Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 17 Online
» 2000 Today
» 4397 Yesterday
» 19803 Week
» 72819 Month
» 192346 Year
» 3219199 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 1708 m/e 05/1902
London and North Eastern Railway (1946) 3266   30/06/1946

Locomotive Specifics
Designer W. Worsdell
Class Q5
Company History NER/LNER
Rebuild History
ClassFrom
Q5/105/1902
Wheels 0-8-0
Builder Gateshead Works
Order Number A139
Works Number 6 02
Fittings (as built)
Engine Brakes Steam
To Service During 05/1902 to Starbeck (SBK)
Withdrawal Sat 22/11/1947 off Middlesbrough (MID)
Service Life 45 yrs, 6 mths , 23 dys
Information Slide valves

Disposal
Scrapping Locomotive Works (Darlington)

Notes
Notes Cut up at BRW07

Allocations
Code Subsequent Codes Name From Date
SBK   Starbeck (New) m/e 05/1902
NPT   Newport (Teeside) on 09/04/1931
MID   Middlesbrough on 05/05/1931
NPT   Newport (Teeside) on 07/11/1938
MID   Middlesbrough on 05/06/1939
     Withdrawn on 22/11/1947

SLS Allocations*
Type Code Name From Date
WDN MID Middlesbrough on 22/11/1947

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
05/1902 Diagram 56 boiler fitted (number G179)
04/1911 Diagram 56 boiler fitted (number G328)
12/1919 Diagram 56 boiler fitted (number D1007)
23/12/1929 Diagram 56 boiler fitted (number D988)
13/12/1937 Diagram 56B boiler fitted (number 2904)
05/08/1940 Diagram 56B boiler fitted (number 3126)
27/05/1943 Diagram 56B boiler fitted (number 3372)
27/10/1945 Diagram 56B boiler fitted (number 2804)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
  1911 04/1911   General Boiler number G328 (Diagram 56)
 
  1919 12/1919   General Boiler number D1007 (Diagram 56)
 
Darlington Works 12/08/1924 20/10/1924 70 days General    
Darlington Works 03/06/1927 09/09/1927 99 days General    
Darlington Works 04/11/1929 23/12/1929 50 days General Boiler number D988 (Diagram 56)
 
Darlington Works 17/11/1931 23/12/1931 37 days General    
Darlington Works 23/08/1935 02/10/1935 41 days General    
Darlington Works 01/11/1937 13/12/1937 43 days General Boiler number 2904 (Diagram 56B)
 
Darlington Works 08/11/1938 30/11/1938 23 days Unclassified    
Darlington Works 08/07/1940 05/08/1940 29 days General Boiler number 3126 (Diagram 56B)
 
Darlington Works 29/04/1943 27/05/1943 29 days General Boiler number 3372 (Diagram 56B)
 
Darlington Works 17/08/1944 07/09/1944 22 days Light Repair    
Darlington Works 02/10/1945 27/10/1945 26 days General Boiler number 2804 (Diagram 56B)
 
Gateshead Works 16/12/1946 24/12/1946 9 days Light Repair    
Darlington Works 13/10/1947 13/10/1947 1 day No repairs    

Summary
Date Event Details Source See Also
05/1902 To Service To service as North Eastern Railway Number 1708
Built at Gateshead Works, Works Number 6 02
Allocated to Starbeck (SBK)
Diagram 56 boiler fitted
   
12/08/1924 Works Visit Works Visit - Darlington Works (General) - Arr: 12/08/1924. Dep: 20/10/1924.    
03/06/1927 Works Visit Works Visit - Darlington Works (General) - Arr: 03/06/1927. Dep: 09/09/1927.    
04/11/1929 Works Visit Works Visit - Darlington Works (General) - Arr: 04/11/1929. Dep: 23/12/1929.
Work undertaken:
Boiler number D988 (Diagram 56)
   
09/04/1931 Allocation Reallocated to Newport (Teeside) (NPT)    
05/05/1931 Allocation Reallocated to Middlesbrough (MID)    
17/11/1931 Works Visit Works Visit - Darlington Works (General) - Arr: 17/11/1931. Dep: 23/12/1931.    
23/08/1935 Works Visit Works Visit - Darlington Works (General) - Arr: 23/08/1935. Dep: 02/10/1935.    
01/11/1937 Works Visit Works Visit - Darlington Works (General) - Arr: 01/11/1937. Dep: 13/12/1937.
Work undertaken:
Boiler number 2904 (Diagram 56B)
   
07/11/1938 Allocation Reallocated to Newport (Teeside) (NPT)    
08/11/1938 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 08/11/1938. Dep: 30/11/1938.    
05/06/1939 Allocation Reallocated to Middlesbrough (MID)    
08/07/1940 Works Visit Works Visit - Darlington Works (General) - Arr: 08/07/1940. Dep: 05/08/1940.
Work undertaken:
Boiler number 3126 (Diagram 56B)
   
29/04/1943 Works Visit Works Visit - Darlington Works (General) - Arr: 29/04/1943. Dep: 27/05/1943.
Work undertaken:
Boiler number 3372 (Diagram 56B)
   
17/08/1944 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 17/08/1944. Dep: 07/09/1944.    
02/10/1945 Works Visit Works Visit - Darlington Works (General) - Arr: 02/10/1945. Dep: 27/10/1945.
Work undertaken:
Boiler number 2804 (Diagram 56B)
   
30/06/1946 Renumbered Renumbered to 3266    
16/12/1946 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 16/12/1946. Dep: 24/12/1946.    
13/10/1947 Works Visit Works Visit - Darlington Works (No repairs) - Arr: 13/10/1947. Dep: 13/10/1947.    
22/11/1947 Withdrawn Condemned as 3266 from Middlesbrough (MID)    

prev prev