Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 21 Online
» 4040 Today
» 5422 Yesterday
» 25074 Week
» 123719 Month
» 326383 Year
» 3353236 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1946) 1055 on 04/07/1946
British Railways 61055   03/06/1949

Locomotive Specifics
Designer E. Thompson
Class B1
Company History LNER
Wheels 4-6-0
Builder North British Locomotive Company, Glasgow
Order Number L958
Works Number 25811
Fittings (as built)
Engine Brakes Steam
To Service Sun 04/07/1946 to Ipswich (IPS)
Withdrawal Sun 27/02/1966 off Doncaster (36A)
Service Life 19 yrs, 7 mths , 23 dys

Disposal
Scrapping During 04/1966 at T W Ward (Beighton)

Notes
Notes Sold 4/66 for scrap to T W Ward, Beighton

Allocations
Code Subsequent Codes Name From Date
IPS   Ipswich (New) on 04/07/1946
36A   Doncaster on 08/11/1959
36E   Retford Thrumpton (G.C.) on 16/09/1962
36A   Doncaster on 13/06/1965
     Withdrawn on 27/02/1966

SLS Allocations*
Type Code Name From Date
ALLOC 36A Doncaster 4w/e 28/11/1959
ALLOC 36E Retford Thrumpton (G.C.) 4w/e 06/10/1962
ALLOC 36A Doncaster 2w/e 26/06/1965
WDN   w/e 27/02/1966

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
16/01/1948 Front end heater connection fitted
16/01/1948 Diagram 100A boiler fitted (number 3619)
04/06/1949 Diagram 100A boiler fitted (number 9863)
07/04/1951 Diagram 100A boiler fitted (number 28538)
10/01/1953 Modified bogie springs fitted
10/01/1953 Diagram 100A boiler fitted (number 28594)
01/01/1955 Diagram 100A boiler fitted (number 28145)
25/01/1957 Diagram 100A boiler fitted (number 28569)
24/10/1958 Diagram 100A boiler fitted (number 28835)
03/08/1961 Diagram 100A boiler fitted (number 28579)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Stratford Works 31/03/1947 23/04/1947 24 days Light Repair    
Stratford Works 07/12/1947 16/01/1948 41 days General Boiler number 3619 (Diagram 100A)
Front end heater connection fitted
 
Stratford Works 01/04/1949 04/06/1949 65 days General Boiler number 9863 (Diagram 100A)
Renumbered to BR 61055
 
Stratford Works 09/07/1949 23/07/1949 15 days Light Casual    
Stratford Works 24/11/1949 02/12/1949 9 days Unclassified    
Stratford Works 26/03/1950 12/05/1950 48 days Light Casual    
Stratford Works 19/02/1951 07/04/1951 48 days General Boiler number 28538 (Diagram 100A)
 
Stratford Works 19/08/1952 22/08/1952 4 days Unclassified    
Stratford Works 24/11/1952 10/01/1953 48 days General Boiler number 28594 (Diagram 100A)
Modified bogie springs fitted
 
Stratford Works 26/05/1953 24/07/1953 60 days Light Casual    
Stratford Works 22/11/1954 01/01/1955 41 days General Boiler number 28145 (Diagram 100A)
 
Stratford Works 05/09/1955 29/09/1955 25 days Light Casual    
Stratford Works 11/12/1955 25/01/1957 412 days General Boiler number 10812 (Diagram 100A)
 
Stratford Works 15/09/1958 24/10/1958 40 days General Boiler number 28835 (Diagram 100A)
 
Stratford Works 04/11/1958 05/11/1958 2 days Unclassified    
Doncaster Works 04/07/1960 15/07/1960 12 days Unclassified    
Doncaster Works 06/07/1961 03/08/1961 29 days General Boiler number 28579 (Diagram 100A)
 

