Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 20 Online
» 162 Today
» 5422 Yesterday
» 21196 Week
» 119841 Month
» 322505 Year
» 3349358 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 690 m/e 02/1908
London and North Eastern Railway (1946) 9794   12/10/1946
British Railways 69794   21/12/1948

Locomotive Specifics
Designer W. Worsdell / V. Raven
Class A6
Company History NER/LNER
Wheels 4-6-2T
Builder Gateshead Works
Works Number 88
To Service During 02/1908 to Saltburn (SALT)
Withdrawal Wed 15/08/1951 off Starbeck (50D)
Service Life 43 yrs, 6 mths , 15 dys

Disposal
Scrapping During 08/1951

Notes
Notes Cut up at Darlington

Allocations
Code Subsequent Codes Name From Date
SALT   Saltburn (New) m/e 02/1908
MID   Middlesbrough on 12/10/1933
HLD   Hull Dairycoates on 28/10/1937
MID   Middlesbrough m/e 06/1938
AUK   West Auckland on 01/01/1940
SKN   Stockton on 02/12/1941
DAR   Darlington on 18/05/1942
NLN   Northallerton on 25/01/1943
DAR   Darlington on 21/08/1943
NEV   Neville Hill on 08/01/1944
SBK   Starbeck on 12/03/1945
NEV   Neville Hill on 13/04/1947
SBK   Starbeck on 05/10/1947
     Withdrawn on 15/08/1951

SLS Allocations*
Type Code Name From Date
ALLOC NEV Neville Hill on 13/04/1947
ALLOC SBK Starbeck w/e 11/10/1947
WDN   on 15/08/1951

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
02/1908 Diagram 61 boiler fitted (number G658)
08/1916 Rebuilt from 4-6-0T to 4-6-2T with increased coal and water capacity
07/1920 Diagram 61 boiler fitted (number G666)
11/1922 Diagram 61 boiler fitted (number D1345)
26/01/1937 Diagram 61 boiler fitted (number D1989)
23/02/1946 Steam Brakes fitted
23/02/1946 Diagram 61 boiler fitted (number D1787)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Darlington Works 1920 07/1920   General Boiler number G666 (Diagram 61)
 
Darlington Works 1922 11/1922   General Boiler number D1345 (Diagram 61)
 
Darlington Works 10/03/1925 16/07/1925 129 days General    
Darlington Works 26/10/1926 24/02/1927 122 days General    
Darlington Works 28/01/1929 27/03/1929 59 days General    
Darlington Works 14/04/1931 29/05/1931 46 days General    
Darlington Works 07/11/1933 23/12/1933 47 days General    
Darlington Works 04/01/1934 11/01/1934 8 days Unclassified    
Darlington Works 02/08/1934 23/08/1934 22 days Light Repair    
Darlington Works 04/05/1936 19/06/1936 47 days Light Repair    
Darlington Works 19/11/1936 26/01/1937 69 days Heavy Boiler number D1989 (Diagram 61)
 
Darlington Works 30/03/1938 25/05/1938 57 days General    
Darlington Works 08/10/1942 24/11/1942 48 days General    
Darlington Works 17/08/1943 1 day Unclassified    
Darlington Works 30/12/1943 06/01/1944 8 days Unclassified    
Darlington Works 03/01/1946 23/02/1946 52 days General Downs sanding & T strap fitted
Boiler number D1787 (Diagram 61)
Steam Brakes fitted
 
Darlington Works 02/03/1946 05/03/1946 4 days Unclassified    
Darlington Works 11/11/1948 21/12/1948 41 days General Renumbered to BR 69794
 
Darlington Works 15/08/1951   No repairs    

Mentions ...
Report Date Title Report Source
31/12/1948 Darlington Works Locomotives awaiting Works during December included:-Nos. 952, 1437, 1625/41, 2378, 2970 (the last 'C.7'), 3368, 5639, 5650 (badly damaged at Jervaulx), 5693, 5759/97, 5807, 7278, 7651, 8010/37, 8155, 8292, 9792, 9892, 60510, 62732/33, 65056, 67704/05/10/19/23, 69910/33, 'Austerity' 70877, 77414/69. Locomotives ex Works during December included:-Nos. 60918/42/70, 61432, 61601/29/30/51, 62344/65, 62728/31/54, 63352, 63423, 65033, 65856, 67283, 67342, 67636/39/87, 67701, 68016 (altered bunker), 68264/75, 68436, 68696, 68745, 69102, 69794, 69842/79/89, 'Austerity' 77329. Locomotives broken up: Nos. 2390 an 3327. The two Class 'V.2's' which have hitherto been used as main line pilots, have now been replaced by Class 'A.3' Nos. 70 an 76. SLS/194902

