Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 20 Online
» 2723 Today
» 3655 Yesterday
» 6378 Week
» 59832 Month
» 406256 Year
» 3433109 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
Great Western Railway 1095 m/e 11/1870

Locomotive Specifics
Designer J. Armstrong
Class Standard Goods
Company History GWR
Wheels 0-6-0
Builder Swindon Works
Order Number 23
Works Number 260
Fittings (as built)
Boiler Diagram S3 (Round top firebox)
Train Brakes Vacuum
To Service During 11/1870
Withdrawal During 12/1930
Service Life 60 yrs , 30 dys

Disposal

Allocations
Code Subsequent Codes Name From Date Reference
    (New) m/e 11/1870  
     Withdrawn m/e 12/1930  

Modifications
Date Modified Modification
03/1887 Diagram S2 boiler fitted (Round top firebox)
07/1900 Diagram S4 boiler fitted (Round top firebox)
07/1907 Diagram S2 boiler fitted (Round top firebox)
09/1911 Diagram S4 boiler fitted (Round top firebox)
03/1919 Superheated boiler fitted
03/1919 Diagram B4 boiler fitted (Belpaire firebox)


Summary
Date Event Details Source See Also
11/1870 To Service To service as Great Western Railway Number 1095
Built at Swindon Works, Works Number 260
   
03/1887 Modification Diagram S2 boiler fitted    
07/1900 Modification Diagram S4 boiler fitted    
07/1907 Modification Diagram S2 boiler fitted    
09/1911 Modification Diagram S4 boiler fitted    
03/1919 Modification Diagram B4 boiler fitted    
03/1919 Modification Modification: Superheated boiler fitted    
12/1930 Withdrawn Condemned as 1095    

prev prev