Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 11 Online
» 1026 Today
» 4397 Yesterday
» 18829 Week
» 71845 Month
» 191372 Year
» 3218225 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 1031 m/e 08/1907
London and North Eastern Railway (1946) 3303 on 20/01/1946
British Railways 63303 on Not applied

Locomotive Specifics
Designer W. Worsdell
Class Q5
Company History NER/LNER
Rebuild History
ClassFrom
Q5/108/1907
Wheels 0-8-0
Builder Darlington Works
Order Number 351A
Works Number 519
Fittings (as built)
Engine Brakes Steam
To Service During 08/1907 to Blyth (North) (NBH)
Withdrawal Mon 23/04/1951 off Borough Gardens (54C)
Service Life 43 yrs, 8 mths , 23 dys
Information Slide valves

Disposal
Scrapping During 05/1951 at Locomotive Works (Darlington)

Notes
Notes Cut up at BRW07

Allocations
Code Subsequent Codes Name From Date
NBH   Blyth (North) (New) m/e 08/1907
SHI   Shildon on 05/06/1929
NPT   Newport (Teeside) on 07/01/1935
SEL   Selby on 15/07/1939
WHL   West Hartlepool on 28/03/1943
BOR   Borough Gardens on 11/07/1948
BOR   Borough Gardens w/e 17/07/1948
     Withdrawn on 23/04/1951

SLS Allocations*
Type Code Name From Date
ALLOC BOR Borough Gardens w/e 17/07/1948
WDN   on 23/04/1951

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
08/1907 Diagram 56 boiler fitted (number D1917)
11/1922 Diagram 56 boiler fitted (number D1432)
25/08/1932 Diagram 56 boiler fitted (number D1023)
19/02/1940 Diagram 56B boiler fitted (number 3117)
11/08/1942 Diagram 56B boiler fitted (number 2802)
25/05/1944 Diagram 56B boiler fitted (number 3249)
21/06/1947 Diagram 56 boiler fitted (number D1955)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
  1922 11/1922   General Boiler number D1432 (Diagram 56)
 
Gateshead Works 23/08/1927 28/10/1927 67 days General    
Darlington Works 12/07/1932 25/08/1932 45 days General Boiler number D1023 (Diagram 56)
 
Darlington Works 25/10/1935 10/01/1936 78 days General    
Darlington Works 19/07/1939 19/02/1940 216 days General Boiler number 3117 (Diagram 56B)
 
Darlington Works 01/07/1942 11/08/1942 42 days General Boiler number 2802 (Diagram 56B)
 
Darlington Works 10/08/1943 29/09/1943 51 days Light Repair    
Darlington Works 03/05/1944 25/05/1944 23 days General Boiler number 3249 (Diagram 56B)
 
Darlington Works 09/05/1947 21/06/1947 44 days General Boiler number D1955 (Diagram 56)
 

Summary
Date Event Details Source See Also
08/1907 To Service To service as North Eastern Railway Number 1031
Built at Darlington Works, Works Number 519
Allocated to Blyth (North) (NBH)
Diagram 56 boiler fitted
   
23/08/1927 Works Visit Works Visit - Gateshead Works (General) - Arr: 23/08/1927. Dep: 28/10/1927.    
05/06/1929 Allocation Reallocated to Shildon (SHI)    
12/07/1932 Works Visit Works Visit - Darlington Works (General) - Arr: 12/07/1932. Dep: 25/08/1932.
Work undertaken:
Boiler number D1023 (Diagram 56)
   
07/01/1935 Allocation Reallocated to Newport (Teeside) (NPT)    
25/10/1935 Works Visit Works Visit - Darlington Works (General) - Arr: 25/10/1935. Dep: 10/01/1936.    
15/07/1939 Allocation Reallocated to Selby (SEL)    
19/07/1939 Works Visit Works Visit - Darlington Works (General) - Arr: 19/07/1939. Dep: 19/02/1940.
Work undertaken:
Boiler number 3117 (Diagram 56B)
   
01/07/1942 Works Visit Works Visit - Darlington Works (General) - Arr: 01/07/1942. Dep: 11/08/1942.
Work undertaken:
Boiler number 2802 (Diagram 56B)
   
28/03/1943 Allocation Reallocated to West Hartlepool (WHL)    
10/08/1943 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 10/08/1943. Dep: 29/09/1943.    
03/05/1944 Works Visit Works Visit - Darlington Works (General) - Arr: 03/05/1944. Dep: 25/05/1944.
Work undertaken:
Boiler number 3249 (Diagram 56B)
   
20/01/1946 Renumbered Renumbered to 3303    
09/05/1947 Works Visit Works Visit - Darlington Works (General) - Arr: 09/05/1947. Dep: 21/06/1947.
Work undertaken:
Boiler number D1955 (Diagram 56)
   
11/07/1948 Allocation Reallocated to Borough Gardens (BOR)    
17/07/1948 Allocation Reallocated to Borough Gardens (BOR)    
1949 Number Allocated Allocated number 63303 but not taken up    
23/04/1951 Withdrawn Condemned as 3303 from Borough Gardens (54C)    
05/1951 Scrapped Broken up by Locomotive Works: Darlington    

prev prev