Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 17 Online
» 1486 Today
» 4163 Yesterday
» 14892 Week
» 67908 Month
» 187435 Year
» 3214288 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
Great Western Railway 962 m/e 07/1874

Locomotive Specifics
Designer J. Armstrong
Class 1076
Company History GWR
Rebuild History
ClassFrom
72707/1874
1076 (0-6-0PT)12/1927
Wheels 0-6-0ST
Builder Swindon Works
Order Number 37
Works Number 538
Fittings (as built)
Boiler Diagram W3 (Round firebox)
To Service During 07/1874
Withdrawal During 03/1931
Service Life 56 yrs, 7 mths , 29 dys
Information Given an enclosed cab between 1924 and 1927. The 1st standard gauge engine to run on the main line through St Austell on 22nd May 1892.

Disposal

Allocations
Code Subsequent Codes Name From Date
    (New) m/e 07/1874
     Withdrawn m/e 03/1931

Modifications
Date Modified Modification
08/1894 Diagram S4 boiler fitted (Round top firebox)
11/1927 Diagram B4 boiler fitted (Belpaire firebox)
12/1927 Rebuilt with pannier tanks


Summary
Date Event Details Source See Also
07/1874 To Service To service as Great Western Railway Number 962
Built at Swindon Works, Works Number 538
Diagram S3 boiler fitted
   
08/1894 Modification Diagram S4 boiler fitted    
11/1927 Modification Diagram B4 boiler fitted    
12/1927 Modification Modification: Rebuilt with pannier tanks    
03/1931 Withdrawn Condemned as 962    

prev prev