Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 19 Online
» 3632 Today
» 4163 Yesterday
» 17038 Week
» 70054 Month
» 189581 Year
» 3216434 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 2365 m/e 12/1922
London and North Eastern Railway (1946) 1436   28/09/1946
British Railways 61436   15/09/1949

Locomotive Specifics
Designer V. Raven
Class B16
Company History NER/LNER
Wheels 4-6-0
Builder Darlington Works
Works Number 1174
Fittings (as built)
Engine Brakes Westinghouse brake with Vacuum Ejector
To Service During 12/1922 to Gateshead (GHD)
Withdrawal Mon 25/09/1961
Service Life 38 yrs, 9 mths , 26 dys

Disposal
Scrapping During 03/1962 at Locomotive Works (Darlington)

Notes
Notes Into Darlington for cutting up 7/11/61

Allocations
Code Subsequent Codes Name From Date
GHD   Gateshead (New) m/e 12/1922
BLA   Blaydon m/e 01/1925
HLD   Hull Dairycoates on 30/09/1937
YK   York (North) on 28/03/1943
50B   Neville Hill on 06/05/1951
50B   Neville Hill w/e 12/05/1951
50A   York (North) on 17/02/1952
50A   York (North) 4w/e 23/02/1952
     Withdrawn on 25/09/1961

SLS Allocations*
Type Code Name From Date
ALLOC 50B Neville Hill w/e 12/05/1951
ALLOC 50A York (North) 4w/e 23/02/1952
WDN   on 25/09/1961

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
12/1922 Diagram 49 boiler fitted (number D1442)
29/09/1930 Diagram 49 boiler fitted (number D1588)
15/12/1933 Diagram 49 boiler fitted (number D1461)
10/11/1936 Diagram 49 boiler fitted (number D1243)
29/06/1940 Diagram 49 boiler fitted (number 2881)
24/12/1942 Diagram 49 boiler fitted (number 2884)
28/09/1946 Diagram 49 boiler fitted (number 2694)
15/09/1949 Diagram 49 boiler fitted (number 2558)
10/12/1955 Diagram 49A boiler fitted (number 24074)
11/01/1958 Diagram 49A boiler fitted (number 24069)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Gateshead Works 08/10/1925 23/12/1925 77 days General    
Gateshead Works 28/06/1927 16/09/1927 81 days General    
Darlington Works 07/07/1930 29/09/1930 85 days General Boiler number D1588 (Diagram 49)
 
Gateshead Works 30/10/1931 12/11/1931 14 days Unclassified    
Darlington Works 02/11/1933 15/12/1933 44 days General Boiler number D1461 (Diagram 49)
 
Darlington Works 23/09/1936 10/11/1936 49 days General Boiler number D1243 (Diagram 49)
 
Darlington Works 25/11/1936 17/12/1936 23 days Unclassified    
Darlington Works 06/10/1938 03/01/1939 90 days Light Repair    
Darlington Works 02/06/1940 29/06/1940 28 days General Boiler number 2881 (Diagram 49)
 
Darlington Works 23/11/1942 24/12/1942 32 days General Boiler number 2884 (Diagram 49)
 
Gateshead Works 12/11/1944 24/11/1944 13 days Light Repair    
Darlington Works 30/08/1946 28/09/1946 30 days General Boiler number 24032 (Diagram 49)
Renumbered to LNER (1946) number 1436
 
Gateshead Works 09/12/1947 24/12/1947 16 days Light Repair    
Darlington Works 19/08/1949 15/09/1949 28 days General Boiler number 2558 (Diagram 49)
Renumbered to BR 61436
 
Darlington Works 24/09/1949 30/09/1949 7 days Unclassified    
Darlington Works 21/05/1951 31/05/1951 11 days Light Casual After collision
 
Darlington Works 09/03/1953 25/04/1953 48 days General Boiler number 24060 (Diagram 49)
 
Darlington Works 27/04/1953 01/05/1953 5 days Unclassified    
Darlington Works 10/11/1955 10/12/1955 31 days General Boiler number 24074 (Diagram 49A)
 
Gateshead Works 19/12/1955 23/12/1955 5 days Unclassified    
Darlington Works 20/12/1957 11/01/1958 23 days Heavy Casual Boiler number 24069 (Diagram 49A)
 
