Numbers Carried
Company Number Date From
North Eastern Railway 792 m/e 10/1903
London and North Eastern Railway (1946) 3287   25/08/1946
British Railways 63287   Not applied

Locomotive Specifics
Designer W. Worsdell
Class Q5
Company History NER/LNER
Rebuild History
ClassFrom
Q5/110/1903
Wheels 0-8-0
Builder Gateshead Works
Order Number E107
Works Number 17/O3
Fittings (as built)
Engine Brakes Steam
To Service During 10/1903 to Newport (Teeside) (NPT)
Withdrawal Wed 29/11/1950 off Borough Gardens (54C)
Service Life 47 yrs, 1 mth , 30 dys
Information Piston valves

Disposal
Scrapping During 11/1950 at Locomotive Works (Darlington)

Notes
Notes Cut up at BRW07

Allocations
Code Subsequent Codes Name From Date
NPT   Newport (Teeside) (New) m/e 10/1903
BOR   Borough Gardens on 28/03/1943
     Withdrawn on 29/11/1950

SLS Allocations*
Type Code Name From Date
WDN   on 27/11/1950

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
10/1903 Diagram 56 boiler fitted (number G291)
07/10/1913 Diagram 56 boiler fitted (number G185)
07/02/1921 Diagram 56 boiler fitted (number D1074)
23/09/1938 Diagram 56 boiler fitted (number D1013)
26/09/1941 Diagram 56B boiler fitted (number 3224)
23/10/1943 Diagram 56 boiler fitted (number 2276)
20/08/1947 Diagram 56B boiler fitted (number 3127)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
  07/1913 07/10/1913   General Boiler number G185 (Diagram 56)
 
  1921 02/1921   General    
Darlington Works 05/04/1924 17/06/1924 74 days General    
Darlington Works 20/01/1928 27/03/1928 68 days General    
Darlington Works 13/01/1931 20/02/1931 39 days General    
Darlington Works 22/03/1935 08/05/1935 48 days General    
Darlington Works 23/08/1938 23/09/1938 32 days General Boiler number D1013 (Diagram 56)
 
Darlington Works 12/05/1941 26/09/1941 138 days General Boiler number 3224 (Diagram 56B)
 
Darlington Works 30/09/1943 23/10/1943 24 days General Boiler number 2276 (Diagram 56)
 
Gateshead Works 18/08/1944 07/09/1944 21 days Light Repair    
Darlington Works 25/06/1947 20/08/1947 57 days General Boiler number 3127 (Diagram 56B)
 

Mentions ...
Report Date Title Report Source
19/08/1947 Darlington Works The following newly painted locos. were observed on shed here on 19/8: W.D. Nos. 77129, 77209, 77431, 78514 and 79204, together with 'D49' 2708 THJ. On the same day the following newly painted locos. were seen in the Works' yard: 'D49' 2738; 'Q5' 3287; 'J21' 5108; 'J24' 5604; 'J25' 5689 and ex H. & B. 'N13' 9113; whilst the following were stripped but not marked for scrapping: 'J24' 5636; 'J25' 5648/71/81/99, 5701; 'Q5' 3276/78/83/93. Further locos. also stripped were: 'D49' 2727; 'J26' 5731/60/73/77; 'Ql' 9931; W.D. Nos. 77365 (ex N.S. No. 4364) and 77162 (ex N.S. No. 4482). 'T1' 9919, 9921 and 'J77' 8429 TWD were in the Erecting Shop, whilst the frames for the new Class 'Bl' locos. were laid up to No. 1036. 'A2' 507 was in the Works yard but has since been noted in traffic while 'A2' 511 was in Stooperdale boiler yard. 'Austerity' 2-8-0's Nos. 77080 (ex N.S. No. 4330), 77225, 77306 and 77456 were stored in the Paint Shop with the cab fittings removed. The electric locos. that were previously stored had been removed. The scrap yard contained 'J21' 5053 which was almost completely cut up. The scrapping of 'Cl' No. 2845 had been commenced and outside the Works yard Nos. 2825, 2855 and 2879 were awaiting their doom. Owing to the large number of 'CI's' now being withdrawn it is quite impossible for them all to be broken up at Doncaster and consequently a number of these engines are being dealt with at Darlington. SLS/194710

Summary
Date Event Details Source See Also
10/1903 To Service To service as North Eastern Railway Number 792
Built at Gateshead Works, Works Number 17/O3
Allocated to Newport (Teeside) (NPT)
Diagram 56 boiler fitted
   
07/02/1921 Modification Diagram 56 number D1074 boiler fitted    
05/04/1924 Works Visit Works Visit - Darlington Works (General) - Arr: 05/04/1924. Dep: 17/06/1924.    
20/01/1928 Works Visit Works Visit - Darlington Works (General) - Arr: 20/01/1928. Dep: 27/03/1928.    
13/01/1931 Works Visit Works Visit - Darlington Works (General) - Arr: 13/01/1931. Dep: 20/02/1931.    
22/03/1935 Works Visit Works Visit - Darlington Works (General) - Arr: 22/03/1935. Dep: 08/05/1935.    
23/08/1938 Works Visit Works Visit - Darlington Works (General) - Arr: 23/08/1938. Dep: 23/09/1938.
Work undertaken:
Boiler number D1013 (Diagram 56)
   
12/05/1941 Works Visit Works Visit - Darlington Works (General) - Arr: 12/05/1941. Dep: 26/09/1941.
Work undertaken:
Boiler number 3224 (Diagram 56B)
   
28/03/1943 Allocation Reallocated to Borough Gardens (BOR)    
30/09/1943 Works Visit Works Visit - Darlington Works (General) - Arr: 30/09/1943. Dep: 23/10/1943.
Work undertaken:
Boiler number 2276 (Diagram 56)
   
18/08/1944 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 18/08/1944. Dep: 07/09/1944.    
25/08/1946 Renumbered Renumbered to 3287    
25/06/1947 Works Visit Works Visit - Darlington Works (General) - Arr: 25/06/1947. Dep: 20/08/1947.
Work undertaken:
Boiler number 3127 (Diagram 56B)
   
1949 Number Allocated Allocated number 63287 but not taken up    
11/1950 Scrapped Broken up by Locomotive Works: Darlington    
29/11/1950 Withdrawn Condemned as 3287 from Borough Gardens (54C)    