Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 18 Online
» 2690 Today
» 4163 Yesterday
» 16096 Week
» 69112 Month
» 188639 Year
» 3215492 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
Great Central Railway 869 m/e 02/1899
London and North Eastern Railway (1924) 5869 m/e 08/1925

Locomotive Specifics
Designer H. Pollitt
Class D6
Company History GCR/LNER
Rebuild History
ClassFrom
D602/1899
Wheels 4-4-0
Builder Beyer Peacock Ltd.
Works Number 3987
Fittings (as built)
Engine Brakes Vacuum
To Service During 02/1899
Withdrawal During 06/1943
Service Life 44 yrs , 4 mths

Disposal

Allocations
Code Subsequent Codes Name From Date
    (New) m/e 02/1899
     Withdrawn m/e 06/1943

Modifications
Date Modified Modification
1902 Westinghouse Brake fitted
04/1914 Superheated boiler fitted
03/1932 Modified to conform to LNER Gauge
01/1934 Westinghouse Brake removed


Summary
Date Event Details Source See Also
02/1899 To Service To service as Great Central Railway Number 869
Built at Beyer Peacock Ltd., Works Number 3987
   
1902 Modification Modification: Westinghouse Brake fitted    
04/1914 Modification Modification: Superheated boiler fitted    
08/1925 Renumbered Renumbered to 5869    
03/1932 Modification Modification: Modified to conform to LNER Gauge    
01/1934 Modification Modification: Westinghouse Brake removed    
06/1943 Withdrawn Condemned as 5869    

prev prev