MET/LNER Jones "M2" Class 0-6-4T
Locomotive ConstructionThe following graph shows the number of locomotives built by year. The first locomotive was delivered in December 1915 and the last in March 1916. A total of 4 locomotives were built between 1915 and 1916. |
Locomotive WithdrawalsThe following graph shows the number of locomotives withdrawn by year. The first locomotive was withdrawn in January 1943 and the last in October 1948. A total of 4 locomotives were withdrawn between 1943 and 1948. |
Class LifespanThis graph show the relationship between builds and withdrawals. The first locomotive was built in December 1915 and the last was withdrawn in October 1948. |
Class StockThis graph shows the number of locomotives in this class, by year, over the entire lifespan of the class. This information illustrates how rapidly/slowly a class may have been constructed or withdrawn from service. |