Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 19 Online
» 1992 Today
» 4163 Yesterday
» 15398 Week
» 68414 Month
» 187941 Year
» 3214794 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1924) 3661 on 07/01/1942
London and North Eastern Railway (1946 1st) 834 on Not applied
London and North Eastern Railway (1946 2nd) 934   06/01/1947
British Railways 60934   20/10/1948

Locomotive Specifics
Designer N. Gresley
Class V2
Company History LNER
Wheels 2-6-2
Builder Doncaster Works
Works Number 1893
To Service Mon 07/01/1942 to York (North) (YK)
Withdrawal Mon 22/10/1962 off Tweedmouth (52D)
Service Life 20 yrs, 9 mths , 15 dys

Disposal
Scrapping Fri 03/05/1963 at Locomotive Works (Darlington)

Notes
Notes Into Darlington Works for cutting up 3/5/63

Allocations
Code Subsequent Codes Name From Date
YK   York (North) (New) on 07/01/1942
52A   Gateshead on 08/06/1958
52D   Tweedmouth on 10/09/1961
     Withdrawn on 22/10/1962

SLS Allocations*
Type Code Name From Date
ALLOC 52A Gateshead 4w/e 14/06/1958
ALLOC 52D Tweedmouth 3w/e 30/09/1961
WDN   w/e 22/10/1962

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
07/01/1942 Diagram 109 boiler fitted (number 9233)
01/02/1947 Diagram 109 boiler fitted (number 3136)
14/05/1949 Diagram 109 boiler fitted (number 3266)
20/09/1951 Diagram 109 boiler fitted (number 29502)
02/10/1953 Diagram 109 boiler fitted (number 29470)
01/10/1955 Diagram 109 boiler fitted (number 29521)
16/10/1957 Diagram 109 boiler fitted (number 29340)
24/10/1958 Mechanical elements of ATC fitted
07/04/1959 Electrical elements of ATC fitted
19/11/1959 Diagram 109 boiler fitted (number 29528)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Doncaster Works 25/02/1943 17/03/1943 21 days Light Repair    
Doncaster Works 15/12/1943 22/01/1944 39 days General    
Doncaster Works 23/06/1945 04/08/1945 43 days General    
Doncaster Works 08/01/1947 01/02/1947 25 days General Boiler number 29487 (Diagram 109)
 
Doncaster Works 15/12/1947 03/01/1948 20 days Light Repair    
Doncaster Works 01/10/1948 23/10/1948 23 days Light Repair Renumbered to BR 60934
 
Doncaster Works 25/03/1949 14/05/1949 51 days General Boiler number 3266 (Diagram 109)
 
Darlington Works 17/08/1951 20/09/1951 35 days General Boiler number 29502 (Diagram 109)
 
Darlington Works 31/08/1953 02/10/1953 33 days General Boiler number 29470 (Diagram 109)
 
Darlington Works 20/12/1954 20/12/1954 1 day Weighing    
Darlington Works 07/09/1955 01/10/1955 25 days General Boiler number 29521 (Diagram 109)
 
Darlington Works 03/10/1955 05/10/1955 3 days Unclassified    
Darlington Works 17/09/1957 16/10/1957 30 days General Boiler number 29340 (Diagram 109)
 
Darlington Works 21/10/1958 24/10/1958 4 days Unclassified Mechanical elements of ATC fitted
 
Darlington Works 01/12/1958 22/01/1959 53 days Light Casual    
Darlington Works 02/04/1959 07/04/1959 6 days Unclassified Electrical elements of ATC fitted
 
Darlington Works 15/10/1959 19/11/1959 36 days General Boiler number 29528 (Diagram 109)
 
Darlington Works 07/06/1960 10/06/1960 4 days Unclassified    

Mentions ...
Report Date Title Report Source
30/04/1949 Doncaster Works Locomotives noted in Works during April included Nos. 13, 17, 60033/34, 56, 69, 91, 60527, 802/07/96, 911/28/34/54, while those ex the Paint Shop included Nos. 60004/10/27/28/55 an 60100. As yet there is not any sign of either the new blue or green paint being used. SLS/194906

Summary
Date Event Details Source See Also
07/01/1942 To Service To service as London and North Eastern Railway Number 3661
Built at Doncaster Works, Works Number 1893
Allocated to York (North) (YK)
Diagram 109 boiler fitted
   
25/02/1943 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 25/02/1943. Dep: 17/03/1943.    
15/12/1943 Works Visit Works Visit - Doncaster Works (General) - Arr: 15/12/1943. Dep: 22/01/1944.    
23/06/1945 Works Visit Works Visit - Doncaster Works (General) - Arr: 23/06/1945. Dep: 04/08/1945.    
1946 Number Allocated Allocated number 834 but not taken up    
06/01/1947 Renumbered Renumbered to 934    
08/01/1947 Works Visit Works Visit - Doncaster Works (General) - Arr: 08/01/1947. Dep: 01/02/1947.
Work undertaken:
Boiler number 29487 (Diagram 109)
   
15/12/1947 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 15/12/1947. Dep: 03/01/1948.    
01/10/1948 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 01/10/1948. Dep: 23/10/1948.
Work undertaken:
Renumbered to BR 60934
   
25/03/1949 Works Visit Works Visit - Doncaster Works (General) - Arr: 25/03/1949. Dep: 14/05/1949.
Work undertaken:
Boiler number 3266 (Diagram 109)
   
17/08/1951 Works Visit Works Visit - Darlington Works (General) - Arr: 17/08/1951. Dep: 20/09/1951.
Work undertaken:
Boiler number 29502 (Diagram 109)
   
31/08/1953 Works Visit Works Visit - Darlington Works (General) - Arr: 31/08/1953. Dep: 02/10/1953.
Work undertaken:
Boiler number 29470 (Diagram 109)
   
20/12/1954 Works Visit Works Visit - Darlington Works (Weighing) - Arr: 20/12/1954. Dep: 20/12/1954.    
07/09/1955 Works Visit Works Visit - Darlington Works (General) - Arr: 07/09/1955. Dep: 01/10/1955.
Work undertaken:
Boiler number 29521 (Diagram 109)
   
03/10/1955 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 03/10/1955. Dep: 05/10/1955.    
17/09/1957 Works Visit Works Visit - Darlington Works (General) - Arr: 17/09/1957. Dep: 16/10/1957.
Work undertaken:
Boiler number 29340 (Diagram 109)
   
08/06/1958 Allocation Reallocated to Gateshead (52A)    
21/10/1958 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 21/10/1958. Dep: 24/10/1958.
Work undertaken:
Mechanical elements of ATC fitted
   
01/12/1958 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 01/12/1958. Dep: 22/01/1959.    
02/04/1959 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 02/04/1959. Dep: 07/04/1959.
Work undertaken:
Electrical elements of ATC fitted
   
15/10/1959 Works Visit Works Visit - Darlington Works (General) - Arr: 15/10/1959. Dep: 19/11/1959.
Work undertaken:
Boiler number 29528 (Diagram 109)
   
07/06/1960 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 07/06/1960. Dep: 10/06/1960.    
10/09/1961 Allocation Reallocated to Tweedmouth (52D)    
22/10/1962 Withdrawn Condemned as 60934 from Tweedmouth (52D)    
03/05/1963 Scrapped Broken up by Locomotive Works: Darlington    

prev prev