Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 31 Online
» 4384 Today
» 4689 Yesterday
» 19996 Week
» 118641 Month
» 321305 Year
» 3348158 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 1257 m/e 03/1913
London and North Eastern Railway (1946) 3348   31/03/1946
British Railways 63348 w/e 16/04/1949

Locomotive Specifics
Designer V. Raven
Class Q6
Company History NER/LNER
Rebuild History
ClassFrom
Q603/1913
Wheels 0-8-0
Builder Darlington Works
Order Number 441A
Fittings (as built)
Engine Brakes Steam
To Service During 03/1913 to Neville Hill (NEV)
Withdrawal Wed 17/06/1964 off Neville Hill (55H)
Service Life 51 yrs, 3 mths , 19 dys

Disposal

Notes
Notes Into Darlington for cutting up 14/8/64

Allocations
Code Subsequent Codes Name From Date
NEV   Neville Hill (New) m/e 03/1913
DAR   Darlington on 08/07/1943
HLD   Hull Dairycoates on 04/11/1944
WHL   West Hartlepool on 05/03/1945
HLD   Hull Dairycoates on 04/09/1949
HLD   Hull Dairycoates w/e 10/09/1949
SEL   Selby on 20/11/1949
SEL   Selby w/e 26/11/1949
50B   Neville Hill on 25/01/1953
50C   Selby on 16/06/1957
50A   York (North) on 13/09/1959
50B   Neville Hill on 06/12/1959
     Withdrawn on 17/06/1964

SLS Allocations*
Type Code Name From Date
ALLOC HLD Hull Dairycoates w/e 10/09/1949
ALLOC SEL Selby w/e 26/11/1949
ALLOC 50B Neville Hill 4w/e 21/02/1953
ALLOC 50C Selby 4w/e 13/07/1957
ALLOC 50A York (North) on 13/09/1959
ALLOC 50B Neville Hill 4w/e 26/12/1959
WDN   on 17/06/1964

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
03/1913 Diagram 50 boiler fitted (number D180)
10/04/1923 Diagram 50 boiler fitted (number D130)
16/07/1926 Diagram 50 boiler fitted (number D204)
31/05/1929 Diagram 50 boiler fitted (number D1170)
03/07/1933 Diagram 50 boiler fitted (number D863)
18/12/1936 Diagram 50 boiler fitted (number 2394)
05/02/1942 Diagram 50 boiler fitted (number 2430)
14/06/1944 Diagram 50 boiler fitted (number D1945)
14/04/1949 Diagram 50A boiler fitted (number 2993)
29/06/1951 Diagram 50A boiler fitted (number 24192)
27/02/1954 Diagram 50A boiler fitted (number 24189)
04/05/1957 Diagram 50A boiler fitted (number 24261)
10/12/1960 Diagram 50A boiler fitted (number 24333)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Darlington Works 22/12/1922 10/04/1923 110 days General Boiler number D130 (Diagram 50)
 
Darlington Works 09/03/1926 16/07/1926 130 days General Boiler number D204 (Diagram 50)
 
Darlington Works 30/07/1926 12/08/1926 14 days Light Repair    
Darlington Works 16/04/1929 31/05/1929 46 days General Boiler number D1170 (Diagram 50)
 
Darlington Works 29/05/1933 03/07/1933 36 days General Boiler number D863 (Diagram 50)
 
Darlington Works 04/11/1936 18/12/1936 45 days General Boiler number 2394 (Diagram 50)
 
Darlington Works 20/04/1939 28/07/1939 100 days General    
Darlington Works 07/01/1942 05/02/1942 30 days General Boiler number 2430 (Diagram 50)
 
Darlington Works 24/06/1943 03/07/1943 10 days Light Repair    
Darlington Works 22/05/1944 14/06/1944 24 days General Boiler number D1945 (Diagram 50)
 
Darlington Works 25/10/1945 25/10/1945 1 day Weighing    
Darlington Works 27/08/1946 21/09/1946 26 days General Boiler number 24268 (Diagram 50A)
 