Mentions ...
Report Date Title Report Source
16/07/1961 Doncaster Works (Erecting Shop) New Erecting Shop: D2395/6, E3064-9, 13253. Boiler Shop: E3071/2. Stripping Road: D2235, 60044/56/63/94, 60502, 61088, 61803, 61902, 73043. Scrap Road: 61824, 61927/64, 64736, 69531 intact, 68951 just cut up. Crimpsal: 60150, 61204. Outside Crimpsal: 60147, 62015, 70034. Erecting Shop: D3446/9, D3660, D5560/72, D8212, 12124, 60022/30, 60155, 60519, 61055, 61157/95, 61208, 61312/26, 61846, 70009/18/38/9, 76050. Outside Erecting Shop: DEPT7, 60034. Weigh House: Nil. Outside Weigh House: 60029, 61906. Paint Shop: D2234, D2394, D5571, D6722, E3063, 60009/73, 61056, 61378, 61893. Outside Paint Shop: D353, D5806, D9008. Works Shunters: DEPT10/1. SLS/196109

Summary
Date Event Details Source See Also
04/07/1946 To Service To service as London and North Eastern Railway Number 1055
Built at North British Locomotive Company, Glasgow, Works Number 25811
Allocated to Ipswich (IPS)
   
31/03/1947 Works Visit Works Visit - Stratford Works (Light Repair) - Arr: 31/03/1947. Dep: 23/04/1947.    
07/12/1947 Works Visit Works Visit - Stratford Works (General) - Arr: 07/12/1947. Dep: 16/01/1948.
Work undertaken:
Boiler number 3619 (Diagram 100A)
Front end heater connection fitted
   
01/04/1949 Works Visit Works Visit - Stratford Works (General) - Arr: 01/04/1949. Dep: 04/06/1949.
Work undertaken:
Boiler number 9863 (Diagram 100A)
Renumbered to BR 61055
   
09/07/1949 Works Visit Works Visit - Stratford Works (Light Casual) - Arr: 09/07/1949. Dep: 23/07/1949.    
24/11/1949 Works Visit Works Visit - Stratford Works (Unclassified) - Arr: 24/11/1949. Dep: 02/12/1949.    
26/03/1950 Works Visit Works Visit - Stratford Works (Light Casual) - Arr: 26/03/1950. Dep: 12/05/1950.    
19/02/1951 Works Visit Works Visit - Stratford Works (General) - Arr: 19/02/1951. Dep: 07/04/1951.
Work undertaken:
Boiler number 28538 (Diagram 100A)
   
19/08/1952 Works Visit Works Visit - Stratford Works (Unclassified) - Arr: 19/08/1952. Dep: 22/08/1952.    
24/11/1952 Works Visit Works Visit - Stratford Works (General) - Arr: 24/11/1952. Dep: 10/01/1953.
Work undertaken:
Boiler number 28594 (Diagram 100A)
Modified bogie springs fitted
   
26/05/1953 Works Visit Works Visit - Stratford Works (Light Casual) - Arr: 26/05/1953. Dep: 24/07/1953.    
22/11/1954 Works Visit Works Visit - Stratford Works (General) - Arr: 22/11/1954. Dep: 01/01/1955.
Work undertaken:
Boiler number 28145 (Diagram 100A)
   
05/09/1955 Works Visit Works Visit - Stratford Works (Light Casual) - Arr: 05/09/1955. Dep: 29/09/1955.    
11/12/1955 Works Visit Works Visit - Stratford Works (General) - Arr: 11/12/1955. Dep: 25/01/1957.
Work undertaken:
Boiler number 10812 (Diagram 100A)
   
15/09/1958 Works Visit Works Visit - Stratford Works (General) - Arr: 15/09/1958. Dep: 24/10/1958.
Work undertaken:
Boiler number 28835 (Diagram 100A)
   
04/11/1958 Works Visit Works Visit - Stratford Works (Unclassified) - Arr: 04/11/1958. Dep: 05/11/1958.    
08/11/1959 Allocation Reallocated to Doncaster (36A)    
04/07/1960 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 04/07/1960. Dep: 15/07/1960.    
06/07/1961 Works Visit Works Visit - Doncaster Works (General) - Arr: 06/07/1961. Dep: 03/08/1961.
Work undertaken:
Boiler number 28579 (Diagram 100A)
   
16/09/1962 Allocation Reallocated to Retford Thrumpton (G.C.) (36E)    
13/06/1965 Allocation Reallocated to Doncaster (36A)    
27/02/1966 Withdrawn Condemned as 61055 from Doncaster (36A)    
04/1966 Scrapped Broken up by T W Ward: Beighton    

prev prev