Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 15 Online
» 3345 Today
» 3419 Yesterday
» 21831 Week
» 75285 Month
» 421709 Year
» 3448562 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
Great Western Railway 4052 m/e 06/1914

Names Carried
Date From Name
06/1914 PRINCESS BEATRICE

Locomotive Specifics
Designer G. Churchward
Class Star
Company History GWR
Wheels 4-6-0
Builder Swindon Works
Order Number 199
Works Number 2578
To Service During 06/1914
Withdrawal Tue 30/06/1953 off Shrewsbury (84G)
Service Life 39 yrs , 30 dys

Disposal
Scrapping Locomotive Works (Swindon)

Allocations
Code Subsequent Codes Name From Date Reference
    (New) m/e 06/1914  
OXF   Oxford on 15/06/1947 (Snapshot)  
WOS   Worcester m/e 31/05/1948  
HFD   Hereford 4w/e 10/07/1948  
WOS   Worcester 4w/e 27/11/1948  
84G   Shrewsbury 4w/e 25/03/1950  
     Withdrawn on 30/06/1953  

SLS Allocations*
Type Code Name From Date
ALLOC WOS Worcester m/e 31/05/1948
ALLOC HFD Hereford 4w/e 10/07/1948
ALLOC WOS Worcester 4w/e 27/11/1948
ALLOC 84G Shrewsbury 4w/e 25/03/1950
WDN   m/e 30/06/1953

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
04/1939 'Castle' pattern outside steam pipes fitted


