/10/1928 | Allocation | Reallocated to Doncaster (DON) | ||
24/08/1933 | Allocation | Reallocated to March (MAR) | ||
30/01/1936 | Allocation | Reallocated to Colwick (CLK) | ||
23/01/1944 | Allocation | Reallocated to Doncaster (DON) | ||
02/12/1945 | Allocation | Reallocated to Frodingham (FRO) | ||
07/04/1946 | Allocation | Reallocated to Doncaster (DON) | ||
18/08/1946 | Allocation | Reallocated to Mexborough (MEX) | ||
13/12/1946 | Renumbered | Renumbered to 3624 | ||
20/10/1947 | Allocation | Reallocated to Doncaster (DON) | ||
25/06/1950 | Allocation | Reallocated to Immingham (40B) | ||
15/03/1953 | Allocation | Reallocated to Langwith Junction (40E) | ||
07/06/1953 | Allocation | Reallocated to Immingham (40B) | ||
20/09/1953 | Allocation | Reallocated to Sheffield Darnall (39B) | ||
09/12/1962 | Withdrawn | Condemned as 63624 from Sheffield Darnall (41A) |

