Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 21 Online
» 4870 Today
» 5422 Yesterday
» 25904 Week
» 124549 Month
» 327213 Year
» 3354066 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
Great Western Railway 7025 on 04/08/1949

Names Carried
Date From Name
04/08/1949 SUDELEY CASTLE

Locomotive Specifics
Designer C. Collett
Class Castle
Company History GWR
Wheels 4-6-0
Builder Swindon Works
Order Number 367
To Service Mon 04/08/1949 to Old Oak Common (PDN)
Withdrawal Mon 07/09/1964 off Worcester (85A)
Service Life 15 yrs, 1 mth , 3 dys

Disposal
Scrapping During 11/1964 at Cohens (Morriston)

Tenders
Type Number From Company Water Coal
Hawksworth 4,000g 4067 04/08/1949 GWR 4,000g 6t 0cwt
Hawksworth 4,000g 4061 30/03/1951 GWR 4,000g 6t 0cwt
Hawksworth 4,000g 4103 06/02/1953 GWR 4,000g 6t 0cwt
Hawksworth 4,000g 4124 29/10/1954 GWR 4,000g 6t 0cwt
Hawksworth 4,000g 4064 23/11/1956 GWR 4,000g 6t 0cwt
Hawksworth 4,000g 4067 11/04/1958 GWR 4,000g 6t 0cwt
Hawksworth 4,000g 4071 20/11/1958 GWR 4,000g 6t 0cwt
Hawksworth 4,000g 4109 27/12/1958 GWR 4,000g 6t 0cwt
Collett 4,000g 2711 20/10/1959 GWR 4,000g 6t 0cwt
Collett 4,000g 2731 27/02/1963 GWR 4,000g 6t 0cwt
Collett 4,000g 2710 28/05/1963 GWR 4,000g 6t 0cwt

Allocations
Code Subsequent Codes Name From Date
PDN   Old Oak Common (New) on 04/08/1949
84G   Shrewsbury on 02/08/1960
85A   Worcester on 06/10/1962
     Withdrawn on 07/09/1964

SLS Allocations*
Type Code Name From Date
ALLOC 84G Shrewsbury 4w/e 13/08/1960
ALLOC 85A Worcester 4w/e 06/10/1962
WDN   on 07/09/1964
WDN   3w/e 14/09/1964

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
30/03/1951 Diagram HC boiler fitted (number 7613)
06/02/1953 Diagram HC boiler fitted (number 7616)
29/10/1954 Diagram HC boiler fitted (number 7643)
23/11/1956 Diagram HC boiler fitted (number 7633)
16/06/1960 Diagram HC boiler fitted (number 7630)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Swindon Works 28/02/1951 30/03/1951 31 days Heavy Intermediate Boiler number 7613 (Diagram HC)
Tender number 4061 (Hawksworth 4,000g) attached.
104114
Swindon Works 30/12/1952 06/02/1953 39 days Heavy Intermediate Boiler number 7616 (Diagram HC)
Tender number 4103 (Hawksworth 4,000g) attached.
216013
Swindon Works 13/02/1953 02/03/1953 18 days Unclassified    
Swindon Works 28/09/1954 29/10/1954 32 days Heavy Intermediate Boiler number 7643 (Diagram HC)
Tender number 4124 (Hawksworth 4,000g) attached.
312742
Swindon Works 08/06/1956 23/11/1956 169 days Heavy General Boiler number 7633 (Diagram HC)
Tender number 4064 (Hawksworth 4,000g) attached.
395696
Swindon Works 01/03/1958 11/04/1958 42 days Heavy Intermediate Tender number 4067 (Hawksworth 4,000g) attached.
477993
Swindon Works 27/08/1958 20/11/1958 86 days Light Casual Tender number 4071 (Hawksworth 4,000g) attached.
 
Swindon Works 12/04/1960 16/06/1960 66 days Heavy General Boiler number 7630 (Diagram HC)
574111
Swindon Works 12/12/1962 27/02/1963 78 days Light Intermediate Tender number 2731 (Collett 4,000g) attached.
651138

