Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 18 Online
» 3012 Today
» 4163 Yesterday
» 16418 Week
» 69434 Month
» 188961 Year
» 3215814 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Pre TOPS (Pre Tops) D868 18/05/1961  

Names Carried
Name Date From
ZEPHYR 18/05/1961

Locomotive Specifics
Class as Built 42
Subclass/Rebuild History
ClassFrom
4218/05/1961
Wheels B-B
Builder Swindon Works
Order Number 448
Fittings (as built)
Train Brakes Vacuum Brakes fitted
Steam Boiler Spanner Mk 1
AWS Western Region AWS (ATC) fitted
Multiple Fitting White Diamond
To Service 18/05/1961 to Laira (83D)
Withdrawn 03/10/1971
Time in Service 10 yrs, 4 mths , 15 dys
Total Mileage 1,008,000 miles
Cut Up 07/04/1972
Cut At Locomotive Works (Swindon)
Status Scrapped

Allocations - WIP
Code Subsequent Codes Name From Date
83D   Laira (New) on 18/05/1961
83A   Newton Abbot 7w/e 19/06/1966
84A   Laira 4w/e 31/08/1967
     Withdrawn on 03/10/1971

Configuration - WIP
Date Configuration Description Additional Diagram Source
18/05/1961 vb Vacuum brakes, Steam heat WR ATC    


Summary
Start Event Details Source See Also
18/05/1961 To Service To service as British Railways number D868, name: ZEPHYR
Built at Swindon Works
Allocated to Laira (83D)
   
19/06/1966 Allocation Reallocated to Newton Abbot (83A)    
31/08/1967 Allocation Reallocated to Laira (84A)    
03/10/1971 Withdrawn Condemned as 868    
07/04/1972 Scrapped Broken up by Locomotive Works: Swindon    

prev prev