Summary
Date Event Details Source See Also
02/1908 To Service To service as North Eastern Railway Number 690
Built at Gateshead Works, Works Number 88
Allocated to Saltburn (SALT)
Diagram 61 boiler fitted
   
08/1916 Modification Modification: Rebuilt from 4-6-0T to 4-6-2T with increased coal and water capacity    
1920 Works Visit Works Visit - Darlington Works (General) - Arr: ?/1920. Dep: ?/07/1920.
Work undertaken:
Boiler number G666 (Diagram 61)
   
1922 Works Visit Works Visit - Darlington Works (General) - Arr: ?/1922. Dep: ?/11/1922.
Work undertaken:
Boiler number D1345 (Diagram 61)
   
10/03/1925 Works Visit Works Visit - Darlington Works (General) - Arr: 10/03/1925. Dep: 16/07/1925.    
26/10/1926 Works Visit Works Visit - Darlington Works (General) - Arr: 26/10/1926. Dep: 24/02/1927.    
28/01/1929 Works Visit Works Visit - Darlington Works (General) - Arr: 28/01/1929. Dep: 27/03/1929.    
14/04/1931 Works Visit Works Visit - Darlington Works (General) - Arr: 14/04/1931. Dep: 29/05/1931.    
12/10/1933 Allocation Reallocated to Middlesbrough (MID)    
07/11/1933 Works Visit Works Visit - Darlington Works (General) - Arr: 07/11/1933. Dep: 23/12/1933.    
04/01/1934 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 04/01/1934. Dep: 11/01/1934.    
02/08/1934 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 02/08/1934. Dep: 23/08/1934.    
04/05/1936 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 04/05/1936. Dep: 19/06/1936.    
19/11/1936 Works Visit Works Visit - Darlington Works (Heavy) - Arr: 19/11/1936. Dep: 26/01/1937.
Work undertaken:
Boiler number D1989 (Diagram 61)
   
28/10/1937 Allocation Reallocated to Hull Dairycoates (HLD)    
30/03/1938 Works Visit Works Visit - Darlington Works (General) - Arr: 30/03/1938. Dep: 25/05/1938.    
06/1938 Allocation Reallocated to Middlesbrough (MID)    
01/01/1940 Allocation Reallocated to West Auckland (AUK)    
02/12/1941 Allocation Reallocated to Stockton (SKN)    
18/05/1942 Allocation Reallocated to Darlington (DAR)    
08/10/1942 Works Visit Works Visit - Darlington Works (General) - Arr: 08/10/1942. Dep: 24/11/1942.    
25/01/1943 Allocation Reallocated to Northallerton (NLN)    
17/08/1943 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 17/08/1943.    
21/08/1943 Allocation Reallocated to Darlington (DAR)    
30/12/1943 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 30/12/1943. Dep: 06/01/1944.    
08/01/1944 Allocation Reallocated to Neville Hill (NEV)    
12/03/1945 Allocation Reallocated to Starbeck (SBK)    
03/01/1946 Works Visit Works Visit - Darlington Works (General) - Arr: 03/01/1946. Dep: 23/02/1946.
Work undertaken:
Downs sanding & T strap fitted
Boiler number D1787 (Diagram 61)
Steam Brakes fitted
   
02/03/1946 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 02/03/1946. Dep: 05/03/1946.    
12/10/1946 Renumbered Renumbered to 9794    
13/04/1947 Allocation Reallocated to Neville Hill (NEV)    
05/10/1947 Allocation Reallocated to Starbeck (SBK)    
11/11/1948 Works Visit Works Visit - Darlington Works (General) - Arr: 11/11/1948. Dep: 21/12/1948.
Work undertaken:
Renumbered to BR 69794
   
08/1951 Scrapped Scrapped    
15/08/1951 Withdrawn Condemned as 69794 from Starbeck (50D)    
15/08/1951 Works Visit Works Visit - Darlington Works (No repairs) - Arr: 15/08/1951.    

prev prev