Mentions ...
Report Date Title Report Source
31/08/1949 Swindon Works New Work August: Nos. 7025 Sudeley Castle PDN (2/8), 7026 Tenby Castle (15/8), 7027 Thornbury Castle LA (25/8); 1503 PDN (8/8), 1504 PDN (17/8), 1505 PDN (29/8). Nos. 7025-27 are painted dark green and lined, while Nos. 1503-05 are unlined black. Contractor built: Nos. 8400 TYS, 8401 CDF, 8402 (W.G.B. 2912/49) PILL (26/8), 8450 (Y.E. Co. 2443/49) NPT (17/8). Nos. 8400-02/50 are unlined black. Condemned: Nos. 289 (original T.V. R/T boiler and curved top tanks), 1884 (closed cab), 1930 (open cab), 2902, 3182 an 3419. No. 6320 has been re-converted to coal-burning. Locomotives entering Works during August included: Nos. 1000/04/25, 1427/37, 2117 (closed cab), 2211/12/14/21/67, 2462, 2815/52/75/87, 3016/20, 3174/86, 3635/77, 3715/99, 3805/14/43, 4013/15/33/47/80, 4107/48/49/55, 4269/78, 4502/10/59/65/82/92/95, 4637/50/79/97, 4906/51/81, 5001/18/30/42/57/76/80/94/99, 5206, 5344/45/80, 5501/05/22/37/54, 5749, 5804, 5904/12/21/27/44/45/47/66, 6000/04/19, 6105/07/43/61, 6338/77, 6408/31, 6741, 6808/19/28/29/44, 6905/65, 7219/36, 7310, 7414, 7718, 7815/16, 7904, 8789, 9638 an 90712. Further locomotives painted black and fully lined include Nos. 1005/12, 4901/23/50, 5912/18 an 6920. September: A batch of new Class '2' 2-6-2T's and Class '4' 2-6-0's is to be built here. They will be similar to existing L.M.S. designs, but will have modified G.W.R. boilers. The frames have already been cut for five of the 2-6-0's. SLS/194910
06/01/1962 Oswestry Works Under repair-2236 (89C), 7025 (89A), 78000 (89C), 92247 and W & L 823. 9017 was stored with tender 1805 of May, 1911. SLS/196202
09/08/1963 Worcester Works 2251, 4607, 5954, 7025 an 9493. SLS/196309

Summary
Date Event Details Source See Also
04/08/1949 To Service To service as Great Western Railway Number 7025, name: SUDELEY CASTLE
Built at Swindon Works
Allocated to Old Oak Common (PDN)
Tender fitted: Hawksworth 4,000g
Diagram HC boiler fitted
   
28/02/1951 Works Visit Works Visit - Swindon Works (Heavy Intermediate) - Arr: 28/02/1951. Dep: 30/03/1951.
Work undertaken:
Boiler number 7613 (Diagram HC)
Tender number 4061 (Hawksworth 4,000g) attached.
   
30/12/1952 Works Visit Works Visit - Swindon Works (Heavy Intermediate) - Arr: 30/12/1952. Dep: 06/02/1953.
Work undertaken:
Boiler number 7616 (Diagram HC)
Tender number 4103 (Hawksworth 4,000g) attached.
   
13/02/1953 Works Visit Works Visit - Swindon Works (Unclassified) - Arr: 13/02/1953. Dep: 02/03/1953.    
28/09/1954 Works Visit Works Visit - Swindon Works (Heavy Intermediate) - Arr: 28/09/1954. Dep: 29/10/1954.
Work undertaken:
Boiler number 7643 (Diagram HC)
Tender number 4124 (Hawksworth 4,000g) attached.
   
08/06/1956 Works Visit Works Visit - Swindon Works (Heavy General) - Arr: 08/06/1956. Dep: 23/11/1956.
Work undertaken:
Boiler number 7633 (Diagram HC)
Tender number 4064 (Hawksworth 4,000g) attached.
   
01/03/1958 Works Visit Works Visit - Swindon Works (Heavy Intermediate) - Arr: 01/03/1958. Dep: 11/04/1958.
Work undertaken:
Tender number 4067 (Hawksworth 4,000g) attached.
   
27/08/1958 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 27/08/1958. Dep: 20/11/1958.
Work undertaken:
Tender number 4071 (Hawksworth 4,000g) attached.
   
27/12/1958 Tender Tender fitted: Hawksworth 4,000g number 4109    
20/10/1959 Tender Tender fitted: Collett 4,000g number 2711    
12/04/1960 Works Visit Works Visit - Swindon Works (Heavy General) - Arr: 12/04/1960. Dep: 16/06/1960.
Work undertaken:
Boiler number 7630 (Diagram HC)
   
02/08/1960 Allocation Reallocated to Shrewsbury (84G)    
06/10/1962 Allocation Reallocated to Worcester (85A)    
12/12/1962 Works Visit Works Visit - Swindon Works (Light Intermediate) - Arr: 12/12/1962. Dep: 27/02/1963.
Work undertaken:
Tender number 2731 (Collett 4,000g) attached.
   
28/05/1963 Tender Tender fitted: Collett 4,000g number 2710    
07/09/1964 Withdrawn Condemned as 7025 from Worcester (85A)    
11/1964 Scrapped Broken up by Cohens: Morriston    

prev prev