Gateshead Works 09/11/1947 27/11/1947 19 days Light Repair    
Gateshead Works 04/07/1948 13/07/1948 10 days Light Repair    
Darlington Works 23/03/1949 14/04/1949 23 days General Boiler number 2993 (Diagram 50A)
Renumbered to BR 63348
 
Gateshead Works 14/11/1950 11/12/1950 28 days Light Casual    
Darlington Works 04/06/1951 29/06/1951 26 days General Boiler number 24192 (Diagram 50A)
 
Darlington Works 05/07/1951 09/07/1951 5 days Unclassified    
Darlington Works 20/10/1952 15/11/1952 27 days Light Casual    
Darlington Works 09/02/1954 27/02/1954 19 days General Boiler number 24189 (Diagram 50A)
 
Darlington Works 01/03/1954 03/03/1954 3 days Unclassified    
Darlington Works 28/03/1957 04/05/1957 38 days General Boiler number 24261 (Diagram 50A)
 
Darlington Works 06/05/1957 09/05/1957 4 days Unclassified    
Darlington Works 11/11/1960 10/12/1960 30 days General Boiler number 24333 (Diagram 50A)
 
Darlington Works 29/12/1960 12/01/1961 15 days Unclassified    
Darlington Works 25/06/1962 11/07/1962 17 days Light Casual After collision
 

Mentions ...
Report Date Title Report Source
30/04/1949 Darlington Works New work April: Nos. 60146 an 60147. Locomotives awaiting Works during April included: Nos. 888, 1035, 61199, 1224, 1405, 61625, 1668, 2726, 62753. 2760, 3044, 3260, 3275, 63286, 5044/68, 5109, 65633/50, 5653, 65684, 5858, 65868, 7278, 7675, 67729 (light re-pair), 67739 (damaged), 8156, 69842, Class '8' W.D. 77037, 77178 an 79206. Broken up: Nos. 63286, 3316, 65633/84.
Locomotives ex Works during April included: Nos. 60816, 61023, 61215/40/57, 61422, 61434 (rebuilt), 61648, 62700/03/64/67, 63348/80/92, 63411, 65110, 65739, 65821/44, 67722 (light repair), 68015/27, 68409/14/32, 68705, 69107, 69391, 69835/36/88, Class '8' W.D. 90382, 90449 (light repair) and 90460.
SLS/194906
13/09/1959 Selby & Starbeck MPDs closed The locomotive depots at Selby and Starbeck were closed as from 13/9/59. As a result, most of their locomotive allocation has been transferred to York (50A) viz. 47438/62, 47581, 61466/9, 62738/53/70, 63348, 63436/49, 64706/25, 64818/21/45/7/55/7/9/61/6, 64904/42/4, 68686, 69910/2, 77004/13. SLS/195911

Summary
Date Event Details Source See Also
03/1913 To Service To service as North Eastern Railway Number 1257
Built at Darlington Works, Works Number
Allocated to Neville Hill (NEV)
Diagram 50 boiler fitted
   
22/12/1922 Works Visit Works Visit - Darlington Works (General) - Arr: 22/12/1922. Dep: 10/04/1923.
Work undertaken:
Boiler number D130 (Diagram 50)
   
09/03/1926 Works Visit Works Visit - Darlington Works (General) - Arr: 09/03/1926. Dep: 16/07/1926.
Work undertaken:
Boiler number D204 (Diagram 50)
   
30/07/1926 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 30/07/1926. Dep: 12/08/1926.    
16/04/1929 Works Visit Works Visit - Darlington Works (General) - Arr: 16/04/1929. Dep: 31/05/1929.
Work undertaken:
Boiler number D1170 (Diagram 50)
   
29/05/1933 Works Visit Works Visit - Darlington Works (General) - Arr: 29/05/1933. Dep: 03/07/1933.
Work undertaken:
Boiler number D863 (Diagram 50)
   