Darlington Works 06/10/1958 12/11/1958 38 days Heavy Intermediate    

Mentions ...
Report Date Title Report Source
11/11/1961 Darlington Works (Scrap Yard) Erecting Shop: D17, D249/51/79, D3317 D4079-81, D5102/49/68-73, 43141, 60859/64/91, 60952, 61020/4, 61129/92, 61218/89, 61382, 63405, 68025, 90067, 90333/44/63, 90445, 92194/5. Works Yard: D245/74, D2246, D3228, 12113, 46450/80, 60856, 60916/23/48, 61008, 61216/20/57, 63342/59, 63419/69, 65099, 65769, 65821/60, 67647, 67762, 68007/50, 69008, 78026, 80069, 90009, 90450, 92183. Stripping Shop: 61415/47. Outside Stripping Shop: 60939, 63435, 65691. Crossing: D272, D351 D3140, D4078, D5096, D5101/67, 60806. Scrap Yard: 61411-4/9/22/3/31/6/60, 65741, 67707/13/7/22/75/94, 68675/92, 68702 intact. SLS/196201
14/01/1962 Darlington Works (Scrap Road) Erecting Shop: D11, D256/71, D3316, D4083-8, D5107/8/49/72-5, 12119/20, 43053/7, 60812/98, 61275, 61388, 61454, 63381, 63467, 65768/72, 67638, 69005, 78026, 80118, 90397, 90620. Stripping Shop: 43071, 65892, 80117. Outside Stripping Shop: 60835, 61161, 92202. Works Yard: D18, D5096, 43055, 46450, 60809/22, 60963, 64897, 65099, 65862/9, 67681, 67718, 68017/43, 92064, 92199. Crossing: D17, D270/3, D2173, D2247/65, D3140, D4082, D5113. Scrap Road: 61411-3/5/9/36/43/50-2/9/60, 64979, 65741/69, 67707/13/22/39/50/72/5, 68688/9, 68729 all intact. SLS/196203
11/02/1962 Darlington Works (Scrap Road) Erecting Shop: D14/7/8/24/6, D3071/4, D4087-92, D5108/48/73-5, 12120, 60807/35/7, 60931, 61035, 61274, 63438/64/70/2, 65892, 67742, 80117, 90310, 90677/95, 92202, Weigh House: Nil. Outside Weigh House: 82027, Stripping Shop: 46407, 65751, 80116. Outside Stripping Shop: 46460, 61039, 61383, 67753, 68064, 68672. Works Yard: D281, D2173, D2589, 43016/53/5/71, 60954/9/77/81, 63412, 65099, 65794, 65889, 67609, 68010/43, 80119. 90603. Crossing: D257/78/80, D2247, D4086, D5107/49. Scrap Road: 61201, 61368, 61411-3/5/9/36/43/50/1/60, 64979, 65741/69, 65839, 67707/22/7/39/50/75, 68063, 68674/80/88/9/98, 68703/29/34. SLS/196204

Summary
Date Event Details Source See Also
12/1922 To Service To service as North Eastern Railway Number 2365
Built at Darlington Works, Works Number 1174
Allocated to Gateshead (GHD)
Diagram 49 boiler fitted
   
01/1925 Allocation Reallocated to Blaydon (BLA)    
08/10/1925 Works Visit Works Visit - Gateshead Works (General) - Arr: 08/10/1925. Dep: 23/12/1925.    
28/06/1927 Works Visit Works Visit - Gateshead Works (General) - Arr: 28/06/1927. Dep: 16/09/1927.    
07/07/1930 Works Visit Works Visit - Darlington Works (General) - Arr: 07/07/1930. Dep: 29/09/1930.
Work undertaken:
Boiler number D1588 (Diagram 49)
   
30/10/1931 Works Visit Works Visit - Gateshead Works (Unclassified) - Arr: 30/10/1931. Dep: 12/11/1931.    
02/11/1933 Works Visit Works Visit - Darlington Works (General) - Arr: 02/11/1933. Dep: 15/12/1933.
Work undertaken:
Boiler number D1461 (Diagram 49)
   
23/09/1936 Works Visit Works Visit - Darlington Works (General) - Arr: 23/09/1936. Dep: 10/11/1936.
Work undertaken:
Boiler number D1243 (Diagram 49)
   
25/11/1936 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 25/11/1936. Dep: 17/12/1936.    
30/09/1937 Allocation Reallocated to Hull Dairycoates (HLD)    
06/10/1938 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 06/10/1938. Dep: 03/01/1939.    
02/06/1940 Works Visit Works Visit - Darlington Works (General) - Arr: 02/06/1940. Dep: 29/06/1940.
Work undertaken:
Boiler number 2881 (Diagram 49)
   
23/11/1942 Works Visit Works Visit - Darlington Works (General) - Arr: 23/11/1942. Dep: 24/12/1942.
Work undertaken:
Boiler number 2884 (Diagram 49)
   
28/03/1943 Allocation Reallocated to York (North) (YK)    
12/11/1944 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 12/11/1944. Dep: 24/11/1944.    
30/08/1946 Works Visit Works Visit - Darlington Works (General) - Arr: 30/08/1946. Dep: 28/09/1946.
Work undertaken:
Boiler number 24032 (Diagram 49)
Renumbered to LNER (1946) number 1436
   
09/12/1947 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 09/12/1947. Dep: 24/12/1947.    
19/08/1949 Works Visit Works Visit - Darlington Works (General) - Arr: 19/08/1949. Dep: 15/09/1949.
Work undertaken:
Boiler number 2558 (Diagram 49)
Renumbered to BR 61436
   
24/09/1949 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 24/09/1949. Dep: 30/09/1949.    
06/05/1951 Allocation Reallocated to Neville Hill (50B)    
12/05/1951 Allocation Reallocated to Neville Hill (50B)    
21/05/1951 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 21/05/1951. Dep: 31/05/1951.
Work undertaken:
After collision
   
17/02/1952 Allocation Reallocated to York (North) (50A)    
23/02/1952 Allocation Reallocated to York (North) (50A)    
09/03/1953 Works Visit Works Visit - Darlington Works (General) - Arr: 09/03/1953. Dep: 25/04/1953.
Work undertaken:
Boiler number 24060 (Diagram 49)
   
27/04/1953 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 27/04/1953. Dep: 01/05/1953.    
10/11/1955 Works Visit Works Visit - Darlington Works (General) - Arr: 10/11/1955. Dep: 10/12/1955.
Work undertaken:
Boiler number 24074 (Diagram 49A)
   
19/12/1955 Works Visit Works Visit - Gateshead Works (Unclassified) - Arr: 19/12/1955. Dep: 23/12/1955.    
20/12/1957 Works Visit Works Visit - Darlington Works (Heavy Casual) - Arr: 20/12/1957. Dep: 11/01/1958.
Work undertaken:
Boiler number 24069 (Diagram 49A)
   
06/10/1958 Works Visit Works Visit - Darlington Works (Heavy Intermediate) - Arr: 06/10/1958. Dep: 12/11/1958.    
25/09/1961 Withdrawn Condemned as 61436    
03/1962 Scrapped Broken up by Locomotive Works: Darlington    

prev prev