Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 23 Online
» 1466 Today
» 4397 Yesterday
» 19269 Week
» 72285 Month
» 191812 Year
» 3218665 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev
Numbers Carried
Company Number Date From
Great Central Railway 881 m/e 04/1899
London and North Eastern Railway (1924) 5881 m/e 07/1926

Locomotive Specifics
Designer H. Pollitt
Class D6
Company History GCR/LNER
Rebuild History
ClassFrom
D604/1899
Wheels 4-4-0
Builder Beyer Peacock Ltd.
Works Number 3999
Fittings (as built)
Engine Brakes Vacuum
To Service During 04/1899
Withdrawal During 12/1932
Service Life 33 yrs, 7 mths , 30 dys

Disposal

Allocations
Code Subsequent Codes Name From Date
    (New) m/e 04/1899
     Withdrawn m/e 12/1932

Modifications
Date Modified Modification
12/1912 Superheated boiler fitted
09/1928 Modified to conform to LNER Gauge


Summary
Date Event Details Source See Also
04/1899 To Service To service as Great Central Railway Number 881
Built at Beyer Peacock Ltd., Works Number 3999
   
12/1912 Modification Modification: Superheated boiler fitted    
07/1926 Renumbered Renumbered to 5881    
09/1928 Modification Modification: Modified to conform to LNER Gauge    
12/1932 Withdrawn Condemned as 5881    

prev