Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 18 Online
» 938 Today
» 4397 Yesterday
» 18741 Week
» 71757 Month
» 191284 Year
» 3218137 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 652 m/e 03/1908
London and North Eastern Railway (1946) 3315 on 23/03/1946
British Railways 63315 on Not applied

Locomotive Specifics
Designer W. Worsdell
Class Q5
Company History NER/LNER
Rebuild History
ClassFrom
Q5/103/1908
Wheels 0-8-0
Builder Darlington Works
Order Number 361A
Works Number 531
Fittings (as built)
Engine Brakes Steam
To Service During 03/1908 to Hull Dairycoates (HLD)
Withdrawal Thu 25/03/1948 off Neville Hill (NEV)
Service Life 40 yrs , 25 dys
Information Slide valves

Disposal
Scrapping During 04/1948 at Locomotive Works (Darlington)

Notes
Notes Cut up at BRW07

Allocations
Code Subsequent Codes Name From Date
HLD   Hull Dairycoates (New) m/e 03/1908
HLS   Hull Springhead on 30/01/1925
HLD   Hull Dairycoates on 14/12/1925
MAR   March on 28/00/1931
HLD   Hull Dairycoates on 05/02/1932
NPT   Newport (Teeside) on 20/09/1934
AUK   West Auckland on 03/03/1941
NEV   Neville Hill on 04/01/1948
NEV   Neville Hill w/e 10/01/1948
     Withdrawn on 25/03/1948

SLS Allocations*
Type Code Name From Date
ALLOC NEV Neville Hill w/e 10/01/1948
WDN NEV Neville Hill on 25/03/1948

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
03/1908 Diagram 56 boiler fitted (number D1930)
04/1922 Diagram 56 boiler fitted (number D1380)
12/10/1931 Diagram 56 boiler fitted (number D538)
15/02/1939 Diagram 56 boiler fitted (number 2269)
14/02/1941 Diagram 56 boiler fitted (number 2276)
03/06/1943 Diagram 56 boiler fitted (number 2272)
23/03/1946 Diagram 56 boiler fitted (number 2086)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
  04/1922   General    
Darlington Works 25/09/1924 29/11/1924 66 days General    
Darlington Works 05/12/1927 23/02/1928 81 days General    
Darlington Works 26/08/1931 12/10/1931 48 days General Boiler number D538 (Diagram 56)
 
Darlington Works 24/02/1936 08/04/1936 45 days General    
Darlington Works 28/04/1936 18/05/1936 21 days Light Repair    
Darlington Works 13/01/1939 15/02/1939 34 days General Boiler number 2269 (Diagram 56)
 
Darlington Works 08/01/1941 14/02/1941 38 days General Boiler number 2276 (Diagram 56)
 
Darlington Works 30/01/1943 13/02/1943 15 days Light Repair    
Darlington Works 07/05/1943 03/06/1943 28 days General Boiler number 2272 (Diagram 56)
 
Gateshead Works 07/09/1944 26/09/1944 20 days Light Repair    
Darlington Works 22/02/1946 23/03/1946 30 days General Boiler number 2086 (Diagram 56)
Renumbered to LNER (1946) number 3315
 
Gateshead Works 09/06/1947 21/06/1947 13 days Light Repair    
Darlington Works 11/03/1948 11/03/1948 1 day No repairs    

