Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 20 Online
» 1509 Today
» 5610 Yesterday
» 28688 Week
» 19744 Month
» 366168 Year
» 3393021 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
Great Western Railway 7006 on 28/06/1946

Names Carried
Date From Name
28/06/1946 LYDFORD CASTLE

Locomotive Specifics
Designer C. Collett
Class Castle
Company History GWR
Wheels 4-6-0
Builder Swindon Works
Order Number 357
To Service Mon 28/06/1946 to Shrewsbury (4A)
Withdrawal Mon 16/12/1963 off Old Oak Common (81A)
Service Life 17 yrs, 5 mths , 18 dys

Disposal
Scrapping During 08/1964 at Birds (Risca)

Tenders
Type Number From Company Water Coal
Collett 4,000g 4018 28/06/1946 GWR 4,000g 6t 0cwt
Collett 4,000g 2913 01/12/1949 GWR 4,000g 6t 0cwt
Hawksworth 4,000g 4056 18/05/1950 GWR 4,000g 6t 0cwt
Hawksworth 4,000g 4049 28/05/1951 GWR 4,000g 6t 0cwt
Collett 4,000g 2389 27/05/1952 GWR 4,000g 6t 0cwt
Hawksworth 4,000g 4069 25/05/1953 GWR 4,000g 6t 0cwt
Collett 4,000g 2779 24/01/1955 GWR 4,000g 6t 0cwt
Hawksworth 4,000g 4115 13/08/1955 GWR 4,000g 6t 0cwt
Hawksworth 4,000g 4092 20/11/1956 GWR 4,000g 6t 0cwt
Hawksworth 4,000g 4102 12/07/1958 GWR 4,000g 6t 0cwt
Collett 4,000g 2754 03/06/1960 GWR 4,000g 6t 0cwt
Collett 4,000g 2427 19/03/1962 GWR 4,000g 6t 0cwt

Allocations
Code Subsequent Codes Name From Date
4A   Shrewsbury (New) on 28/06/1946
SALOP   Shrewsbury on 15/06/1947 (Snapshot)
CDF   Cardiff Canton m/e 06/1948
CDF   Cardiff Canton m/e 30/06/1948
GLO   Gloucester Horton Road on 25/08/1948
GLO   Gloucester Horton Road on 14/10/1948
SDN   Swindon on 20/01/1950
85B   Gloucester Horton Road on 28/05/1951
81A   Old Oak Common on 26/02/1958
83D   Laira m/e 03/1958
86C   Cardiff Canton on 22/09/1959
85A   Worcester on 05/07/1960
81A   Old Oak Common on 19/03/1962
     Withdrawn on 16/12/1963

SLS Allocations*
Type Code Name From Date
ALLOC CDF Cardiff Canton m/e 30/06/1948
ALLOC GLO Gloucester Horton Road on 14/10/1948
ALLOC 83D Laira 4w/e 19/04/1958
ALLOC 86C Cardiff Canton 4w/e 03/10/1959
ALLOC 85B Gloucester Horton Road 4w/e 16/07/1960
ALLOC 85A Worcester 4w/e 10/09/1960
ALLOC 81A Old Oak Common 4w/e 24/03/1962
WDN   on 16/12/1963
WDN   4w/e 31/12/1963

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
25/08/1948 Diagram HC boiler fitted (number 6699)
20/01/1950 Diagram HC boiler fitted (number 6692)
28/05/1951 Diagram HC boiler fitted (number 7611)
25/05/1953 Diagram HC boiler fitted (number 6694)
20/11/1956 Diagram HC boiler fitted (number 7622)
09/07/1958 Diagram HC boiler fitted (number 7623)
03/06/1960 Double Chimney fitted
03/06/1960 Diagram HD boiler fitted (number 7692)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Swindon Works 13/03/1947 29/03/1947 17 days Light Repair    
Swindon Works 26/07/1948 25/08/1948 31 days Intermediate Boiler number 6699 (Diagram HC)
86093
Swindon Works 21/12/1949 20/01/1950 31 days Heavy General Boiler number 6692 (Diagram HC)
144303
Swindon Works 20/04/1951 28/05/1951 39 days Heavy Intermediate Boiler number 7611 (Diagram HC)
Tender number 4049 (Hawksworth 4,000g) attached.
207707
Swindon Works 05/09/1951 17/09/1951 13 days Unclassified    
Swindon Works 03/10/1951 19/10/1951 17 days Light Casual    
Swindon Works 07/05/1952 27/05/1952 21 days Light Casual Tender number 2389 (Collett 4,000g) attached.
 