04/11/1936 Works Visit Works Visit - Darlington Works (General) - Arr: 04/11/1936. Dep: 18/12/1936.
Work undertaken:
Boiler number 2394 (Diagram 50)
   
20/04/1939 Works Visit Works Visit - Darlington Works (General) - Arr: 20/04/1939. Dep: 28/07/1939.    
07/01/1942 Works Visit Works Visit - Darlington Works (General) - Arr: 07/01/1942. Dep: 05/02/1942.
Work undertaken:
Boiler number 2430 (Diagram 50)
   
24/06/1943 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 24/06/1943. Dep: 03/07/1943.    
08/07/1943 Allocation Reallocated to Darlington (DAR)    
22/05/1944 Works Visit Works Visit - Darlington Works (General) - Arr: 22/05/1944. Dep: 14/06/1944.
Work undertaken:
Boiler number D1945 (Diagram 50)
   
04/11/1944 Allocation Reallocated to Hull Dairycoates (HLD)    
05/03/1945 Allocation Reallocated to West Hartlepool (WHL)    
25/10/1945 Works Visit Works Visit - Darlington Works (Weighing) - Arr: 25/10/1945. Dep: 25/10/1945.    
31/03/1946 Renumbered Renumbered to 3348    
27/08/1946 Works Visit Works Visit - Darlington Works (General) - Arr: 27/08/1946. Dep: 21/09/1946.
Work undertaken:
Boiler number 24268 (Diagram 50A)
   
09/11/1947 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 09/11/1947. Dep: 27/11/1947.    
04/07/1948 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 04/07/1948. Dep: 13/07/1948.    
23/03/1949 Works Visit Works Visit - Darlington Works (General) - Arr: 23/03/1949. Dep: 14/04/1949.
Work undertaken:
Boiler number 2993 (Diagram 50A)
Renumbered to BR 63348
   
04/09/1949 Allocation Reallocated to Hull Dairycoates (HLD)    
10/09/1949 Allocation Reallocated to Hull Dairycoates (HLD)    
20/11/1949 Allocation Reallocated to Selby (SEL)    
26/11/1949 Allocation Reallocated to Selby (SEL)    
14/11/1950 Works Visit Works Visit - Gateshead Works (Light Casual) - Arr: 14/11/1950. Dep: 11/12/1950.    
04/06/1951 Works Visit Works Visit - Darlington Works (General) - Arr: 04/06/1951. Dep: 29/06/1951.
Work undertaken:
Boiler number 24192 (Diagram 50A)
   
05/07/1951 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 05/07/1951. Dep: 09/07/1951.    
20/10/1952 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 20/10/1952. Dep: 15/11/1952.    
25/01/1953 Allocation Reallocated to Neville Hill (50B)    
09/02/1954 Works Visit Works Visit - Darlington Works (General) - Arr: 09/02/1954. Dep: 27/02/1954.
Work undertaken:
Boiler number 24189 (Diagram 50A)
   
01/03/1954 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 01/03/1954. Dep: 03/03/1954.    
28/03/1957 Works Visit Works Visit - Darlington Works (General) - Arr: 28/03/1957. Dep: 04/05/1957.
Work undertaken:
Boiler number 24261 (Diagram 50A)
   
06/05/1957 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 06/05/1957. Dep: 09/05/1957.    
16/06/1957 Allocation Reallocated to Selby (50C)    
13/09/1959 Allocation Reallocated to York (North) (50A)    
06/12/1959 Allocation Reallocated to Neville Hill (50B)    
11/11/1960 Works Visit Works Visit - Darlington Works (General) - Arr: 11/11/1960. Dep: 10/12/1960.
Work undertaken:
Boiler number 24333 (Diagram 50A)
   
29/12/1960 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 29/12/1960. Dep: 12/01/1961.    
25/06/1962 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 25/06/1962. Dep: 11/07/1962.
Work undertaken:
After collision
   
17/06/1964 Withdrawn Condemned as 63348 from Neville Hill (55H)    

prev prev