Mentions ...
Report Date Title Report Source
30/04/1948 Darlington Works 'L.1's' Nos. 9000-9015 are to be renumbered 67701-67716. No. 67717 (9016) is the first to come out under this number, while No. 9015 was altered to 67716. The paint dates of Nos. 9009-9012 are March, and Nos. 9013-9015 and 67717-67718 are April. The Works' Nos. are 2028-2036/48 respectively. The next order for North Road will be a batch of 'A.1' 'Pacifics.' The rumour of further 'B.1's' came about owing to Stooperdale building a batch of spare boilers for this class. Locomotives for shops or scrap during the period April 4th-May 2nd included:-Nos. 1440, E1461, 2391, 2747, 3037, 3170, 3286, 3315, 5069, 5625, 5768/88, 7306, 7649/88, 9837/52, 9917/33, 77414, 79198. The following locomotives have arrived for cutting-up:-ex G.E. Nos. 5380/83, 5400, 7120/37, 8212, ex MET Nos. 7511/12 and ex M.G.N. No. 8485. Locomotives ex shops during the same period included Nos. 5778, 9856, 60510, 60825, 61011/60/71, 61420, 62388, 63125/40, 65624/50, 65825/47/51, 67263, 67301, 67632/84, 67718, 68248/90, 68724, 69786, 69875, 69910. The following locomotives have been painted or repainted green: Nos. 61011/60/71 an 67684. No. 60510 came off Works without nameplates, but returned and has at last had these fitted-Robert the Bruce. SLS/194806

Summary
Date Event Details Source See Also
03/1908 To Service To service as North Eastern Railway Number 652
Built at Darlington Works, Works Number 531
Allocated to Hull Dairycoates (HLD)
Diagram 56 boiler fitted
   
04/1922 Modification Diagram 56 number D1380 boiler fitted    
25/09/1924 Works Visit Works Visit - Darlington Works (General) - Arr: 25/09/1924. Dep: 29/11/1924.    
30/01/1925 Allocation Reallocated to Hull Springhead (HLS)    
14/12/1925 Allocation Reallocated to Hull Dairycoates (HLD)    
05/12/1927 Works Visit Works Visit - Darlington Works (General) - Arr: 05/12/1927. Dep: 23/02/1928.    
28/00/1931 Allocation Reallocated to March (MAR)    
26/08/1931 Works Visit Works Visit - Darlington Works (General) - Arr: 26/08/1931. Dep: 12/10/1931.
Work undertaken:
Boiler number D538 (Diagram 56)
   
05/02/1932 Allocation Reallocated to Hull Dairycoates (HLD)    
20/09/1934 Allocation Reallocated to Newport (Teeside) (NPT)    
24/02/1936 Works Visit Works Visit - Darlington Works (General) - Arr: 24/02/1936. Dep: 08/04/1936.    
28/04/1936 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 28/04/1936. Dep: 18/05/1936.    
13/01/1939 Works Visit Works Visit - Darlington Works (General) - Arr: 13/01/1939. Dep: 15/02/1939.
Work undertaken:
Boiler number 2269 (Diagram 56)
   
08/01/1941 Works Visit Works Visit - Darlington Works (General) - Arr: 08/01/1941. Dep: 14/02/1941.
Work undertaken:
Boiler number 2276 (Diagram 56)
   
03/03/1941 Allocation Reallocated to West Auckland (AUK)    
30/01/1943 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 30/01/1943. Dep: 13/02/1943.    
07/05/1943 Works Visit Works Visit - Darlington Works (General) - Arr: 07/05/1943. Dep: 03/06/1943.
Work undertaken:
Boiler number 2272 (Diagram 56)
   
07/09/1944 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 07/09/1944. Dep: 26/09/1944.    
22/02/1946 Works Visit Works Visit - Darlington Works (General) - Arr: 22/02/1946. Dep: 23/03/1946.
Work undertaken:
Boiler number 2086 (Diagram 56)
Renumbered to LNER (1946) number 3315
   
09/06/1947 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 09/06/1947. Dep: 21/06/1947.    
04/01/1948 Allocation Reallocated to Neville Hill (NEV)    
10/01/1948 Allocation Reallocated to Neville Hill (NEV)    
11/03/1948 Works Visit Works Visit - Darlington Works (No repairs) - Arr: 11/03/1948. Dep: 11/03/1948.    
25/03/1948 Withdrawn Condemned as 3315 from Neville Hill (NEV)    
04/1948 Scrapped Broken up by Locomotive Works: Darlington    
1949 Number Allocated Allocated number 63315 but not taken up    

prev prev