Swindon Works 22/04/1953 25/05/1953 34 days Heavy General Boiler number 6694 (Diagram HC)
Tender number 4069 (Hawksworth 4,000g) attached.
301337
Swindon Works 01/06/1954 12/08/1954 73 days Light Casual    
Swindon Works 11/12/1954 24/01/1955 45 days Heavy Intermediate Tender number 2779 (Collett 4,000g) attached.
378580
Swindon Works 03/09/1956 20/11/1956 79 days Heavy General Boiler number 7622 (Diagram HC)
Tender number 4092 (Hawksworth 4,000g) attached.
457840
Swindon Works 12/05/1958 09/07/1958 59 days Heavy Intermediate Boiler number 7623 (Diagram HC)
533609
Swindon Works 23/03/1960 03/06/1960 73 days Heavy General Boiler number 7692 (Diagram HD)
Tender number 2754 (Collett 4,000g) attached.
Double Chimney fitted
632213
Swindon Works 15/01/1962 19/03/1962 64 days Light Intermediate Tender number 2427 (Collett 4,000g) attached.
735844

Mentions ...
Report Date Title Report Source
31/07/1948 Swindon Works Locomotives entering Works during July included: Nos 1367, 1446, 2165, 2229/36, 2385, 2809/84/98, 3778, 3832/40/59, 4075/82, 4519/28/73/85, 4698, 4965/77/88, 5077, 5191, 5261, 5306, 5403, 5805, 5904/15/43, 6157, 6343/78, 6439, 6637, 6702, 6818/25/33/46/55, 7006, 7218, 7318, 7727, 7812, 8764/87, 9312/17, 9706/81;
New work: Nos. 7014 BRD and 7015 SDN, both are painted G.W.R. green, as is No. 7016; the construction Of Nos. 4160-79 and 7430-39 is under way. During W/E 24/7 Nos. 5023, 6009 an 6910 were ex Works after having been in for the new British Railways' crest to be placed on the tenders, while during W/E 31/7 No. 5954 was ex general repair, having been painted black and lined out in red, cream and grey together with the new crest on the tender. During W/E 14/8 Nos. 7016 Chester Castle CDF and 7430 STB were completed; No. 8393 also entered Works during this week.
It is understood that the next batch of 'Castle's' (Nos. 7018-27) has been cancelled. Works' pilots lately have been and are: Nos. 906, 1758, 1900 an 2751; The following locomotives came in for cutting-up during W/E 24/7: Nos. 2680, 3002/27, 4386, 5127 an 5349
SLS/194809
04/03/1962 Swindon Works ('A' Shop) Triangle: 1435, 3636, 4123/6, 4929, 5167, 5509/11/49, 6152/3/66, 6348, 7421, 7796, 8441, 8700/79, 9738. Works Yard: D3437, 1009/21/7, 3809/49, 4093, 4632, 4905/44, 5924, 6006, 6408, 6820, 6965/7, 7002/4/27/37, 7306, 8489/94, 8721/33/62/75, 9460, 9765. Weigh House: 5967. 'C' Shop: 8735, 9416. Dump: 1642, 2205/6/30/88, 4207, 5069, 5770, 7771/2, 8451, 8768, 9454/74, 9720. 'A' Shop: D600/2/3, D808, D1002-17, D2182-6, D3035, D3354/6/60/6/97, D3425, D4009, D6315/23/37, 8, 1013/5/9/28, 2516, 2859/73/6, 3440, 4003, 4286, 4920/50, 5026/43/56, 5990/1, 6012, 6821/7/39, 6906/13/36/50/71/3/93, 7001/3/6/13/26, 7226, 7320/37, 7918, 9400, 82040, 92222/37. SLS/196204

Summary
Date Event Details Source See Also
28/06/1946 To Service To service as Great Western Railway Number 7006, name: LYDFORD CASTLE
Built at Swindon Works
Allocated to Shrewsbury (4A)
Tender fitted: Collett 4,000g
Diagram HC boiler fitted
   
