Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 29 Online
» 3636 Today
» 4658 Yesterday
» 8294 Week
» 73248 Month
» 275912 Year
» 3302765 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
Great Western Railway 3514 m/e 06/1885

Locomotive Specifics
Designer W. Dean
Class Stella
Company History GWR
Rebuild History
ClassFrom
3201 SG 2-4-0T06/1885
3201 (2-4-0)11/1895
Wheels 2-4-0
Builder Swindon Works
Order Number 64
Works Number 1019
Fittings (as built)
Condenser Fitted
Boiler Diagram S2 (Round top firebox)
Train Brakes Vacuum
To Service During 06/1885
Withdrawal During 04/1929
Service Life 43 yrs , 10 mths

Disposal

Allocations
Code Subsequent Codes Name From Date
    (New) m/e 06/1885
     Withdrawn m/e 04/1929

Modifications
Date Modified Modification
03/1901 Diagram D0 boiler fitted
10/1910 Diagram B2 boiler fitted (Belpaire firebox)
11/1912 Diagram S4 boiler fitted (Round top firebox)
01/1917 Diagram B4 boiler fitted (Belpaire firebox)
09/1921 Superheated boiler fitted


Summary
Date Event Details Source See Also
06/1885 To Service To service as Great Western Railway Number 3514
Built at Swindon Works, Works Number 1019
   
03/1901 Modification Diagram D0 boiler fitted    
10/1910 Modification Diagram B2 boiler fitted    
11/1912 Modification Diagram S4 boiler fitted    
01/1917 Modification Diagram B4 boiler fitted    
09/1921 Modification Modification: Superheated boiler fitted    
04/1929 Withdrawn Condemned as 3514    

prev prev