Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 12 Online
» 1102 Today
» 4616 Yesterday
» 31752 Week
» 130397 Month
» 333061 Year
» 3359914 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
Great Western Railway 1172 m/e 05/1870
Great Western Railway (2nd) 1076 m/e 07/1870

Locomotive Specifics
Designer J. Armstrong
Class 1076
Company History GWR
Rebuild History
ClassFrom
107605/1870
1076 (0-6-0PT)01/1926
Wheels 0-6-0ST
Builder Swindon Works
Order Number 22
Works Number 245
Fittings (as built)
Boiler Diagram W3 (Round firebox)
To Service During 05/1870
Withdrawal During 07/1930
Service Life 60 yrs , 2 mths
Information Given an enclosed cab between 1924 and 1927

Disposal

Allocations
Code Subsequent Codes Name From Date
    (New) m/e 05/1870
     Withdrawn m/e 07/1930

Modifications
Date Modified Modification
01/1892 Diagram S2 boiler fitted (Round top firebox)
09/1901 Diagram R3a boiler fitted (Round firebox)
05/1905 Diagram S4 boiler fitted (Round top firebox)
01/1926 Rebuilt with pannier tanks
01/1926 Diagram B4 boiler fitted (Belpaire firebox)


Summary
Date Event Details Source See Also
05/1870 To Service To service as Great Western Railway Number 1172
Built at Swindon Works, Works Number 245
Diagram S3 boiler fitted
   
07/1870 Renumbered Renumbered to 1076    
01/1892 Modification Diagram S2 boiler fitted    
09/1901 Modification Diagram R3a boiler fitted    
05/1905 Modification Diagram S4 boiler fitted    
01/1926 Modification Diagram B4 boiler fitted    
01/1926 Modification Modification: Rebuilt with pannier tanks    
07/1930 Withdrawn Condemned as 1076    

prev prev