13/03/1947 Works Visit Works Visit - Swindon Works (Light Repair) - Arr: 13/03/1947. Dep: 29/03/1947.    
15/06/1947 Allocation Allocation Snapshot - Shrewsbury (SALOP)    
06/1948 Allocation Reallocated to Cardiff Canton (CDF)    
30/06/1948 Allocation Reallocated to Cardiff Canton (CDF)    
26/07/1948 Works Visit Works Visit - Swindon Works (Intermediate) - Arr: 26/07/1948. Dep: 25/08/1948.
Work undertaken:
Boiler number 6699 (Diagram HC)
   
25/08/1948 Allocation Reallocated to Gloucester Horton Road (GLO)    
14/10/1948 Allocation Reallocated to Gloucester Horton Road (GLO)    
01/12/1949 Tender Tender fitted: Collett 4,000g number 2913    
21/12/1949 Works Visit Works Visit - Swindon Works (Heavy General) - Arr: 21/12/1949. Dep: 20/01/1950.
Work undertaken:
Boiler number 6692 (Diagram HC)
   
20/01/1950 Allocation Reallocated to Swindon (SDN)    
18/05/1950 Tender Tender fitted: Hawksworth 4,000g number 4056    
20/04/1951 Works Visit Works Visit - Swindon Works (Heavy Intermediate) - Arr: 20/04/1951. Dep: 28/05/1951.
Work undertaken:
Boiler number 7611 (Diagram HC)
Tender number 4049 (Hawksworth 4,000g) attached.
   
28/05/1951 Allocation Reallocated to Gloucester Horton Road (85B)    
05/09/1951 Works Visit Works Visit - Swindon Works (Unclassified) - Arr: 05/09/1951. Dep: 17/09/1951.    
03/10/1951 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 03/10/1951. Dep: 19/10/1951.    
07/05/1952 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 07/05/1952. Dep: 27/05/1952.
Work undertaken:
Tender number 2389 (Collett 4,000g) attached.
   
22/04/1953 Works Visit Works Visit - Swindon Works (Heavy General) - Arr: 22/04/1953. Dep: 25/05/1953.
Work undertaken:
Boiler number 6694 (Diagram HC)
Tender number 4069 (Hawksworth 4,000g) attached.
   
01/06/1954 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 01/06/1954. Dep: 12/08/1954.    
11/12/1954 Works Visit Works Visit - Swindon Works (Heavy Intermediate) - Arr: 11/12/1954. Dep: 24/01/1955.
Work undertaken:
Tender number 2779 (Collett 4,000g) attached.
   
13/08/1955 Tender Tender fitted: Hawksworth 4,000g number 4115    
03/09/1956 Works Visit Works Visit - Swindon Works (Heavy General) - Arr: 03/09/1956. Dep: 20/11/1956.
Work undertaken:
Boiler number 7622 (Diagram HC)
Tender number 4092 (Hawksworth 4,000g) attached.
   
26/02/1958 Allocation Reallocated to Old Oak Common (81A)    
03/1958 Allocation Reallocated to Laira (83D)    
12/05/1958 Works Visit Works Visit - Swindon Works (Heavy Intermediate) - Arr: 12/05/1958. Dep: 09/07/1958.
Work undertaken:
Boiler number 7623 (Diagram HC)
   
12/07/1958 Tender Tender fitted: Hawksworth 4,000g number 4102    
22/09/1959 Allocation Reallocated to Cardiff Canton (86C)    
23/03/1960 Works Visit Works Visit - Swindon Works (Heavy General) - Arr: 23/03/1960. Dep: 03/06/1960.
Work undertaken:
Boiler number 7692 (Diagram HD)
Tender number 2754 (Collett 4,000g) attached.
Double Chimney fitted
   
05/07/1960 Allocation Reallocated to Worcester (85A)    
15/01/1962 Works Visit Works Visit - Swindon Works (Light Intermediate) - Arr: 15/01/1962. Dep: 19/03/1962.
Work undertaken:
Tender number 2427 (Collett 4,000g) attached.
   
19/03/1962 Allocation Reallocated to Old Oak Common (81A)    
16/12/1963 Withdrawn Condemned as 7006 from Old Oak Common (81A)    
08/1964 Scrapped Broken up by Birds: Risca    

prev prev