Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 15 Online
» 790 Today
» 4469 Yesterday
» 14833 Week
» 79787 Month
» 282451 Year
» 3309304 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Pre TOPS (Pre Tops) D867 26/04/1961  

Names Carried
Name Date From
ZENITH 26/04/1961

Locomotive Specifics
Class as Built 42
Subclass/Rebuild History
ClassFrom
4226/04/1961
Wheels B-B
Builder Swindon Works
Order Number 448
Fittings (as built)
Train Brakes Vacuum Brakes fitted
Steam Boiler Spanner Mk 1
AWS Western Region AWS (ATC) fitted
Multiple Fitting White Diamond
To Service 26/04/1961 to Laira (83D)
Withdrawn 18/10/1971
Time in Service 10 yrs, 5 mths , 22 dys
Total Mileage 991,000 miles
Cut Up 30/09/1972
Cut At Locomotive Works (Swindon)
Status Scrapped

Liveries Carried - WIP
Code Colour Date From
BFYE BR Blue bodywork, full yellow cab front by 09/1970

Allocations - WIP
Code Subsequent Codes Name From Date
83D   Laira (New) on 26/04/1961
83A   Newton Abbot 7w/e 19/06/1966
84A   Laira 4w/e 31/08/1967
     Withdrawn on 18/10/1971

Configuration - WIP
Date Configuration Description Additional Diagram Source
26/04/1961 vb Vacuum brakes, Steam heat WR ATC    


Summary
Start Event Details Source See Also
26/04/1961 To Service To service as British Railways number D867, name: ZENITH
Built at Swindon Works
Allocated to Laira (83D)
   
19/06/1966 Allocation Reallocated to Newton Abbot (83A)    
31/08/1967 Allocation Reallocated to Laira (84A)    
09/1970 Livery Change of livery to BR Blue bodywork, full yellow cab front    
18/10/1971 Withdrawn Condemned as 867    
30/09/1972 Scrapped Broken up by Locomotive Works: Swindon    

prev prev