Mentions ...
Report Date Title Report Source
28/02/1946 Swindon Works Locos entering works during February: 1499, 1967, 2034/60, 2211/59, 2573, 2753/79, 2803/17/9/41/58/79/96, 2944, 3013/23/30, 3186, 3216, 3737/64, 3865, 4030/49/52/6/73/83/92, 4117, 4231, 4531, 4607/19/38, 4833/56, 4926, 5002/24/42/53/68/77/8, 5151, 4320/36/78 5412/21, 5506/43/68, 5689, 5737, 5912/7/71/83, 6002/18/27, 6105/47/68, 6300/84/7, 6717/37, 6806/66, 6932/8/46, 8719/34/69, 9306, 9768/89/91. Nameplates were affixed to 6938/46. SLS/194605
24/03/1946 Stock Returns No. 92 which has been shown as withdrawn, was transferred to Wellingon in October 1938 and is still there. On 2/3 it appeared to be 100 per cent. intact but for the coupling rods. Assuming that the date of its withdrawal from service coincided with its conversion to a stationary boiler, the official date of 8/42 must be questioned for it has been functioning as such at least since the summer of 1941. No: 92 is not the only locomotive to be so employed, for 1287, which was withdrawn on 9/9/39 and subsequently reinstated, is at Leamington. However although employed for the ,same purpose as 92, and in the same condition, it still remains on the capital list. Mr. Seddon would be grateful for any information as to when 1287 first appeared at Leamington, for how long she was at work as a motive unit and also as to the last time that 92 was actively engaged at Wellington. Regarding the latter this will be co-related with the first appearance there of L.M.S. saddle tank 16027, which is permanently on loan from 4A. 3573/80 shown in the stock returns as 2-4-0T should be entered as 0-4-2T and the relevant totals altered accordingly. SLS/194605
28/02/1946 Swindon Works Locos entering works during February: 1499, 1967, 2034/60, 2211/59, 2573, 2753/79, 2803/17/9/41/58/79/96, 2944, 3013/23/30, 3186, 3216, 3737/64, 3865, 4030/49/52/6/73/83/92, 4117, 4231, 4531, 4607/19/38, 4833/56, 4926, 5002/24/42/53/68/77/8, 5151, 4320/36/78 5412/21, 5506/43/68, 5689, 5737, 5912/7/71/83, 6002/18/27, 6105/47/68, 6300/84/7, 6717/37, 6806/66, 6932/8/46, 8719/34/69, 9306, 9768/89/91. Nameplates were affixed to 6938/46. SLS/194605
30/11/1946 Swindon Works Locomotives entering works during October and November included 1366, 1409, 1416, 1538, 2017, 2092, 2212, 2411, 2538, 2612, 2708, 2792,2817, 2825, 2836, 2842, 2851, 2859, 2882, 2883, 2884, 2885, 2906, 2927, 2947, 2955,2980, 2987, 2889, 3016, 3026, 3363, 3421, 4038, 4042. 4046, 4052, 4059, 4903, 4934,4953, 4954, 4966, 4973, 5949, 5961, 5989, 5997, 6917, 6922, 6929, 6947, 6959, 70876, 77086, 77326, and 79309 SLS/194701
28/02/1947 Swindon Works Locos. entering works during February included: 2933, 2938, 2979, 2981, 3024, 3029, 3030, 3407, 3449, 3588, 4018, 4052, 4060, 4061, 4083, 4093, 4320, 5042, 5054, 5305, 5341, 5367, 6312, 6320, 6338, 6340, 6374, W.D. 70843, 77196, 77288, 78632, and 79234. Works' pilots during the same period included: 1796, 2044, and 2077. Further 'Panniers' fitted with T.F. boilers are: 3758, 3789, 5760, 7777, 8776 and 9771. 2891 and 3804 have both been fitted with side windows, side sheets and doors between engine and tender sides. SLS/194704
31/05/1949 Swindon Works New Work May: Nos. 7018 Drysllwyn Castle (originally intended to have been named Cranbrook Castle) LDR (24/5), 7019 Fowey Castle BRD (27/5), *7020 Gloucester Castle (31/5); *9682 (6/5). *Not allocated. Nos. 7018-20 are painted dark green and lined. Nos. 7021 Haverfordwest Castle and 7022 were nearly complete on 2/6; while on the same day No. 1500 had the motion, wheels, boiler and cab erected, No. 1501 cylinders, etc., erected, No. 1502 frames only and Nos. 7023/24 frames and cylinders only. Locomotives entering Works during May included: Nos. p23 (Petrol), 100A1, 1017, 1419/43, 2061 (closed cab), 2212/14/61/91, 2568, 2800/03/24/76/78/90, 3010/32, 3102/64/74, 3815/24/35, 4052/58/73/82, 4224, 4377, 4516/28/39, 4676, 4805/11/55/57 (for re-conversion to coal-burning), 4903/13/33/67/91/94, 5003/09/36/43/46/60/66/93/98, 5142, 5325/62, 5406, 5503/07/43/51, 5755/75/77, 5925/34/75/82, 6000/10/11/14, 6162/63 (both fitted with deconcentrating gear), 6346/57/62/73, 6710/16/24/31, 6823/40/61/68/73, 6931/36/43, 7222, 7321, 7704/90/94, 7806/07, 8701/41, 9613, 9700/10, 70836, 90357, 1299. Condemned: Nos. 277, 2756/89 (all acting as Works pilots), 30, 280 (still retains original boiler and has round topped tanks), 3400/43, 3577 (open cab), 5117. Nos. 6105/30 have had the footsteps set further inwards. No. E1299 failed here with a hot box on 11/5, after having worked the Grimsby fish train. Nos. 2863 (ex 4805) and 2853 (ex 4810) have been re-converted to coal-burning. Further locomotives painted black and fully lined include Nos. 1015, 4949/86 an 5973. Nos. 1015, 5074 and 6936 have received tenders with the new crest. Lining: Commencing with No. 5069 (ex Works 12/5), all locomotives painted dark green or black and fully lined are having the cylinders lined out with two red I' vertical bands at both ends. In addition No. 5069 also had the cleating bands lined, but subsequent locomotives (including No. 7018) have not had this done. SLS/194907
30/06/1949 Swindon Works New Work June: Nos. 7021 Haverfordwest Castle LDR (7/6), 7022 Hereford Castle CDF (14/6), 7023 Penrice Castle CDF (23/6), *7024 Powis Castle (30/6); *1500 (22/6), 41501 (1/7). *Not allocated. Nos. 7021-24 are painted dark green and lined, while Nos. 1500/1 are unlined black. No. 1500 has so far been tried on a variety of jobs, and it is possible that they all may go to Cardiff Docks. Locomotives entering Works during June included: Nos. 1001/29, 1335/63, 1458, 2216, 2534/72, 2823/81/82/84/92, 2945, 3031/34, 3161/67, 3649, 3851, 4016/37/40/83/84, 4259, 4381, 4504/13/93, 4651, 4807/54/56 (for reconversion to coal-burning), 4961, 5008/28/52/53/82, 5151, 5303/32/61, 5510/57/58, 5760/80/92, 5800, 5910/35/40/66, 6007/20, 6105/08, 6314/35/44/70/79, 6409, 6739, 6814/21/26/63/70, 6904/20/68, 7016, 7239, 7700/10/24/28/35, 7803, 7900, 8762/98 and E1066. Condemned: 53, 1731, 2651/55, 3364, 9072. No. 7900 came in for rebalancing, while No. E1066 had a hot box. No. 2848 has been reconverted to coal-burning. No. 6000 was ex Works on 17/6 painted in the new blue and lined, with crest on the tender, while No. 6011 has also appeared in the same livery, but, as yet, has no crest on the tender. Nos. 4052/58 are ex Works painted green and lined, while further locomotives painted black and fully lined include Nos. 1017/29, 6931/43 an 6936 (with the crest on the tender). Stock Shed: Nos. 4914, 5919, 6997-99 and 7902-04 have now been taken out of store and put into traffic, Nos. 4914, 6997/99 and 7902 have gone to BRD, No. 6998 to CDF and Nos. 7903/04 to PDN. SLS/194908

Summary
Date Event Details Source See Also
06/1914 To Service To service as Great Western Railway Number 4052, name: PRINCESS BEATRICE
Built at Swindon Works, Works Number 2578
   
04/1939 Modification Modification: 'Castle' pattern outside steam pipes fitted    
15/06/1947 Allocation Allocation Snapshot - Oxford (OXF)    
31/05/1948 Allocation Reallocated to Worcester (WOS)    
10/07/1948 Allocation Reallocated to Hereford (HFD)    
27/11/1948 Allocation Reallocated to Worcester (WOS)    
25/03/1950 Allocation Reallocated to Shrewsbury (84G)    
30/06/1953 Withdrawn Condemned as 4052 from Shrewsbury (84G)    

prev prev