Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 5 Online
» 126 Today
» 4397 Yesterday
» 17929 Week
» 70945 Month
» 190472 Year
» 3217325 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
Great Western Railway 2750   06/1899

Locomotive Specifics
Designer W. Dean
Class 2721
Company History GWR
Rebuild History
ClassFrom
272106/1899
2721 (0-6-0PT)06/1915
Wheels 0-6-0PT
Builder Swindon Works
Order Number 115
Works Number 1712
To Service During 06/1899
Withdrawal Sat 03/11/1945
Service Life 46 yrs, 5 mths , 3 dys

Disposal

Allocations
Code Subsequent Codes Name From Date
    (New) m/e 06/1899
THT   Treherbert 4w/e 14/12/1935
MTHR   Merthyr Tydfil 4w/e 11/01/1936
     Withdrawn on 03/11/1945

SLS Allocations*
Type Code Name From Date
WDN TBT   m/e 30/11/1945

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
05/1905 S2 boiler fitted
04/1907 S4 boiler fitted
05/1915 B4 boiler fitted
05/1915 Superheated boiler fitted


Summary
Date Event Details Source See Also
06/1899 To Service To service as Great Western Railway Number 2750
Built at Swindon Works, Works Number 1712
   
05/1905 Modification Modification: S2 boiler fitted    
04/1907 Modification Modification: S4 boiler fitted    
05/1915 Modification Modification: B4 boiler fitted    
05/1915 Modification Modification: Superheated boiler fitted    
14/12/1935 Allocation Reallocated to Treherbert (THT)    
11/01/1936 Allocation Reallocated to Merthyr Tydfil (MTHR)    
03/11/1945 Withdrawn Condemned as 2750    

prev prev